1 Igal Kaptsan Research Director Applied Research, Bentley Systems Change Management

2 |2|2 Topics What is change management? Infrastructure Project Challenges Tie Design Phase to Project Lifecycle Change Management building blocks

3 |3|3 Change Management is about detecting changes and initiating appropriate responses to them. What is change management?

4 |4|4 Project teams include many participants from multiple companies from any part of the world with varying project delivery methods and contractual relationships Each project has a unique and transient supply chain that comes together quickly, exists for a few years and the dissolves at the conclusion of the project. Impossible to implement a single “system ” for the all the functions of the entire supply chain. Identifying, communicating and measuring the impact of change, which is at the heart of all projects, is problematic. Reusing designs and design projects from past projects is difficult. Infrastructure Project Challenges

5 |5|5 Changes are inevitable in infrastructure projects and are likely to occur from different sources, by various causes, at any stage of a project - and may have considerable impacts There are diffident types of changes : –Elective or required –Discretionary or non-discretionary –Preferential or regulatory This makes it imperative to have in place an effective change management regime in place However, it is impossible to effectively manage change if there is no reliable model that captures the dependency between the key project elements Infrastructure Project Challenges

6 |6|6 Detailed design Project Scope Requirements Capture and Management Verification and Validation Design/Construction Variations Construction Work Packages Plan Concept Design / Implementation Design / Implementation Construction Verification & Validation Verification & Validation Operation & Maintenance Operation & Maintenance Requirements Design is not a discrete activity. To achieve a full dependency model all phases need to be linked to each other and be aware of any changes done in any one of them at any point of time. Tie Design Phase to Project Lifecycle

7 |7|7 Change Management building blocks Content definition & extraction Content definition & extraction Identify & coordinate changes Identify & coordinate changes Rules driven Notifications Rules driven Notifications Actions & Workflow Actions & Workflow Dependency viewing & authoring Dependency viewing & authoring Establish and track the dependencies between project elements Analyze Impacts Forecast possible changes Propagating changes Resolving conflicts Notify interested parties Initiate a business workflow Trigger a batch operation Manage project tasks Implementing business processes

8 |8|8 ProjectWise Document Management Documents Content extraction & definition Content definition & extraction Content definition & extraction Identify & coordinate changes Identify & coordinate changes Rules driven Notifications Rules driven Notifications Actions & Workflow Actions & Workflow Dependency viewing & authoring Dependency viewing & authoring

9 |9|9 ProjectWise Document Management Documents Behavior links Testing Analysis Trade-off study

10 | 10 MS Word CAD Model MS PowerPoint MS Excel CAD Model MS Project Document Management ProjectWise Dependency Service Content extraction & definition 10 | WWW.BENTLEY.COM

11 | 11 Dependencies viewing & authoring Existing dependencies –Reference files –Link Sets –Sets of Documents Dependency authoring Content definition & extraction Content definition & extraction Identify & coordinate changes Identify & coordinate changes Rules driven Notifications Rules driven Notifications Actions & Workflow Actions & Workflow Dependency viewing & authoring Dependency viewing & authoring

12 | 12 Root Link Set Application driven Filter Office Docs References Existing Dependencies Viewing

13 | 13 Architecture …Electrical…Electrical + Architecture Existing Dependencies Viewing

14 | 14 Impact analysis Affected by Affecting Existing Dependencies Viewing

15 | 15 Dependencies between what? Existing dependencies –Reference files –Link Sets –Sets of Documents Dependency authoring –Objects –Documents –Content

16 | 16 Capture, Apply and Assess risk - Activity Management

17 | 17

18 | 18 Labor and equipment costs are estimated at beginning of the project. These estimated costs need to be validated against the actual project tracking document for labor and equipment costs. Daily Cost Monitoring

19 | 19

20 | 20 Identify & monitor changes Content definition & extraction Content definition & extraction Identify & coordinate changes Identify & coordinate changes Rules driven Notifications Rules driven Notifications Actions & Workflow Actions & Workflow Dependency viewing & authoring Dependency viewing & authoring

21 | 21 MS Word CAD Model MS PowerPoint MS Excel CAD Model MS Project Document Management ProjectWise Dependency Service Identify & monitor changes Content definition & extraction Content definition & extraction Identify & coordinate changes Identify & coordinate changes Rules driven Notifications Rules driven Notifications Actions & Workflow Actions & Workflow Dependency viewing & authoring Dependency viewing & authoring

22 | 22 MS Word CAD Model MS PowerPoint MS Excel CAD Model MS Project Document Management ProjectWise Dependency Service Identify & monitor changes

23 | 23 MS Word CAD Model MS PowerPoint MS Excel CAD Model MS Project Document Management ProjectWise Dependency Service Identify & monitor changes

24 | 24 Use Cases Don’t approve a change without an Impact Analysis report… Shorten the approvals cycle, Document and Component dependencies Compliance assurance Requirements management Capture, Apply and Assess risk Activity Management Take control of your IP and reuse it Templates Monitor engineering process Dash Board Records and evidence of your business process Audit Trail

25 | 25 Changes are examined against a list of Rules, and if they pass… –Notify interested parties –Initiate a business workflow –Trigger a batch operation –Any combination of the above Rules driven Notifications Content definition & extraction Content definition & extraction Identify & coordinate changes Identify & coordinate changes Rules driven Notifications Rules driven Notifications Actions & Workflow Actions & Workflow Dependency viewing & authoring Dependency viewing & authoring

26 | 26

27 | 27 Sequential Workflow –Typically Flow Chart based, progresses from one stage to next and does not step back) State Machine Workflow –Progress from 'State' to 'State', these workflows are more complex and return to a previous point if required Rules-driven Workflow –Implemented based on Sequential workflow. The rules dictate the progress of the workflow Windows Workflow Foundation Content definition & extraction Content definition & extraction Identify & coordinate changes Identify & coordinate changes Rules driven Notifications Rules driven Notifications Actions & Workflow Actions & Workflow Dependency viewing & authoring Dependency viewing & authoring

28 | 28 What is available today? Content definition & extraction Content definition & extraction Identify & coordinate changes Identify & coordinate changes Rules driven Notifications Rules driven Notifications Actions & Workflow Actions & Workflow Dependency viewing & authoring Dependency viewing & authoring Get it now!

29 | 29 2010 Roll-out User Workshops –5 – 10 users, regional - 1/2 day –On-site - information model creation – 3 day Pilot projects Live Zone

30 | 30 Thank you igal.kaptsan@bentley.com