1 MODERNISATION OF POWER SYSTEM OPERATION ULDC SCHEMEs

2 POWERGRID IS IMPLEMENTING ULDC SCHEMES IN ALL THE FIVE REGIONS WITH STATE OF THE ART SCADA ENERGY MANAGEMENT SYSTEM AND DEDICATED COMMUNICATION SYSTEM UNIFIED LOAD DESPATCH & COMMUNICATION (ULDC) SCHEMES

3 OBJECTIVES REAL TIME MONITORING & CONTROL OF POWER SYSTEM OPERATION REAL TIME MONITORING & CONTROL OF POWER SYSTEM OPERATION REAL TIME ENERGY MANAGEMENT SYSTEM REAL TIME ENERGY MANAGEMENT SYSTEM * OPERATION SCHEDULING * POWER SYSTEM ANALYSIS * OPTIMUM LOAD GENERATION BALANCE DYNAMIC PLANNING FOR RELIABLE SYSTEM OPERATION DYNAMIC PLANNING FOR RELIABLE SYSTEM OPERATION REAL TIME EVALUATION OF IMPACT OF POSSIBLE CONTINGENCIES ON THE SYSTEM REAL TIME EVALUATION OF IMPACT OF POSSIBLE CONTINGENCIES ON THE SYSTEM PREVENTIVE ACTION TO ENSURE SYSTEM STABILITY PREVENTIVE ACTION TO ENSURE SYSTEM STABILITY

4 QUICK RESTORATION OF GRID IN CASE OF DISTURBANCE QUICK RESTORATION OF GRID IN CASE OF DISTURBANCE COORDINATED CONTROL OF MVAR & LOAD FLOW TO MAINTAIN OPTIMUM VOLTAGE & FREQ. PROFILES COORDINATED CONTROL OF MVAR & LOAD FLOW TO MAINTAIN OPTIMUM VOLTAGE & FREQ. PROFILES OPERATION OF SYSTEM AT IT ’ S FULL CAPACITY THROUGH CONTINUOUS CONTINGENCY ANALYSIS OPERATION OF SYSTEM AT IT ’ S FULL CAPACITY THROUGH CONTINUOUS CONTINGENCY ANALYSIS EFFICIENT, RELIABLE & SECURED OPERATION OF GRID WITH ALL SYSTEM PARAMETERS & NETWORK CONDITIONS UPDATED EVERY 4 TO 15 SEC EFFICIENT, RELIABLE & SECURED OPERATION OF GRID WITH ALL SYSTEM PARAMETERS & NETWORK CONDITIONS UPDATED EVERY 4 TO 15 SEC REAL TIME ENVIRONMENT FOR TRAINING DESPATCHERS TO COPE WITH CONTINGENCIES REAL TIME ENVIRONMENT FOR TRAINING DESPATCHERS TO COPE WITH CONTINGENCIES

5 SYSTEM CO-ORDINATION & CONTROL PROJECT (NORTHERN REGION) J F H H H H H Chandigarh,BBMB DESU Lucknow Panipat(HSEB ) Jutog H Patiala F F F F F Panipat (BBMB) F Dadri (B) Dadri (H) F F Sultanpur F Moradabad F Varanasi F Rishikesh F Bhilwar a F Kota F Ratangar h F Narwana F Hamirpur F Kunihar F Laltonkalan F Jallandhar (P) F Jallandhar (B) F Ganguwal (B) H Heerapura F H Pakistan N e pa l China Jammu & Kashmir Himachal Pradesh Punjab Hary Uttar Pradesh Rajasthan Delhi Gujara t Madhya Pradesh F Bemina J&K SEB 1 SLDC 1 Sub-LDC 13 RTUs PSEB 1 SLDC 2 Sub-LDC 19 RTUs HVPNL 1 SLDC 2 Sub-LDC 40 RTUs RVPN 1 SLDC 3 Sub-LDC 21 RTUs HPSEB 1 SLDC 2 Sub-LDC 16 RTUs BBMB 1 SLDC 4 Sub-LDC 21 RTUs DVB 1 SLDC 4 Sub-LDC 31 RTUs UPPCL 1 SLDC 5 Sub-LDC 82 RTUs RLDC NEW DELHI 38 RTUs CPCC KANPUR 4 RTUs SLDC Sub - LDC H F Gladni Panki ana

