Download presentation
Presentation is loading. Please wait.
1
Constraining the N 2 O budget using isotopologues and isotopomers Y. L. Yung, S. P. Kim, M. C. Liang and R. L. Shia Divisions of Geological and Planetary Sciecnes California Institute of Technology B41G-02 AGU - Dec 13, 2007 (Thur) B41G-02 (AGU 2007) Yung et al., Constraining the N2O budget using isotopologues and isotopomers
2
Method 14 N 14 N 16 O (446) 14 N 15 N 16 O (456) 15 N 14 N 16 O (546) 14 N 14 N 18 O (448) B41G-02 (AGU 2007) Yung et al., Constraining the N2O budget using isotopologues and isotopomers
3
Known Sources B41G-02 (AGU 2007) Yung et al., Constraining the N2O budget using isotopologues and isotopomers
4
Goal: Calculate the gradient of a cost function with respect to initial control variables. The Adjoint Method Steps: 1. Linearize the model 2. Transpose the linear model B41G-02 (AGU 2007) Yung et al., Constraining the N2O budget using isotopologues and isotopomers
5
Tangent linear and Adjoint Model Compiler (TAMC) Examples MIT ocean model Hamburg Ocean Primitive Equation Model (HOPE) Tracer Model (TM2) Created for Fortran 77 with some extensions for 90/95 Automatic generation of adjoint code Takes top-level routine and creates adjoint routines Follows all guidelines in Giering (1998) B41G-02 (AGU 2007) Yung et al., Constraining the N2O budget using isotopologues and isotopomers
6
B41G-02 (AGU 2007) Yung et al., Constraining the N2O budget using isotopologues and isotopomers
7
B41G-02 (AGU 2007) Yung et al., Constraining the N2O budget using isotopologues and isotopomers
8
B41G-02 (AGU 2007) Yung et al., Constraining the N2O budget using isotopologues and isotopomers
9
B41G-02 (AGU 2007) Yung et al., Constraining the N2O budget using isotopologues and isotopomers
10
B41G-02 (AGU 2007) Yung et al., Constraining the N2O budget using isotopologues and isotopomers
11
B41G-02 (AGU 2007) Yung et al., Constraining the N2O budget using isotopologues and isotopomers
12
B41G-02 (AGU 2007) Yung et al., Constraining the N2O budget using isotopologues and isotopomers
13
What is the uncertainty of this budget projection? B41G-02 (AGU 2007) Yung et al., Constraining the N2O budget using isotopologues and isotopomers
14
Conclusions The IPCC 2007 N 2 O budget appears to be consistent with the isotopic data Isotopic analysis narrows uncertainty range of the model budget Extend the model to the pre-industrial revolution Site preference data for 15 N provides the most sensitive discrimination between natural and anthropogenic sources of N 2 O. B41G-02 (AGU 2007) Yung et al., Constraining the N2O budget using isotopologues and isotopomers
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.