1 Review of the NCEP production Suite: Recent Changes and Plans
Marine Modeling and Analysis Branch Waves Group EMC/NCEP Arun Chawla Waves Team Lead Marine Modeling and Analysis Branch NOAA / NWS / NCEP / EMC WHERE AMERICA’S CLIMATE WEATHER AND OCEAN SERVICES BEGIN

2 NCEP Production Review 2014
Wind waves Operational models running at NCEP Multi-1 global model. Multi-2 global hurricane model. 2 Great lakes NAM / NDFD Ensemble Wave model In Development Nearshore Wave Prediction System 12/3/2014 NCEP Production Review 2014

3 Global Wave model (Multi-1)
All grids upgraded to ETOPO1 bathymetry Mask files updated to enhance coverage in regional 10 arc minute grids No physics changes but some differences in results close to coast due to changes in bathymetry 12/3/2014 NCEP Production Review 2014

4 NCEP Production Review 2014
Multi_1 (contd.) Extended domains (black lines) in the regional grids 12/3/2014 NCEP Production Review 2014

5 Upgrades to Multi-1 (next year)
Physics package Upgrade : More wave energy in previous regions of negative bias Extend grid domain to the North Pole by replacing regular Arctic grid with a curvilinear Arctic grid 12/3/2014 NCEP Production Review 2014

6 Hurricane Wave model (Multi_2)
Hurricane wave model upgraded to new physics package (already in global, great lakes and ensemble wave models) Includes new packages for wave growth dissipation (due to wave breaking) and swell dissipation Hurricane winds now provided by the HWRF models 12/3/2014 NCEP Production Review 2014

7 NCEP Production Review 2014
Multi_2 (contd.) Impact Better representation of wave height at peak storm Faster response to Hurricanes (for both growth and dissipation) Better spectral representation, and consequently better representation of storm wave arrival times A 10% error in peak period ~ 35 min error for a 15 s wave travelling 500 km 12/3/2014 NCEP Production Review 2014

8 NCEP Production Review 2014
Multi_2 (contd.) Retrospective Forecasts (Hurricane Sandy) Black – New model Cyan – Ops 12/3/2014 NCEP Production Review 2014

9 Frequency Spectra at buoy 41048
Multi_2 (contd.) More accurate representation of peak frequency leading to better estimates of storm arrival times S/Sp f/fp Sp, fp – Maximum spectral peak and location of spectral peak from data Frequency Spectra at buoy 41048 12/3/2014 NCEP Production Review 2014

10 NCEP Production Review 2014
Global Ensembles Upgraded physics package New physics package now same in all wave modeling systems Increased spatial grid resolution from 1o x 1o to 0.5ox0.5o Changes to Initialization / cycling More in line with the GEFS (for future coupling) Has an impact on spread and accuracy Conserves swell perturbations Provides 80 members over a 24 Hr cycle 12/3/2014 NCEP Production Review 2014

11 NCEP Production Review 2014
Ensembles (contd.) Validation over a 2.5 month period 12/3/2014 NCEP Production Review 2014

12 NCEP Production Review 2014
Ensembles (contd.) Retrospective runs during Hurricane Sandy Tp (s) 12/3/2014 NCEP Production Review 2014

13 NCEP Production Review 2014
Great Lakes Models Updated the grids Higher resolution curvilinear grid More accurate coastline Higher resolution 2.5 Km NAM smartinit winds New ice concentrations 12/3/2014 NCEP Production Review 2014

14 NCEP Production Review 2014
New Grid Great Lakes (contd.) Resolution ~ 4 km Resolution ~ 2.5 km Effect of higher resolution grid Strong westerlies Oct 3rd 2014 12/3/2014 NCEP Production Review 2014

15 Higher Resolution winds
Great Lakes (contd.) Higher resolution winds Current operations: 12km NAM Upgrade: 2.5km from NAM 4km 12/3/2014 NCEP Production Review 2014

16 NCEP Production Review 2014
Ice Concentrations Great Lakes (contd.) Intake of new ice concetrations NAM ice mask (from NIC) is extremely conservative Large areas where there should be waves are masked out Solution: NIC ice concentrations Bob Grumbine’s conditional climatology (whenever NIC fails…) 12/3/2014 NCEP Production Review 2014

17 Nearshore Wave Prediction System (Under Development)
Motivation Current WW3 global grid mosaic Desired nearshore application Max. coastal resolution = 4 arc min (7.5 km) Required nearshore resolution < 500 m 12/3/2014 NCEP Production Review 2014

18 Nearshore Wave Prediction System at coastal forecast offices
12/3/2014 NCEP Production Review 2014

19 NWPS Architecture 2 approaches
Local (Original development) Run locally (at WFOs), routinely/on-demand, using SWAN or nearshore WWIII Driven by forecaster-developed winds from GFE (AWIPS II), and external sources (e.g. WWIII, RTOFS/ESTOFS). Requires computational resources at local WFOs Remote (New development) Run on NCEP resources WFOs retain control on forcings / local features Limited on demand capability 12/3/2014 NCEP Production Review 2014

20 NWPS (contd.) FTP/LDM ADCIRC WWIII SWAN NWPS CAVE (D2D, GFE)
WWIII Boundary Conditions Water levels/ Currents RTOFS/ESTOFS/PSurge Ext. winds, GFS/ECMWF/TCM Other Input FTP/LDM NWPS ADCIRC WWIII SWAN CAVE (D2D, GFE) FC Guidance Products FC Winds GRIB2 EDEX (Data Server) Additional wave output (NetCDF, HDF5, GRIB2) NDFD (total field; partitions) CAVE: Common AWIPS Visualization Environment EDEX: Environmental Data Exchange LDM: Local Data Manager 12/3/2014 NCEP Production Review 2014

21 On-demand implementation on WCOSS New Architecture
Am. Samoa Guam NCEP/WCOSS Puerto Rico 12/3/2014 NCEP Production Review 2014

22 NWPS (contd.) (Staged on WCOSS) LDM via HQ SBN NWPS on WCOSS AWIPS2
WW3 Boundary Conditions; RTOFS Surface Currents; ESTOFS/P-Surge Water levels ADCIRC WWIII SWAN (Staged on WCOSS) FC guidance products GFE winds; control files AWIPS2 CAVE (D2D, GFE) SBN LDM via HQ GRIB2 EDEX (Data Server) CAVE: Common AWIPS Visualization Environment EDEX: Environmental Data Exchange LDM: Local Data Manager NDFD (total field; partitions) 12/3/2014 NCEP Production Review 2014

23 NWPS on-demand central computing
WCOSS 6 nodes reserved (96 compute cores) Satellite network (ouput) data NCWCP Regional HQ GRID file DOMAIN file CONTROL file Hurricane wave BCs data data data data TAFB/OPC WFO WFO WFO 12/3/2014 NCEP Production Review 2014

24 WCOSS implementation schedule
NWPS (contd.) WCOSS implementation schedule Jul 14 Aug Sep Oct Nov Dec Jan 15 Feb Mar 15 Apr May Jun Finalize initial WCOSS development Developer testing on WCOSS, incl. data upload, run triggering Initial EE setup (NCO Support) Code delivered to NCO TIN issued; CCB approves parallel data feed; 30-day parallel testing at NCO IT testing at NCO Management Briefing & implementation AWIPS2 build v14.4.1 12/3/2014 NCEP Production Review 2014