Presentation is loading. Please wait.

Presentation is loading. Please wait.

North Idaho Adjudication— Background and Issues September 26, 2007 Dave Tuthill Idaho Department of Water Resources.

Similar presentations


Presentation on theme: "North Idaho Adjudication— Background and Issues September 26, 2007 Dave Tuthill Idaho Department of Water Resources."— Presentation transcript:

1 North Idaho Adjudication— Background and Issues September 26, 2007 Dave Tuthill Idaho Department of Water Resources

2 North Idaho Adjudication Background

3

4 Rathdrum Prairie Ground Water Management Advisory Committee Membership Two members from Idaho representing the petitioning organizations Dale Marcy, Representing Kootenai Environmental Alliance Allen Issacson, Representing Moratorium Petitioner Two members representing municipalities or municipal providers located within the RPGWMA; Jim Markley, Representing City of Coeur d’Alene Terry Werner, Representing City of Post Falls

5 Rathdrum Prairie Ground Water Management Advisory Committee Membership (cont.) Two members representing counties included within the RPGWMA (Kootenai County and Bonner County), Rand Wichman, Planning Director, Representing Kootenai Co.; Commissioner Brian Orr succeeded by Commissioner Joe Young, Representing Bonner Co. Three members representing irrigation/commercial/industrial uses within the area. Chris Beck; Paul Klatt; Chris Meyer succeeded by Pat Leffel Bob Haynes, Chairman, IDWR Northern Region Manager

6 Recommended and Adopted Management Plan Goal 2, Item B Goal 2, Item B The Department of Water Resources will work with the Rathdrum Prairie Ground Water Management Advisory Committee and local elected officials to determine the feasibility, cost and potential funding mechanisms to begin adjudication of water rights in the Coeur d'Alene Basin. The IDWR will include the preferred alternative in its Fiscal Year 2007 budget request along with any legislation necessary to undertake the adjudication.

7 JFAC Guidance for 2005 SECTION 4. It is legislative intent that the Department of Water Resources work with the Rathdrum Ground Water Management Plan Advisory Committee and local elected officials to determine the feasibility, cost and potential funding mechanisms to begin adjudication of water rights in the Coeur d'Alene Basin. The Department is requested to include the preferred alternative in its Fiscal Year 2007 budget request along with any legislation necessary to undertake the adjudication. SECTION 4. It is legislative intent that the Department of Water Resources work with the Rathdrum Ground Water Management Plan Advisory Committee and local elected officials to determine the feasibility, cost and potential funding mechanisms to begin adjudication of water rights in the Coeur d'Alene Basin. The Department is requested to include the preferred alternative in its Fiscal Year 2007 budget request along with any legislation necessary to undertake the adjudication.

8 42-1406B. NORTHERN IDAHO WATER RIGHTS ADJUDICATIONS -- COMMENCEMENT. (1) Effective management of the waters of northern Idaho requires that a comprehensive determination of the nature, extent and priority of the rights of all users of surface and ground water be determined. Therefore, the director of the department of water resources shall petition the district court to commence adjudications within the terms of the McCarran amendment, 43 U.S.C. section 666, of the water rights from surface water and ground water sources in northern Idaho through initiation of three (3) proceedings. (1) Effective management of the waters of northern Idaho requires that a comprehensive determination of the nature, extent and priority of the rights of all users of surface and ground water be determined. Therefore, the director of the department of water resources shall petition the district court to commence adjudications within the terms of the McCarran amendment, 43 U.S.C. section 666, of the water rights from surface water and ground water sources in northern Idaho through initiation of three (3) proceedings.

9 42-1406B. NORTHERN IDAHO WATER RIGHTS ADJUDICATIONS -- COMMENCEMENT. Separate petitions shall be filed for water rights adjudications for each of the following river basins, and related ground water sources whether or not hydraulically connected to a surface water source, within Idaho: the Coeur d'Alene-Spokane river basin, the Palouse river basin, and the Kootenai and Clark Fork-Pend Oreille river basins. The filing of each petition shall be contingent on legislative funding approval. Each petition shall describe the boundaries of the water source or water sources to be adjudicated. Separate petitions shall be filed for water rights adjudications for each of the following river basins, and related ground water sources whether or not hydraulically connected to a surface water source, within Idaho: the Coeur d'Alene-Spokane river basin, the Palouse river basin, and the Kootenai and Clark Fork-Pend Oreille river basins. The filing of each petition shall be contingent on legislative funding approval. Each petition shall describe the boundaries of the water source or water sources to be adjudicated.

