Presentation is loading. Please wait.

Presentation is loading. Please wait.

Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #26 University of California.

Similar presentations


Presentation on theme: "Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #26 University of California."— Presentation transcript:

1 Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #26 University of California at Riverside

2 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 2 MICE Cooling Channel Layout Spectrometer Solenoid #1 (ready for reassembly) Spectrometer Solenoid #2 (testing in progress)

3 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 3 Topics Technical review Magnet 2 modifications Magnet 2 cool down and training Coil connection failure Magnet leads testing Magnet 1 update Upcoming task schedule

4 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 4 Magnet Status Summary Modifications to Magnet 2 including adding of a single stage cryocooler were completed at the end of Feb. ‘10 Several delays in reassembly were caused by vacuum leaks in lead test apparatus, vendor extended illness, redesign of the warm leads, and leaks in the magnet vacuum vessel Six coil training runs were completed last week An open-circuit was found in the internal connection of one of the leads for the M2 coil late last week Magnet will remain cold through next week in order to complete additional power supply and thermal tests Minimal disassembly will be required to assess M2 issue

5 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 5 MICE Internal Technical Review Spectrometer Solenoid technical review was held on November 18-19, 2009 at LBNL Review committee: Pasquale Fabbricatore (chair), Amalia Ballarino, Elwyn Baynham, Tom Bradshaw, Mike Courthold, and Chris White; Alain Blondel and Andy Nichols (ex officio) The committee came up with several recommendations including the following: - Approved the adding of a single stage cooler to Magnet 2 - Recommended additional thermal modeling of the system - Advised installing additional magnet instrumentation - Suggested Magnet 2 test results be used to determine the final modifications to Magnet 1

6 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 6 Magnet 2 Modification Summary A modification to Magnet 2 has been carried out which adds a single stage cryocooler to provide additional cooling to the HTS leads and didn’t require full magnet disassembly The single-stage Cryomech AL330 cooler provides 170 W at 55 K and required modifications only in the “turret” area The added cooling power lowered the HTS lead temperature sufficiently to prevent lead burnout Based on results of the lead tests, the design of the warm leads was modified to reduce the I 2 R heat load to the 1 st stage of the cryocoolers Additional instrumentation has also been incorporated

7 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 7 Original Magnet 2 Configuration HTS leads Cold head 1 st stage Radiation shield Fill & vent lines Cold mass

8 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 8 Magnet 2 with Added Cryocooler Single-stage cooler Thermal link HTS leads

9 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 9 Modification Details Added turret space Access port

10 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 10 Magnet 2 Single Stage Cooler Single stage cooler and flexible copper thermal link installed in Magnet 2

11 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 11 Installed Leads in Magnet 2

12 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 12 Vacuum Feedthrough for Magnet Leads Area of vacuum leak

13 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 13 Vacuum Guard for Leaking Feedthrough Lead vacuum guard

14 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 14 Vacuum Pumping of the Magnet Reassembled turret (single stage cooler on right) Mechanical pump with cold trap and increased diameter connection

15 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 15 The magnet was successfully cooled down after the vacuum leak in the lead feedthrough was corrected The single stage cooler resulted in 30-35K lower temperatures at the upper end of the HTS leads The shield temperatures reached levels that are 20-25K lower than the previous cooldown Overall, the addition of the single stage cooler has had the desired effect With all 5 coils connected in series, the following current levels were reached during training: 165 A, 219 A, 238 A, 253 A and 257 A (165 A result likely a power supply issue) Magnet 2 Training and Testing Results

16 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 16 After the last training run, it was found that one of the connections to the M2 coil was open circuit Based on the voltage taps, the failure occurred between the HTS lead lower end and the internal connection to the coil With the magnet cold, testing has continued on other fronts An additional training run on coils E1, C and E2 (in series) reached a current of 270 A With E1, C and E2 at 150 A, the currents in E1 and E2 were successfully trimmed by ±50A using the 60 A supplies The PS ramp down circuits were successfully tested Assessment of the LHe boil off rate will be made on Monday Magnet 2 Training and Testing Results

