Presentation is loading. Please wait.

Presentation is loading. Please wait.

Final Presentation Minerva Engineering. Introduction  John Kats- Project Manager  Ryan Schipper- Project Editor  Matt Lash- Project Engineer/Client.

Similar presentations


Presentation on theme: "Final Presentation Minerva Engineering. Introduction  John Kats- Project Manager  Ryan Schipper- Project Editor  Matt Lash- Project Engineer/Client."— Presentation transcript:

1 Final Presentation Minerva Engineering

2 Introduction  John Kats- Project Manager  Ryan Schipper- Project Editor  Matt Lash- Project Engineer/Client Contact  Peter Flynn- Project Engineer  Stephen Rowe- Project Engineer PARAGON Josh Reed- Client Contact

3 Overview  Overview  Preliminary Investigation  Layout Options  Final Work  Summary

4 Preliminary Feasibility Study  Site Visit  Zoning  Market investigation  Environmental Site assessment

5 Codes and Regulations  Greenfield, Indiana Code of Ordinances  Hancock County, Indiana Code of Ordinances  Hancock County, Indiana Stormwater Technical Standards Manual  INDOT & AASHTO  International Building Code  American Standard of Testing Methods (ASTM)

6 Geotechnical Investigation Field Work and Testing  Located Utilities  Determined sampling points  Bag Samples  Tube Samples  Wildcat Dynamic Cone Penetration Tests

7 Geotechnical Investigation Soil Sampling Locations

8 LEED Analysis  Researched requirements  Evaluated point criteria  Determined feasibility

9 Decision Matrix Criteria used for rating layout design options:  Estimated Cost  Expected Income  Amenities A systematic approach for determining lot layout

10 Decision Matrix Explanation of Estimated Cost:

11 Decision Matrix Explanation of Estimated Income:

12 Decision Matrix Explanation of Amenities:

13 Decision Matrix Assessment of Layout Options:

14  10 Estate Lots  41 Custom Home Lots  31 Zero Maintenance Lots Site Layout Option 3

15 Roadway and Pavement  Subdivision Control Ordinances  34 feet wide from gutter to gutter  4 foot sidewalks on either side

16 Rain Garden  Bioretention area  Designed to not be a wetland  List of acceptable plant life in Central Indiana  Incorporated into Stormwater System

17 Erosion & Sediment Control Phase I Plan

18 Erosion & Sediment Control Phase II Plan

19 Erosion & Sediment Control Drop Inlet Protection Outlet Protection Curb Inlet Protection

20 Stormwater Management Design of pipesDesign of pipes Retention PondsRetention Ponds Rain GardenRain Garden LIDLID

21 Wastewater Management  Tie-in to Greenfield Wastewater Management  Placement of Pipes

22 Grading Plan Before After

23 Detail of Phase I  Substantial Cut  Cut can be used for the burm

24 Construction Cost Estimate  Estimation for roads, sidewalks, curb and gutter, excavation, utility hook-ups, erosion and sediment control and landscaping  Unit pricing was found using the RS Means Manual

25 Cost Summary