F08 – 72 – OUTGRESP First Contingency Outage Response for SIUC Client: SIU Physical Plant Engineering Services Team Members: Terry Campanella, PM, EE/CpE.

Similar presentations


Presentation on theme: "F08 – 72 – OUTGRESP First Contingency Outage Response for SIUC Client: SIU Physical Plant Engineering Services Team Members: Terry Campanella, PM, EE/CpE."— Presentation transcript:

1 F08 – 72 – OUTGRESP First Contingency Outage Response for SIUC Client: SIU Physical Plant Engineering Services Team Members: Terry Campanella, PM, EE/CpE Tanner Jones, EE Clint Frederick, EE Rudy Probst, EE Damon Adams, EE Kyle Moore, EE Faculty Advisor: Dr. Constantine Hatziadoniu Client Contact: Steve Lazorchak, PE

2 Outline of Topics Executive SummaryTerry Project DescriptionTerry Outage Preparation PlanTanner Protective DevicesClint Mechanical ConsiderationsTerry Mobile TransformersRudy Universal TransformerDamon First Contingency Outage PlanKyle Literature Review SummaryClint Plan for CompletionTanner Resources NeededKyle SummaryRudy

3 Executive Summary Why is there a need for a Contingency Outage Plan? ◦ Outages Like Summer 2008 ◦ Extended Outages during Critical Times ◦ Enhance Reliability of SIUC Electrical System Deliverables: Mechanical and Protective Reports, Feasibility of a Replacement Transformer, Outage Preparation Plan, Outage Contingency Plan Dollars Needed: $0

4 Project Description Mechanical Considerations Protective DevicesOutage Preparation Plan Mobile Transformer Universal Transformer Contingency Transformer Outage Plan

5 Outage Preparation Plan Study of critical loads Plans for affected buildings ◦ Basic guidelines for handling an outage ◦ Standardized operating procedures for extended outages

6 Protective Devices Study feeder one-line diagram Simulate existing protective schemes Evaluate adequacy of protective schemes If necessary, design new scheme for replacement transformer

7 Mechanical Considerations Find best route to access transformer Analyze surrounding structures for possible complications during a replacement Study clearances

8 Mobile Transformer Trailer mounted transformer for easy transportation to load site Connections Storage Safety/Security Protection

9 Universal Transformer One-size fits most Determine best transformer replacement ◦ Three-phase unit ◦ Three single-phase cans Will fit in location of physically smallest present transformer Similar constraints to Mobile Transformer

10 First Contingency Outage Plan Analyze present testing procedures Analyze current plan for responding to an outage Consider proposed transformer replacement design Recommend new or modified procedures and plan as necessary

11 Literature Review Summary Outage Awareness and Preparation Plans Transformer Configuration and Construction Transformer Protection Transformer Testing Emergency Mobile Transformers Transformer Replacement Procedures

12 Plans for Completion AIL ◦ Visit Transformer Locations ◦ Review Transformer Database and Feeder Diagram ◦ Formulate Plans of Approaching Subsystems ◦ Design Subsystem Timeline

13

14 Resources Needed ItemDescriptionQuantity$ Each$Subtotal 1 MATLAB 2On hand0.00 2 Power World Simulator 2On hand0.00 3 Easy Power 2 Borrowed * 0.00 TRANSFORMER AND PROTECTION SUBSYSTEMS $0.00 4 Microsoft Office 6On hand0.00 OUTAGE PREPARATION PLAN AND FIRST CONTINGENCY OUTAGE PLAN SUBSYSTEMS $0.00 5 Cardboard boxes 10On hand0.00 6 Digital Camera 1On hand0.00 MECHANICAL CONSIDERATIONS SUBSYSTEM $0.00 Total New Dollars Needed $0.00

15 Summary Project Description Resources - $0 Deliverables

16 Questions?


Download ppt "F08 – 72 – OUTGRESP First Contingency Outage Response for SIUC Client: SIU Physical Plant Engineering Services Team Members: Terry Campanella, PM, EE/CpE."