Presentation is loading. Please wait.

Presentation is loading. Please wait.

Future BPMN Releases 1.1 1.2. BPMN 1.1 – Goal Implement Bug Fixes and Clarifications to the 1.0 Specification Be able to present a draft (final) to the.

Similar presentations


Presentation on theme: "Future BPMN Releases 1.1 1.2. BPMN 1.1 – Goal Implement Bug Fixes and Clarifications to the 1.0 Specification Be able to present a draft (final) to the."— Presentation transcript:

1 Future BPMN Releases 1.1 1.2

2 BPMN 1.1 – Goal Implement Bug Fixes and Clarifications to the 1.0 Specification Be able to present a draft (final) to the OMG New Task Force at the September 16, 17 meeting

3 BPMN 1.1 Features Mapping to BPEL fix –Assign Statements Inclusive Gateway merging of Tokens (potentially) ebXML proposal additions

4 BPMN 1.1 Milestones Inclusive Gateway Resolution –Decide on July 7, 2005 BPEL Mapping Resolution –Discuss on July 7, 2005 –Decide on July 21, 2005 Finalize Work Assignments July 7, 2005 Decide on ebXML proposal by July 21, 2005 Draft of Spec on Aug. 1, 2005 –Primary Spec –Mapping BPEL Doc? –Model Doc? Review of Spec closes on Sept. 1, 2005 Present Draft at OMG Meeting (Sept 16, 17)

5 BPMN 1.2 Features Mapping to WS-BPEL 2.0 ebXML features (if not in 1.1) Additional features based on BPDM –To coincide with completion of BPDM


Download ppt "Future BPMN Releases 1.1 1.2. BPMN 1.1 – Goal Implement Bug Fixes and Clarifications to the 1.0 Specification Be able to present a draft (final) to the."

Similar presentations


Ads by Google