17 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 17 Failed connection to M2 to be assessed within 1 to 2 weeks by grinding off an access window on the magnet turret If the failure is accessible, repairs will be made and the magnet reassembled for cooldown and training completion If the repair requires removal of the cold mass (more likely), then efforts will move to complete Magnet 1 first Subsequent reassembly of Magnet 2 would include all of the modifications incorporated on Magnet 1 Final assessment of Magnet 2 thermal performance not yet complete – should have more information next week (addition of a 4 th 2-stage cooler may be required) Magnet 2 Repair Scenarios

18 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 18 Magnet Quench during Training

19 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 19 Magnet Thermal Modeling FEA model of thermal shield, 1 st stage plate and HTS leads Proposed Magnet 1 modifications are also being modeled

20 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 20 Magnet Thermal Modeling Parametric studies are being conducted to calculate the temperature profile in the 1 st stage copper plate Modeling is being used to help determine the optimum configuration of coolers for Magnet 1 1 st stage Cu plate model

21 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 21 Magnet Leads Testing A series of off line lead tests were conducted in order to characterize the warm leads and verify the performance of the HTS leads at up to 275 A The temperature drops across the cooler drop-in joint, the intercepts for the room temperature leads and the copper between the leads and the cooler were measured The voltage drops along the leads were also measured The resistive heating in the warm leads was found to be higher than originally predicted; a modified design has been incorporated into Magnet 2

22 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 22 Cryocooler Setup for Lead Test 1st Stage heater and Tapered Plate 2nd Stage heater and Condenser PT-415 Drop in Cooler

23 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 23 Magnet Lead Test HTS lead 1 st stage plate Thermal connection

24 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 24 Cooler Performance with Two IL/A Leads 24 Not in Equilibrium

25 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 25 Observations from the Cooler Tests The I 2 R heating for the original copper leads used in Magnet 2 was found to be too high (IL/A=5.3x10 6 A/m) The leads were redesigned with an IL/A of 3.0x10 6 A/m The new design reduces the I 2 R heating from 27 watts/lead to 11 watts/lead (at 275 A) The ΔT in the cooler drop-in joint was 1 to 2 K, and the ΔT from the leads to the 1 st stage copper plate was ~1 K The 1 st stage copper plate used in the leads test was likely too thin; the copper plate in the spectrometer solenoid is sufficiently thick with the addition of the single stage cooler

26 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 26 Magnet 1 Modification Summary implement ideas to improve thermal connection between coolers and shield and lower cold mass support intercept temperature use copper sheets rather than Al cylinders and straps use 1100Al strips outside of shield to improve heat conduction make preparations for using a 4 th 2-stage cooler augment the single-stage cooler to solve both thermal problems decision to add 5 th cooler depends on outcome of Magnet 2 tests modify cold mass fill pipe to facilitate clearing a blockage should one occur

27 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 27 Magnet 1 Cold Mass Added port for possible 4 th 2-stage cooler

28 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 28 Magnet 1 Shield Corresponding hole for 4 th 2- stage cooler added to shield shield is also being “beefed up” locally to improve heat transfer to edges – this is where cold-mass support intermediate temperature point is connected – extra heat load from higher temperature at this point is burden for stage 2 of coolers probably more of an issue than bulk radiation load Attachment point for LN 2 reservoir New connection for cooler added Area where cold- mass support intercept attached

29 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 29 Heat Shield Thermal Connections Previous attempt to improve thermal connection between stage 1 of coolers and shield was a failure – aluminum bands were even worse than original copper strips – next iteration will make connections between 1 st stage copper plates and shield with thick copper sheets

30 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 30 2-Stage Cooler Modification Top view: A fourth 2-stage cooler could be added as shown below – still leaves room for the single-stage cooler Side view: Single stage cooler 4 th 2-stage cooler

31 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 31 Schedule Overview (Path 1)

32 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 32 Schedule Overview (Path 2)

33 Steve Virostek -- Lawrence Berkeley National Laboratory -- March 26, 2010 MICE Spectrometer Solenoid Fabrication and Testing Update Page 33 Lead tests resulted in a new warm lead design Fixes to Magnet 2 were implemented, and magnet training continued The added single-stage cooler solved the HTS lead problem and lowered the shield temperature A failure occurred in the connection to the M2 coil Assessment of the problem should be completed in the next 2 weeks If the problem is serious, efforts will move to the completion of Magnet 1 Summary


Download ppt "Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #26 University of California."

Similar presentations


Ads by Google