Presentation is loading. Please wait.

Presentation is loading. Please wait.

Tiziana Ferrari, INFN-CNAF I Workshop INFN-GRID

Similar presentations


Presentation on theme: "Tiziana Ferrari, INFN-CNAF I Workshop INFN-GRID"— Presentation transcript:

1 Tiziana Ferrari, INFN-CNAF I Workshop INFN-GRID
Work package 5 – Network Task, Partecipazione, Programma e Richieste Finanziarie Tiziana Ferrari, INFN-CNAF I Workshop INFN-GRID Tiziana Ferrari

2 Work Package Task LAN/fabric networking.
Evaluation of networking issues related to the fabric architectures under analysis in WP2. FTP Study of standardization status of the ftp protocol at IETF; Experimental evaluation of prototypes of the grid ftp, i.e. of different implementations of the extended ftp protocol under definition at the Grid Forum: e.g. gsiftp (Globus), NCftp (NASA) and Washington University ftp; Contribution to the definition of the extensions of the ftp protocol in collaboration with the Grid Forum; evaluation of the possibility to extend the protocol definition for the support of file transfer in a multicast scenarios through reliable multicast. Tiziana Ferrari

3 Work Package Task (cont)
Reliable Multicast Study of state of the art of reliable multicast for the evaluation of the maturity of this architecture currently under study at IRTF; Evaluation of the applicability of reliable multicast to replica management (sub-task to be developed in collaboration with WP2 of Data Grid) and for information exchange GRIS  GIIS Experimentation of reliable multicast-based ftp prototypes; Study of applicability of multicast extensions to ftp in the framework of the Grid Forum. IBP Evaluation of networking issues related to the IBP protocol; Evaluation of IBP data server distribution in the wide area. Tiziana Ferrari

4 Work Package Task (cont)
Client-server connection methodologies Network = operazione di I/O all'interno di un sistema operativo (MPI, database distribuiti, DFS, AFS.....); estensibilita’ del sistema operativo alla rete; Network = interconnessione di server e client (server FTPS, WEB,...); modelli client/server, interfacce e protocolli. Traffic Monitoring at network and application level - to be applied to Testbed 0 and following releases; adaptation/refinement of an existing monitoring tools Tiziana Ferrari

5 Work Package Task (cont)
MPLS Experimental study traffic engineering VPN QoS INFN-GRID test bed, TF-NGN WDM/dWDM Technology tracking LAN and WAN (TF-NGN) Tiziana Ferrari

6 Participation 1. LAN/fabric networking (coordination: F.Costa)
F. Costa INFN-PD L. Gaido INFN-TO 2. ftp (coordination: A.Forte/G.Tortone) A. Chierici, T. Ferrari INFN-CNAF A. Forte, L. Gaido, S. Lusso, INFN-TO P. Mastroserio, G. Tortone INFN-NA 3. Reliable multicast (coordination: T.Ferrari) T. Ferrari INFN-CNAF R. Gomezel INFN-TS 4. IBP (coordination: L.Gaido) P. Mastroserio INFN-NA L. Gaido, S. Lusso INFN-TO 5. Client-server connection methodologies (SOAP) (coordination: G.Mirabelli/A.Ghiselli) A. Ghiselli INFN-CNAF G. Mirabelli INFN-Roma1 S. Barale INFN-TO R. Gomezel INFN-TS Tiziana Ferrari

7 Participation (cont) 6. Traffic monitoring (coordination: P.Lo Re/G.Sava) T. Ferrari, A. Italiano INFN-CNAF G. Sava INFN-CT P. Lo Re INFN-NA R. Gomezel INFN-TS Netgroup ? 7. MPLS (coordination: T.Ferrari) A. Chierici, T.Ferrari INFN-CNAF S. Lusso INFN-TO 8. WDM/dWDM (coordination: T.Ferrari) T. Ferrari INFN-CNAF S. Lusso, S. Barale INFN-TO R. Gomezel INFN-TS Tiziana Ferrari

8 Manpower G. Sava INFN-CT 20 % 30 % datagrid, TM P. Lo Re INFN-NA 30 %
P. Mastroserio " % G. Tortone " % F. Costa INFN-PD % G. Mirabelli INFN-Roma1 20 % S. Barale INFN-TO % A. Forte " % L. Gaido “ % S. Lusso " % R. Gomezel INFN-TS % A. Chierici INFN-CNAF % T. Ferrari " % % datagrid, RM, TM, MPLS, WDM A. Ghiselli " % A. Italiano " % Tiziana Ferrari

9 Resoconto attivita’ e piano a breve termine
FTP: Test di Globus ftp tra NA, PD, TO, CNAF ftp resume, striped ftp, autenticazione, TCP tuning PIANO: test di Globus ftp su linee a 2.5 Gbps (GARR-G) Reliable multicast Raccolta di documentazione e studio Studio di applicabilita’ (DB management, Information service) IBP: Studio PIANO: verifica di fattibilita’ del test di un prototipo IBP (specifica v.1.0, client/server, librerie) Tiziana Ferrari

10 Resoconto attivita’ e piano a breve termine (cont)
Client-server connection methodologies Completamento specifiche Inizio attivita’ di studio Traffic monitoring Application: Throughput monitoring Network: RIPE Test Box (delay, jitter, packet loss, routing), pinger PIANO: applicazione degli strumenti estendendoli al testbed MPLS: PIANO: VPN e traffic engineering su reti a larga banda e con qualita’ di servizio (PlaGe) Tiziana Ferrari

11 Richieste finanziarie
Centro/Sezione num trasferte trasferte HW pers Italia WP5 Estero WP7 (Mlire) (Mlire) (Mlire) WP7 Oxford GGF2 Roma TOT CNAF CT NA Roma PD TO TS Tot (Ml) Tiziana Ferrari


Download ppt "Tiziana Ferrari, INFN-CNAF I Workshop INFN-GRID"

Similar presentations


Ads by Google