10 Basins 91-95 Initial basin boundary – Note position of north boundary

11 Basin 87

12 Basins 96-98

13 Other Provision of Idaho Code § 42- 1406b SRBA Court has been identified as the selected court SRBA Court has been identified as the selected court Connectivity is enhanced by video teleconference (VTC) Connectivity is enhanced by video teleconference (VTC) District Court having jurisdiction for adjudication to be selected by the Idaho Supreme Court

14 Other Provisions of Idaho Code Fees were generally doubled, except the fee for a previously unrecorded domestic use will be $100 Fees were generally doubled, except the fee for a previously unrecorded domestic use will be $100 Final date for an accomplished transfer is established as January 1, 2006, for North Idaho Adjudications Final date for an accomplished transfer is established as January 1, 2006, for North Idaho Adjudications

15 Projected Fiscal Year Milestones FY2007 Prepare updated claims-taking software Prepare updated claims-taking software  Design of software is underway Develop on-line claims filing capability Develop on-line claims filing capability  Development is underway Obtain GIS images and layers Obtain GIS images and layers  Initial images have been obtained

16 SRBA: 22 Contracts $347,000 North Idaho: Kootenai ($108,286) Benewah ($55,197) Shoshone ($11,385) Clearwater (SRBA)

17 Projected Fiscal Year Milestones FY2008 Commence the Coeur d'Alene-Spokane river basin Adjudication Commence the Coeur d'Alene-Spokane river basin Adjudication Conduct public information meetings Conduct public information meetings Round one service to all potential claimants Round one service to all potential claimants Conduct filing of water rights claims Conduct filing of water rights claims FY2009 – FY2010 Conduct field examinations Conduct field examinations Prepare recommendations for decrees Prepare recommendations for decrees

18 Projected Fiscal Year Milestones FY2011 File Director’s Reports for decree recommendations File Director’s Reports for decree recommendations FY2012 Resolution of objections to recommendations Resolution of objections to recommendations

19 Projected Fiscal Year Milestones

20 Issues

21 1. Senate Bill No. 1205 IDWR Funding Bill for FY08 SECTION 5. It is legislative intent that work on the Northern Idaho Adjudication be limited in this fiscal year to the Rathdrum Prairie water rights and to Idaho-Washington cross-border water issues. SECTION 5. It is legislative intent that work on the Northern Idaho Adjudication be limited in this fiscal year to the Rathdrum Prairie water rights and to Idaho-Washington cross-border water issues.

22 2. Boundary Lines 1966 -- Original IDWR basin boundaries drawn using USGS topographic maps 1966 -- Original IDWR basin boundaries drawn using USGS topographic maps 2005 – Initial USGS publication on Spokane Valley – Rathdrum Prairie Aquifer 2005 – Initial USGS publication on Spokane Valley – Rathdrum Prairie Aquifer 2007 – Final publications on Spokane Valley – Rathdrum Prairie Aquifer (Approved for publication March 19, 2007) 2007 – Final publications on Spokane Valley – Rathdrum Prairie Aquifer (Approved for publication March 19, 2007) 2007 – IDWR basin boundaries officially revised and published August 16 2007 – IDWR basin boundaries officially revised and published August 16

23

24

25

26

27

28 3. Is IDWR Seeking a Post- SRBA Role? NIA funding is in addition to IDWR operations NIA funding is in addition to IDWR operations IDWR is understaffed for existing and future operations, not including NIA IDWR is understaffed for existing and future operations, not including NIA Funding from fees is 1/3 of projected NIA cost Funding from fees is 1/3 of projected NIA cost

29 4. Should Domestics be Required to File? In North Idaho, domestic uses constitute a larger share of total water use than in the SRBA In North Idaho, domestic uses constitute a larger share of total water use than in the SRBA The last two adjudications in North Idaho (Hayden Lake and Twin Lakes) were initiated by domestic conflicts The last two adjudications in North Idaho (Hayden Lake and Twin Lakes) were initiated by domestic conflicts This summer numerous domestic conflicts in North Idaho were reported to IDWR This summer numerous domestic conflicts in North Idaho were reported to IDWR

30 5. Will IDWR Require Meters on Domestics? IDWR has not done this anywhere in the State of Idaho IDWR has not done this anywhere in the State of Idaho The cost of reading the meters is high compared to the benefit The cost of reading the meters is high compared to the benefit Tens of thousands of small domestic water rights exist in the state Tens of thousands of small domestic water rights exist in the state

31 6. Will Annual Fees be Added to Domestics? Collection of fees from domestic users is inefficient Collection of fees from domestic users is inefficient The Legislature is moving toward use of the General Fund to provide water management funding where domestic water rights might have impact The Legislature is moving toward use of the General Fund to provide water management funding where domestic water rights might have impact

32 7. Is pumping in the Rathdrum Prairie really the problem? One primary driver for adjudication is the flow of the Spokane River One primary driver for adjudication is the flow of the Spokane River USGS/Washington/Idaho studies now reveal that the Rathdrum Prairie contributes only a portion of the flow of the Spokane River USGS/Washington/Idaho studies now reveal that the Rathdrum Prairie contributes only a portion of the flow of the Spokane River

33 Mean Annual Flow In Cubic Feet per Second Flow from Rathdrum Prairie ~500 cfs


Download ppt "North Idaho Adjudication— Background and Issues September 26, 2007 Dave Tuthill Idaho Department of Water Resources."

Similar presentations


Ads by Google