CHOLAMANDALAM MS RISK SERVICES LTD. www.cholarisk.com
ELECTRICAL SAFETY AUDIT Manage Risks Profitably
2
WHY ELECTRICAL SAFETY AUDITS
As Per FPA, UK & NFPA, US, 25% Of fires Are Due to Electrical Installations. Indian Scenario- 40% fires due to Electrical Causes 8 % Fatalities in Indian Factories Are Due to Electrical Causes
3
STATUTORY REQUIREMENT
Indian Electricity Rule # 29 (1) “All Electric Supply Lines & Apparatus Shall be of Sufficient Ratings for Power, Insulation and Estimated Fault current and of Sufficient Mechanical Strength, for the Duty Which They May Be Required to Perform Under The Environmental Conditions of Installation, and Shall be Constructed, Installed Worked and Maintained in Such a Manner so as to Ensure Safety of Human Beings, Animals and Property”. (2) “The Relevant Code of Practice or the BIS If any may be followed to carry out the purpose of this Rule and in the Event of any Inconsistency, the provision of this Rule Will Prevail”.
4
ELECTRICAL RISK MANAGEMENT SERVICES
SUBJECTIVE EVALUATION OBJECTIVE EVALUATION Earth Resistance Tests Hotspot Measurement IR Measurement Overload Detection Thermography Surveys (Tie-Up with NPC) Physical Inspection Statutory Compliance Operations Review Equipment Lay out
5
EB PP TRANSFORMER POWER CONTROL CENTRE CRITICAL LOAD LOAD DISTRIBUTION EQUIPMENT
6
SAMPLE TESTS Earth Resistance Insulation Resistance Hotspot Detection
Load Current Measurements
7
HOTSPOT DETECTION “All electrical failures are preceded by abnormal temperature and sound” Infra-Red Laser Guided Hot Spot Detection (Available with CMSRSL) Ultra-Sound Detector
8
ELECTRICAL HOTSPOT DETECTION EQUIPMENT
9
ELECTRICAL SAFETY AUDIT MAJOR FINDINGS
Elevation of buildings & structures-not considered for LP design Protection relays- deviation from original design settings RCCBs- wrong sensitivity,bypassing & location Earth continuity- not tested Use of ordinary copper wire in fuses Statutory violations
10
FINDINGS…. EPM system- heavy slippage in implementation
Electrical accident investigation- Root cause rectification exercise not carried out LHS cable ineffective installation practice Passive fire protection inadequacies Hotspots in LDB due to unequal load balancing No updated reference drawing Wrong earth pit identification Flameproof Equipment maintenance Tracking problem in MCCs due to dust deposits
11
FINDINGS…. OLTC- counter meter readings not taken
Cables added w/o considering derating factors Insufficient baffle wall height between transformers Wrong OTI/WTI Setting Wrong feeder identification
12
FOCUSSED ERM REVIEWS Hazardous Area Classification, review of special equipment Earthing Tests (IR, E, O/L) EPM Equipment Layout Cable Size Adequacy Fire Protection (Active & Passive) IER Compliance Lightning Protection ESD Hazards Shocks & Fires Protection Devices Hotspot Detection Thermography Surveys
13
SOFTWARE AVAILABLE WITH CMSRSL
Lightning Risk Calculator (Based On Australian Standard) Hani Rafat Risk Calculator EXTool -SWISS Re HAZOP, FMEA, What If, Job Safety Analysis Risk Management Planning Software (Based on EPA, US) PHAST & SAFETI (Tie-Up) FPES (National Building Code)
14
Manage Risks Profitably
THANK YOU!! BENEFIT COST LOSS PREVENTION Manage Risks Profitably