Presentation is loading. Please wait.

Presentation is loading. Please wait.

Core Services I & II David Hart Area Director, UFP/CS TeraGrid Quarterly Meeting December 2008.

Similar presentations


Presentation on theme: "Core Services I & II David Hart Area Director, UFP/CS TeraGrid Quarterly Meeting December 2008."— Presentation transcript:

1 Core Services I & II David Hart Area Director, UFP/CS TeraGrid Quarterly Meeting December 2008

2 Action Item!! Advanced Support Program (Collaboration with TeraGrid Staff) Indiana University Gateway/Web Service Hosting (Quarry) Indiana University IBM e1350 (Big Red) Indiana University RenderPortal/Windows Condor Pool NCAR IBM Blue Gene (Frost) NCSA/LONI Dell PowerEdge Linux Clusters (Abe/Queen Bee) NCSA Dell with NVIDIA Tesla S1070 GPU Cluster (Lincoln) NCSA SGI Altix (Cobalt) ORNL Intel Xeon Cluster (NSTG) NICS Cray XT4 (Kraken) PSC XT3 (Big Ben) PSC SGI Altix (Pople) Purdue Condor Pool Purdue Dell PowerEdge Linux Cluster (Steele) Purdue Distributed Rendering Environment (TeraDRE) Purdue FPGA Prototyping Environment (Brutus) TACC Dell Linux Cluster (Lonestar) TACC Sun Constellation Cluster (Ranger) TACC Sun Visualization System (Spur) TeraGrid Clusters TeraGrid Wide Roaming Access UC/ANL Visualization Cluster GPFS-WAN Disk Space Indiana University Data Collections and Database Dedicated (Nonpurged) Disk Space Indiana University HPSS Archival Storage NCSA Data Resource Services NCSA Database NCSA Tape Storage SDSC Tape Storage We need RP resource changes for the March allocations cycle 2

3 Outline Current Status PY5 challenges/changes –Absorbing Core Services effort in PY5 GIG budget TRAC Meeting costs (12/09, 3/10) Transition to XD –Infrastructure: NCSA, SDSC, TACC –June 2010 TRAC meeting 3

4 Core Services I & II: Status Core Services I –Allocations Process: Adapting to Alloc. RAT recommendations –POPS: Extracted from NCSA’s local accounting system and moving forward –New Users: Adapting to new POPS environment –Accounting System: New AMIE version Core Services II  UFC-DEV –Continued POPS improvements –Better user/allocation management in TGUP –Better process for creating new users –Better system for RPs to provide resource info (RDR) 4

5 Major Current Challenges Startup Review Process –Single Startups simpler for users, but RP requirements make managing the process more complex –All for requests with a 93% success rate WebSphere Delays –Impacts other efforts, e.g., portal customization, self- creation of user portal logins. TRAC process/policy changes –Implementation still keeping up 5

6 PY5 Challenges Absorbing effort supported by Core Services award into GIG budget –POPS operations and updates (NCSA) –Accounting infrastructure support (SDSC, NCSA) –Allocations process coordination (TACC, NCSA) ~6 FTEs plus expenses for 2 TRAC meetings –Affected sites are reducing the FTE counts –December 2009 and March 2010 meetings 6

7 Transition to XD Process Continuity Issues –Decommissioning RP/HPCOPS resources on 3/31/2010 Lots of resources ending, lots of transfers, etc. Allocations starting on or after 4/1/09 (submitting proposals through 1/15/09!) will have to consider transition. –Unlikely XD can spin up allocations process on April 1, 2010, even assuming XD picks up Allocations process “as is” TeraGrid will have to continue day-to-day operations OR Operational planning will have to take place prior to April 1 Incoming Startups, existing allocations, new user processes –June 2010 TRAC meeting Request submission would be March 15-April 15, 2010 Hotel logistics would need to start early 2010 7

8 Transition to XD (2) Infrastructure Issues –POPS: hosted at NCSA Dependent on NCSA Sybase Otherwise moveable –Security/Authentication: hosted at NCSA Dependent on NCSA MyProxy, Kerberos, CA, user vetting apps New XD will need comparable security infrastructure and transition users –TGCDB/AMIE: hosted at SDSC (failover at PSC) All moveable, potentially by moving actual hardware. –TGUP/Web: hosted at 3 rd party site, 3-year contract terms Can be handed off IU KB content would have to be exported 8


Download ppt "Core Services I & II David Hart Area Director, UFP/CS TeraGrid Quarterly Meeting December 2008."

Similar presentations


Ads by Google