1 HV system migration to USB interface Presented by Korolev M.

2 Outline Current situation  HV Control Unit Hardware  Proposed HV System layout  HV Control Unit Software  HV System Current calibration Planning for 2011 year 2Bondar N. Korolev M. Maev O.

3 Current situation  HV Control Unit Hardware Back plane A-Side output connectors C-Side output connectors 5 channel interface for A-Side 5 channel interface for C-Side USB connectors 2 pc. of HV Control Units are assembled, debugged and tested Problems: -Opal Kelly changed Firmware as a result the project was changed - Few small mistakes in assembly Bondar N. Korolev M. Maev O.

4 HV System C Matsusada HV CU HV System A Matsusada PC HVM Server A PC HVM Server C USB RS232 HV Ethernet USB RS232 Current situation  Proposed HV System layout

5 5Bondar N. Korolev M. Maev O. Current situation  HV Control Unit Software Main part of SW for HV Control Unit is almost ready. Debugging and testing is in progress. Control tasks:  Control and monitoring Master Boards (MB)  Control and monitoring Remote Distribution Boards (RDB)  Control and monitoring Matsusada PS  Smart output current monitoring 1.Soft trip 2.Trip  Exchange information with PVSS

6 Bondar N. Korolev M. Maev O.6 Current situation  output current and voltage sensors calibration In order to have more precise current measurements a new procedure of current sensors calibration has been developed. -The RDB test load box with 3 nominal resistors are assembled Scale divided on three regions: 0-4 muA (~+-2-3 nA precision) – 1GOhm res. 4-40 muA (+- 10 nA precision) – 100 MOhm res. 40 -100 muA(+-100 nA precision) – 10MOhm res. - Special tool for measurement RDB and MB high voltage is prepared -SW for calibration of HV and current sensors is in progress

7 We are planning to migrate to new HV Control Unit during of 2012 year shutdown. To meet this milestone we need complete the following tasks:  debugging and testing of HV Control Unit SW  HV Control Unit Software implemented to PVSS – Who?  Implemented some tests in situ  Solve the problem with LV for RDB Visits to CERN for Korolev M. for 2011 y - 4-6 months for the next year Bondar N. Korolev M. Maev O.7 Planning for 2011 year