6 Control System Hierarchy For Northern Region SLDC UPSEB SLDC HVPNL SLDC PSEB SLDC RVPNL SLDC J&K SLDC BBMB SLDC HPSEB SLDC DVB CPCC Kanpur Sub-LDC (RTUs) Moradabad (17) Panki (13) Rishikesh (27) Sultanpur (8) Varanasi (16) (RTU-L) Lucknow Bhilwara (29) Ratangarh (12) Kota (11) Panipat (12) Narwana (15) Dadri (14) Patiala (12) Jalandhar II (20) Lalton Kalan (8) Gladini (8) Bemina (8) Hamirpur (8) Kunihar (8) Dadri (5) Ganguwal (6) Jalandhar I (4) Panipat (5) Bawana (5) Bamanauli (12) Gazipur (8) Gopalpur (5) RTUs - 6 (RTU-L) Panipat (RTU-L) Chandigarh (RTU-L) Minto Road RSCC Delhi RTUs - 36 Heerapura ( 12)

7

8 Unique Features of Northern Region ULDC Scheme Three Level Hierarchical Control centres More than ten electrical utilities involved Highly Complex system First Time attempted in the world as a Single Project Dedicated communication Infrastructure Live Line Fibre Optic Cable Stringing More than 30 control centres and 400 RTUs Advance Despatcher training Simulator

9 TYPICAL HIERARCHICAL REGIONAL CONTROL CENTRE SETUP RTU SUB LDC SLDC ERLDCWRLDCNRLDCSRLDCNERLDC REGIONAL LOAD DESPATCH CENTRE STATE LOAD DESPATCH CENTRE AREA LOAD DESPATCH CENTRE REMOTE TERMINAL UNIT (AT SUB-STATIONS & GENERATING STNS)

10 IMPLEMENTATION STATUS OF REGIONAL ULDC SCHEMES IN VARIOUS REGIONS REGIONEST. COST (M US $.) STATUSCOMPLETION ANTICIPATED NORTHERN141COMMISSIONING OF MAJOR SYSTEMS COMMENCED JUNE 2002 SOUTHERN151COMMISSIONING OF MAJOR SYSTEMS COMMENCED JUNE 2002 NORTH EASTERN57UNDER CONSTRUCTIONJUNE 2003 EASTERN62UNDER CONSTRUCTIONSEP 2003 WESTERN56PROCUREMENT ACTION INITIATED FEB 2005

11

12 POWERGRID’s Strategic Plan for Diversification into Telecom Business

13 Convergence - merging and overlapping of traditionally unrelated industries to provide essential services –provides opportunity to add value to the business Power Transmission utilities can provide alternative broadband network at incremental cost –Valuable Right-of-Way readily available –Optimal utilisation of infrastructure –Sturdy and stable infrastructure –Less prone to vandalism and rodent menace –Proven technology CONVERGENCE

14 WRAP AROUND ADSS FIBRE OPTIC CABLE INSTALLATION OPGW

15 ADSS WRAP AROUND AERIAL OPTICAL FIBRE CABLES FIBRE STRENGTH MEMBERS LOOSE TUBE ALUMINIUM TUBE ACSR STRANDS FIBRE

16 FIBRE PAIRS TO BE USED BY POWERGRID LDCA TAX DARK FIBRE PAIRS SDH / DWDM Transport Module Capacity Eq. voice channels STM - 1 155 Mbps 1920 STM - 4 622 Mbps 7500 STM - 16 2.5 Gbps 30000 STM - 64 10.0 Gbps 120000 DWDM N * 2.5N*2.5 Gbps N*30000 N *10N*10 GbpsN*120000 For example 32*2.5 80 Gbps 960000 32*10320 Gbps 3840000 Single pair of fibres LDCA TAX

