Highways 5/16/99 Intersection Realignment. Project Team Lindsey Thomann- Project Manager Jessica Young- Project Engineer Erik Dolmseth- Project Engineer/Client.

Similar presentations


Presentation on theme: "Highways 5/16/99 Intersection Realignment. Project Team Lindsey Thomann- Project Manager Jessica Young- Project Engineer Erik Dolmseth- Project Engineer/Client."— Presentation transcript:

1 Highways 5/16/99 Intersection Realignment

2 Project Team Lindsey Thomann- Project Manager Jessica Young- Project Engineer Erik Dolmseth- Project Engineer/Client Liaison Julie Roebel- Project Engineer

3 Overview Project Description Design Requirements Project Approach Design Solution Conclusion

4 Project Description Client David Burrus, Naval Support Activity, Crane Division Located in Crane, Indiana

5 Project Description Legend: Highway 5 Highway 99 Highway 16 Railroad Building 36 Building 34 Proposed Parking Lot N

6 Design Requirements CLIENT REQUESTS Realign intersection to meet AASHTO requirements Propose ideas for a parking lot Create a storm water drainage plan Locate utilities and indicate whether they must be moved

7 Design Requirements CONSTRAINTS Railroads and buildings remain in place Parking lot must be 25 meters away from buildings Meet or exceed INDOT and AASHTO

8 Project Approach Codes & Regulations Preliminary Feasibility Study Utility Investigation Traffic Study Photographic Study Topographical Investigation Realignment Design Options Assessment of Options

9 Codes and Regulations AASHTO INDOT FHWA MUTCD IDEM EPA

10 Preliminary Feasibility Study Zoning Investigation Site Characteristics and Soil Study Streams, Floodplains, and Wetlands Study Recommendation to Proceed

11 Utility Investigation Water Main Gas Main Overhead Power Lines Legend: Relocation Electric Poles -$26,000 Telephone/Optic -$18,500 Gas -$10,000 Remain in Place Water Sanitary Sewer

12 Traffic Study Traffic Count from 5:55 a.m. – 6:10 a.m. N

13 Photographic Study

14 Topographical Investigation N

15 Option 3: Relocate Both Highways 16 and 99 Design Options Option 1: Relocate Highway 16 Eastward Legend : Project Area Highway 5 Highway 99 Highway 16 Option 2: Relocate Highway 99 Westward Option 4: Create a Roundabout Option 5: Relocate Highway 16 East of Overhead Power Lines N

16 Assessment of Options Decision Matrix Criteria Safety Cost Clearance time Driver comfort Recommendations Based on results of matrix

17 Assessment of Design Options Explanation of Safety Analysis Ratings Point Value Safety 1High Accident Severity 2Moderate Accident Severity 3Low Accident Severity Point Value Initial Cost 1>$90,000 2$80,000-$90,000 3<$80,000 Explanation of Initial Cost Analysis Ratings Explanation of Clearance Time Analysis Ratings Point Value Clearance Time 1> 30 seconds 210-30 seconds 3< 10 seconds Explanation of Driver Comfort Analysis Ratings Point Value Driver Comfort 1Angled Approach 2Orthogonal Approach 3Merge with Traffic

18 Assessment of Design Options Realignment Design Options Safety (35%) Initial Cost (30%) Clearance Time (20%) Driver Comfort (15%) Weighted Average Rank Relocate Highway 16 Eastward 23212.23 Relocate Highway 99 Westward 22211.94 Relocate Both Highways 16 and 99 21221.75 Create a Round- About 32332.7 1 Relocate Highway 16 East of Overhead Power Lines 2 3 2 2 2 2.3

19 Final Design Option 5: Relocate Highway 16 East of Overhead Power Lines Legend : Project Area Highway 5 Highway 99 Highway 16 N

20 Pavement Design Estimated 219,000 trucks over 10 year period 2% increase per year The Asphalt Institute Thickness Design ESAL = 519, 700 Mr = 9300 psi

21 Pavement Design 5 i n. 6 i n.

22 HMA Design 12 foot Driving Lanes Sloped Shoulder 3 in. thick HMA Surface 4.5 in. thick Intermediate Course 8 in. thick Aggregate Base Existing Soils Legend:

23 Parking Lot HW 16 63 Parking Spaces 5 Handicapped Spaces

24 Parking Lot 56 Parking Spaces 7 Parking Spaces 5 Handicapped Spaces

25 Parking Lot 56 Parking Spaces 7 Parking Spaces 5 Handicapped Spaces

26 Traffic Control Plan Legend: Phase 1: Newly Aligned HW16 Access to Battery Storage Facility Access to Buildings and Northern HW 16 N

27 Traffic Control Plan Legend: Phase 2: North Access Road Access to Battery Storage Facility Access to Buildings and Northern HW 16 N Road Block

28 Traffic Control Plan Legend: Phase 3: South Access Road Access to Battery Storage Facility Access to Buildings and Northern HW 16 N Road Block

29 Stormwater Runoff Plan Performed Full Hydraulic Analysis Existing Drainage Swales Adequate Redesigned Drainage Culverts Under Hwy 16 Upgraded from 18” to 30” and 15” to 18 ”

30 Cost Estimate Item DescriptionCost Mobilization/Demolition$36,000 Excavation/Pavement$204,000 Signage/Markings$2,600 Drainage/Runoff Control$10,000 Overhead and Profit$25,000

31 Plans New Corridor Corridor Stationing Profile View Cross-Sections

32 Roundabout Design Highway 16 Highway 5 Highway 99 N

33 Summary Client Requests Design Options Final Design Option 5: Relocate Highway 16 East of Overhead Power Lines Legend : Project Area Highway 5 Highway 99 Highway 16 Original locations of roadways are shown in white New Access Roads N

34 Questions? N


Download ppt "Highways 5/16/99 Intersection Realignment. Project Team Lindsey Thomann- Project Manager Jessica Young- Project Engineer Erik Dolmseth- Project Engineer/Client."