CJLOTS 2013 Daily Synch – 11APR13. Schedule – 12APR13 Friday, 12APR13 0900 CUB Rehearsal 1530 Daily Synch Brief.

Similar presentations


Presentation on theme: "CJLOTS 2013 Daily Synch – 11APR13. Schedule – 12APR13 Friday, 12APR13 0900 CUB Rehearsal 1530 Daily Synch Brief."— Presentation transcript:

1 CJLOTS 2013 Daily Synch – 11APR13

2 Schedule – 12APR13 Friday, 12APR13 0900 CUB Rehearsal 1530 Daily Synch Brief

3 Marshalling Yard/DLA Yard LSA 498 II (+) CSSB 551 ICTC I (-) II (+) 10 Trident Pier OPNS Barber Power Beds Showers Laundry DFAC LSA OPNS Shuttle IPDS/OPDS OPNS Usage Mvmt Bld Marshall Yard OPNS Sp-SY Pax Trucks MHE Sp-JLOTS Sp-DLA Sp-ROK Beach Mar Yard On Mvmt Dnload Ssang Yong OPNS Beach Head OPNS ROK Weather Terrain MHE ARFOR Reception Staff Facility PAX FOC IOC Not Started Critical Issue X (-) 501 SBDE LAST 24 Hours 10APR JTF CDR arrives in Korea, JTF Temp TOC set- up 10APR DCO meeting by TF498 with Reserves on IPDS build 10APR Marshalling Yard ROC Drill 10APR Camp Carroll LOGPAC 10APR HSV ISO IIIMEF arrives 10APR Barber Shop opens on the LSA NEXT 24-48 Hours 11APR LSV 4 arrives from Hawaii 11APR 2x LCU 2000’s arrived from Japan 11APR Combined Convoy with ROK for CL I resupply to Busan 12APR Laundry, Galley, Barber Shop operational at LSA 12APR Camp Carroll LOGPAC 12-13APR Duck Pond Build (D7 Dozer) Pohang BOG Total ARFOR 555 Total JTF/Other 299 Total BOG 854 SIGACT: NSTR CCIRs Activated: FIR #7 JRC Incheon JRC Gimhae Staff Shuttle PAX Staff Shuttle PAX Essential Node Legend In-Brief ROWPU Pier 9 OPNS BD Crane MHE HCCC TF 498 TOC TF 10 TOC ARFOR TOC MWR PX Coms CLI/Wtr FMST Beach Stab Duck Pond MCS Segments Trial Runs Latrines ARFOR COP Pohang View 11 APR 13 COMMANDERS COMMENTS: COMM STAT * Network provided by ARFOR Assets ARFORLSABEACHPIER 9MARSH YARD JNN1/1N/A1/1*N/A COVN-K1/1 1/1*N/A CPNN/A1/1N/A BFT TOC KIT1/1 N/A FM8/822/221/1 HF1/1 N/A SC-TACSAT1/10/1N/A CSSVSATN/A 1/1 MAR BANDN/A 1/1 N/A Showers 501st SBDE Top 10 Critical Fleet ITEMQTYFMCNMC M175 PLS11 0100% M1120 LHS HEMTT880100% M1077 FLATRACK19 0100% M3 CROP990100% ATLAS 10K FORK LIFT65083% RT240 KALMAR770100% M997 AMBULANCE220 100% ROWPU 3K2020% ROWPU 600 GAL32167% LWP330100% SMFT330100% M984A4 HEMTT WRK440100% M969A1 FUEL TANKER330100% M1083 TPU440100% M978 HEMTT TANKER330100% OVER ALL TOTAL8784397%

4 NBG 1 Update – 11APR13 Last 24 Hours -Continued fabrication of decking. - Continued establishment of C2 nodes & supporting facilities at the beach and pier. (Facilities at Dogu Beach include: JLCC, J-Staff admin tent, NSE comms tent & SIPR tent. Facilities at the pier include: Lighterage Support Center (LSC), Lighterage Repair Facility (LRF), Battalion Aid Station (BAS) (medical), Underwater Construction Team (UCT) admin/ops tent, and warming tent.) - Held additional meetings with Army & Marine counterparts to discuss the flow of cargo at the beach and beach space management. - Received NSE main body (143 total personnel from PHIBCB ONE (114), ACU-1 (17), UCT TWO (7) & NBG-1 (4)) tonight. Next 24 Hours Comments/Concerns 190 NSE personnel currently on board the LSA -Continue work at beach & pier C2 nodes and supporting facilities. - Participate in additional coordination meetings as required for beach throughput and space management. -Prepare for opening of galley, laundry & barber services.

5 Daily Status Report -Staff continues to gather; Coast Guard, ROK, 501st LNOs have reported in and begun operations. CNFK observers are on station. -Conducted JOC leveling/Conops brief with watchstanders and MSC personnel. -LSV arrival is expected at 0200L this evening (4 hours later than projected). -2 LCU's arrived as expected this afternoon. -Continued coordination of beach area to support layout of IPDS has not produced a solution yet.

6 Work in Progress -Retrograde Planning (CDR Sumagaysay) -CUB Shell (LTJG Weston / CPT Gerlach) -ISDN Listing (MSgt Lawson) -Night Order Shell (OS2 Bryant) -AAR Tracking/Reporting (CDR Freeman)

7 POC CUB Collators: -ABWC: LTJG Jill Weston -ABWC: CPT Eddie Gerlach -ABWC: LT Rob Mack

8 Requirements -