17 WORLDWIDE DIVERSIFICATION IN TELECOM World wide utilities like electric, gas, railways, water and roads have successfully diversified into telecom business Electric - 63%, Gas - 18%, Railways - 12%, Water - 7% and Roads - 2% Majority of these utilities are Transmission Utilities Out of about major 50 utilities, 30 are Transmission Utilities in UK, Germany, Italy, Spain, Japan, USA etc. New entrants have been successful in penetrating long distance market

18 Optimal point Business Reward Business Risk Do Nothing Lease Wayleave Lease Dark Fibre Selective Commercial Service Full Network Service BUSINESS RISK / REWARD ASSESSMENT

19 Phased Scheme of Implementation POWERGRID plans to enter Telecom business in a phased manner  Phase-I (Selective Commercial Services) –Utilise the spare/ excess capacity already available under modernisation of load despatch and communication facilities –Enter Telecom business as IP-II & introduce value added services Internet Data Centers and Managed Network Services to be introduced in 1-2 year time International Connectivity  Phase-II ( NLDO Participation)  To enter into NLDO segment with a strategic partner by forming a Joint Venture Company

20 Telecom Road Map POWERGRID Builds and operates Capacity Business and Value Added Services on a focused network ( ~14,000 Km) –Delhi - Mumbai progressively by Mid, 2002 –Hyderabad – Bangalore – Chennai by October 2002 –Delhi – Hyderabad by October 2002 –Hyderabad – Calcutta by December 2002 –Delhi – Calcutta by December 2002 –Network to be completed by December 2003 Telecom Network – Map (Audio Visual)

21 Technology State-of-the-art Technology adopted Transmission Equipment –Synchronous Digital Hierarchy (SDH) and Dense Wave Division Multiplexing (DWDM) Optical Ground Wire (OPGW) –Mostly Live line installation without disturbing the power system –Capable of carrying SDH & DWDM Network Management System (NMS) –Network to have a dedicated NMS for monitoring & maintenance of the telecom network from central location –Four remote independent Regional NMS Future Proof

22

23 POWERGRID Telecom SERVICES Virtual Private Networks (VPN) Internet Data Centre (IDC) –Web Hosting –Co-location services –Dedicated Server Products –Application Service Provision NLD Services End-to-End Bandwidth SERVICES International Connectivity

24 City 3 NEW MILLENNIUM INFOCOM NETWORK Town 4 KOLKATTATown 3Town 2 Town 1 City1 City 2 NATIONAL LONG DISTANCE NETWORK (POWERGRID) State Network Access Network Within City/Town using LT distribution Network HOMESEDUCATIONAL INSTITUTES HOSPITALS MARKETSBANKDEPARTMENTAL STORES PCOFACTORYGOVT. OFFICES MUMBAI DELHI EHV NETWORK DISTRIBUTION NETWORK LT DISTRIBUTION NETWORK

25 POWERGRID Strength is from Concept to Commissioning Trained Manpower > 70 Engineers for Planning, Design and Engineering > 150 Engineers in field Implementation Telecom, SCADA, DMS, EMS Consultancy for -BSES -NDMC -PONDICHERRY -DVB Acknowledging strength of POWERGRID M/S KEMA (Consultants of International Repute) Signed MOU for providing consultancy in International Market

26 SCADA/EMS/DMS Consultancy SCADA/EMS Consultancy Feasibility Studies System Design & Engineering Turnkey Execution Project Implementation Ready to extend Consultancy in other countries  MOU With KEMA

27 Telecom Business Consultancy Telecom Business Consultancy Feasibility Studies Financial Management Design of Network Project Implementation Regulatory and Market Assessment Turnkey Execution O & M Business Option Evaluation Ready to extend arm in other countries  Joint Ventures  Equity stakes

28 Thank You