1 OPTI 521 Presentation By Tianquan Su

2 Background MissionLaunch WorkFail

3 Failure Further analysis and computer simulation of the WF/PC images indicated that 0.5-waverms wavefront spherical aberration at 547nm, which could not be eliminated by adjustment.

4 Where is the problem? Only spherical aberration, no coma: -- probably the primary mirror

5 About the primary mirror The primary mirror is an aspherical mirror with 2.4m diameter. It should have 0.04 wave rms wavefront error at 632.8 nm.

6 Why it was misshaped -- wrong testing Three measures used in the testing of the primary mirror: o Refractive Null Corrector (RvNC) -- whose data showed the mirror flaw that match with the telescope error o Reflective Null Corrector (RNC) -- whose data showed the mirror has no flaw o Inverse Null Corrector (test the RvNC by stimulate the mirror) -- whose data also showed aberration Funny thing is the manufacturer, Perkin-Elmer Corporation (P-E), trusted the only black sheep of the three

7 What is RNC? RvNC (refractive null corrector) RNC (reflective mull corrector) RNC structure

8 Testing Chamber

9 What’s wrong with it?

10 What’s wrong with RNC The metering rod (with the field cap on)

11 The initiator of evil Top view of the field cap

12 Lesson learned -- don’t but your eggs in one basket!

13 Thank you!