Chapter 4 Quality Assurance in Context SE 471 - Software Testing and Quality Assurance 1.

Similar presentations


Presentation on theme: "Chapter 4 Quality Assurance in Context SE 471 - Software Testing and Quality Assurance 1."— Presentation transcript:

1 Chapter 4 Quality Assurance in Context SE Software Testing and Quality Assurance 1

2 Overview Handling Discovered Defect During QA Activities QA Activities in Software Processes Verification and Validation Perspectives Reconciling the Two Views 2

3 Introduction Quality assurance (QA) interpretation from last chapter —QA as dealing with defects —implicitly assumed that all discovered defects will be resolved within the software development process before product release In this chapter we —Describe defect handling during the execution of specific QA activities —Examine how different QA activities fit into different software development processes —Examine the QA activities from the perspective of verification and validation (V&V) view 3

4 Defect Handling and Related Activities QA aims to resolve each discovered defect before product release Most important activity associated with defect handling is defect resolution —Ensures that each discovered defect is corrected or taken care of through appropriate actions e.g. reclassification, deferment for future fix Two important activities to support defect resolution: —Defect logging: recording discovered defects —Defect tracking: monitoring defects up its final resolution 4

5 Defect Handling and Related Activities What to record? —Various specific information can be recorded and updated through the defect handling process. Defect type, severity, impact areas, possible cause etc —Details in later chapter To ensure proper collection and usage of defect data, we need to pay special attention to the following in the defect discovery and resolution activities —distinguish execution failures, internal faults and human errors —the specific problems need to be counted and tracked consistently —timely defect reporting 5

6 Defect Handling Process Defect handling handled in similar ways as configuration management A formalized defect handling process defines —Important activities and associated rules, —Parties involved, and their responsibilities –Multiple parties. Who could be? —Different states associated with individual defect status –Operating system example? –New, Working, Re-verify, Closed 6

7 Defect Handling Tools We need the support of software for —implementation of the defect handling process —enforcement of various related rules Commonly referred to as defect tracking tools or defect handling tools Examples: —IBM: CMVC - configuration management and version control, an IBM Products was used for defect tracking —Open source projects: Tools such as –Bugzilla (http://www.bugzilla.org) –Issuezilla (http://www.issuezilla.org) 7

8 Defect Handling Process Bugzilla Bug Life Cycle 8

9 Defect Handling in Different QA Activities Three classes of the QA activities: —defect detection and removal activities, such as testing and inspection, –are more closely associated with defect handling –inspector of a program may make an initial note about a possible problem in the program code. When it is confirmed during the inspection meeting, it is formally recorded as a defect —various defect prevention activities –do not directly deal with defects –rather deal with various ways to prevent the injection –consequently, there are little or no discovered faults —defect containment activities, –the focus is not on the discovery of underlying faults –consequently, there are little or no discovered faults 9

10 QA Activities in Software Processes QA activities - integral part of the overall software process Maintenance stage, the focus of QA is on how: —Each problem reported from field operations is –logged –analyzed –resolved —Complete tracking record is kept so that we can learn from past problems for future quality improvement Most of the core QA activities (defect prevention & reduction) are performed during software development instead of during in-field maintenance —So we focus on how different QA activities fit into software processes First, we examine how QA activities fits in the Waterfall Process 10

11 QA in the Waterfall Process Strictly sequential stages Typical sequence includes, in chronological order: —product planning, —requirement analysis, —specification, —design, —coding, —testing, —release, and —post-release product support Testing, a central part of QA activities, —is an integral part of the waterfall process, —forms an important link in the overall development chain 11

12 QA in the Waterfall Process Other QA activities —not explicitly stated in the process description —can be carried out throughout other phases and in the transition from one phase to another —For example, part of the criteria to move on from each phase to the next is quality, typically in the form of checking to see if certain quality plans or standards have been completed or followed –Through reviews and inspection Various defect prevention activities are typically concentrated in the earlier phases – why? 12

13 QA in the Waterfall Process Some detection and removal techniques like inspection can also be applied to early stages —e.g. inspecting requirement documents, product specs, product design etc. —But there are practical obstacles to the early fixing of injected defects –Dynamic problems may only become apparent during execution –e.g. component dependency issues cannot be detected & fixed till after implementation & execution Defect containment (fault tolerance, safety assurance) in late phases —However, its planning/preparation is done at early stages 13

14 QA in the Waterfall Process 14

15 QA in Other Software Processes Incremental and iterative processes —consisting of several increments/iterations —each of them following more or less the same mini-stages corresponding to those in the waterfall process —The new increment has to be incorporated with the existing parts - Integration testing Spiral process —Are similar to those performed in incremental/iterative processes —Minor difference is typically in the risk focus adopted in spiral process Agile development method —can be treated as special cases of incremental, iterative, or spiral process models where many of their elements are used or adapted —Inspection & testing play an even more important role e.g. test driven development & inspection is integral part of extreme programming 15

16 QA Activities in V&V Context V & V → Validation and Verification Validation activities —Related QA activities check whether a function needed and expected by the customers is present in a software product Verification activities —Related QA activities to confirm the correct or reliable performance of these specified functions —Check the conformance of a software system to its specifications 16

17 QA Activities in V&V Context Examples of QA activities that can be classified as Validation activities: —System testing focus is the overall set of system functions —Acceptance & beta testing with focus on the user —Usage based testing where the target environment is simulated during software testing before product release —Software fault tolerance for providing continued service even when local problem exists —Software safety assurance activities which focus on providing the expected accident free operations or reducing accident damage when an accident is unavoidable 17

18 QA Activities in V&V Context When a expected feature is present —the activity to determine whether it performs or behaves expectedly is then a verification activity —therefore there are almost always accompanying verification activities Therefore, all the QA activities we classified as dealing directly with faults, errors, or error sources can be classified as verification activities —E.g. proper working of algorithms, data structures, coding standards, process standards 18

19 V & V Based QA Activities in Software Processes Validation checks whether the expected functions or features are present or not —validation deals directly with users and their requirements Verification checks implementation against its specifications to see if it is implemented correctly —Verification deals with internal product specifications Different processes involve users in different ways —Therefore validation and verification activities may be distributed in different processes differently 19

20 V & V Based QA Activities in Waterfall Process Focus of validation activities —Direct involvement of users and their requirements at the very beginning & the very end –e.g. project planning, market analysis, requirement analysis, specification, beta testing, usage-based testing, acceptance testing, product release, post-release support and maintenance etc —Therefore, these are the phases where validation activities may be the focus Focus of verification activities —No direct involvement of users in the middle part –e.g. inspection of design, formal verification of program correctness, unit testing, component testing etc —Therefore, these are the phases where verification activities may be the focus 20

21 The V Process Model These verification and validation activities can be best illustrated by the V-model 21

22 V&V vs. DC View DC View - defect-centered view Verification and validation activities included examples of specific QA activities QA activities were also classified according to the generic ways of dealing with defects —Prevent —Reduce —Contain Through this connection we can establish the relationship and the mapping between the V&V view and DC view 22

23 V&V vs. DC View 23 Defect prevention deals with error blocking verification and validation deal with failures and faults Therefore, there is no direct connection, but only indirectly e.g. if the target is eliminating ambiguity in the requirement, it is indirectly validation