Presentation is loading. Please wait.

Presentation is loading. Please wait.

GRANT JOINT UNION HIGH SCHOOL DISTRICT Planning for the future preserving the past M A S T E R P L A N Conceptual Site Illustrative S O F T B A L L & P.

Similar presentations


Presentation on theme: "GRANT JOINT UNION HIGH SCHOOL DISTRICT Planning for the future preserving the past M A S T E R P L A N Conceptual Site Illustrative S O F T B A L L & P."— Presentation transcript:

1 GRANT JOINT UNION HIGH SCHOOL DISTRICT Planning for the future preserving the past M A S T E R P L A N Conceptual Site Illustrative S O F T B A L L & P R A C T I C E F I E L D EXISITNG TRACK & FIELDS FUTURE SERVICE YARD HARD COURTS TENNIS COURTS (PARKING BELOW) M O R E N O PROPOSED MORENO & ADULT SCHOOLS & DISTRICT OFFICE BASEBALL CAGES NEW BLEACHERS ONE WAY LOOP O L Y M P I C SERVICE YARD A L B M (PARKING BELOW) FE R M N Q A ACADEMIC (E) B ACADEMIC (E) E ATHLETIC (E) F SWIM GYM (E) L STC (E) M STUDENT UNION O /PARKING N HOME ENTRY / CONCESSIONS P VISITOR ENTRY Q TENNIS O /PARKING R OPERATIONS & MAINTENANCE P S P A L D I N G L A S K Y 3 2 4 1 5 6 7 8 1MAIN ENTRANCE 2STUDENT UNION ENTRY PLAZA 3RESTORED GRADUATION LAWN 4BUS DROP OFF/VISITOR PARKING 5SPORT PROMENADE 6HEATH AVENUE IMPROVEMENT 7RE-IMAGED BRIDGE & LOBBY 8SERVICE & ACCESSIBILITY RAMP

2 GRANT JOINT UNION HIGH SCHOOL DISTRICT Planning for the future preserving the past M A S T E R P L A N Conceptual Site – Pre Construction PRACTICE FIELD EXISITNG TRACK & FIELDS FUTURE SERVICE YARD HARD COURTS TENNIS COURTS (PARKING BELOW) M O R E N O BASEBALL CAGES NEW BLEACHERS ONE WAY LOOP O L Y M P I C SERVICE YARD A L B M (PARKING BELOW) FE R M N P S P A L D I N G L A S K Y G R A D U A T I O N L A W N INTERIM HOUSING 18 RELOS PROPOSED MORENO & ADULT SCHOOLS & DISTRICT OFFICE 1.DISTRICT OFFICE RENOVATION FOR MORENO HIGH SCHOOL

3 GRANT JOINT UNION HIGH SCHOOL DISTRICT Planning for the future preserving the past M A S T E R P L A N Conceptual Site – Phase I PRACTICE FIELD EXISITNG TRACK & FIELDS FUTURE SERVICE YARD HARD COURTS TENNIS COURTS (PARKING BELOW) M O R E N O PROPOSED MORENO & ADULT SCHOOLS & DISTRICT OFFICE BASEBALL CAGES NEW BLEACHERS ONE WAY LOOP O L Y M P I C SERVICE YARD A L B M (PARKING BELOW) FE R M N PHASE I P S P A L D I N G L A S K Y DURATION SUMMER 2009 COMPLETION SUMMER 2011 M STUDENT UNION O/ PARKING N HOME ENTRY / CONCESSIONS G R A D U A T I O N L A W N INTERIM HOUSING 18 RELOS PHASE I 1.ADD INTERIM HOUSING (18 RELOS) & RELOCATE M & O AND CLASSROOMS FROM BLDG H AND PORTION OF BLDG B 2.DEMO BLDG H, PORTION OF BUILDING B, RAMP, TENNIS COURTS AND PARKING LOT AT BLDG F 3.CONSTRUCT BLDG M STUDENT UNION WITH SUBTERRANEAN PARKING, BLDG N, BUS DROP- OFF AND PRACTICE FIELD 4.CONSTRUCT NEW STAIR AT SOUTH END OF BUILDING B 5.RESTORE GRADUATION LAWN 6.MAINTENANCE TO TEMPORARILY RELOCATE 7.TENNIS TO TEMPORARILY OCCUR OFFSITE


Download ppt "GRANT JOINT UNION HIGH SCHOOL DISTRICT Planning for the future preserving the past M A S T E R P L A N Conceptual Site Illustrative S O F T B A L L & P."

Similar presentations


Ads by Google