Presentation is loading. Please wait.

Presentation is loading. Please wait.

Dr. Martin T. Auer MTU Department of Civil & Environmental Engineering Mass Balance, Kinetics & Reactors.

Similar presentations


Presentation on theme: "Dr. Martin T. Auer MTU Department of Civil & Environmental Engineering Mass Balance, Kinetics & Reactors."— Presentation transcript:

1 Dr. Martin T. Auer MTU Department of Civil & Environmental Engineering Mass Balance, Kinetics & Reactors

2 Environmental Response …the question is not will a system will respond, but rather when and to what extent. (Cooke et al. 1999) and, as engineers, we might add ‘ at what cost ’ ?

3 Lake and River Management …the environmental engineering equivalent of building a bridge to nowhere. (Thomann and Mueller 1987, p. ix) http://www.zen39641.zen.co.uk/ps/

4 Drinking Water Treatment …the environmental engineering equivalent of building a bridge that falls down. (Thomann and Mueller 1987, p. ix) http://www.jansenkiener.com/Bridge%20Engineering.htm

5 Plug Flow Reactor Completely-Mixed Flow Reactor Reactor Analogs

6 CMF Reactor

7 Control Volume

8 Zero Order Kinetics Oxygen in Dollar Bay Zero Order k = 0.13 mg∙L -1 ∙d -1 C t = -k∙t + C 0

9 First Order Kinetics Radioisotope Decay k = 0.036 yr -1 t 0.5 = 19.25 yr lnC t = -k∙t + lnC 0

10 Temperature and Kinetics Theta Function

11 Temperature and Kinetics WWTP Nitrification Effluent Ammonia Load (MT∙d -1 ) J F M A M J J A S O N D

12 CMF Reactor with first order decay time-variable or steady state application

13 For many years, Allied Chemical and its ancestors produced soda ash … a chemical used to soften water and in the manufacture of glass, soap, and paper. The raw materials were two locally abundant minerals: CaCONaClNaCOCaCl 3232  and the products were soda ash (Na2CO3) and calcium chloride (CaCl2) waste. The wastes were deposited in 2000 acres of lagoons along the banks of 9 Mile Creek. The waste continually leaks from the lagoons into the creek, making the water highly ‘salty’. Chloride in 9 Mile Creek

14

15 Response Time assume no input, divide by V, collect terms and integrate, assume SS when 95% completed, i.e.

16 Response Time Wastewater Treatment Grit removal, 0.5 hr 1°, 2° settling, 1-2 hr Activated sludge, 4-8 hr Anaerobic digestion, 15-30 d Drinking Water Treatment Rapid mix, <1 min Flocculator, 30 min Disinfection, 15 min Natural Systems Onondaga Lake (0.25 yr) Lake Ontario (8 yr) Lake Michigan (136 yr) Lake Superior (179 yr) Typical ‘fast’ k, 30 yr -1 Typical ‘slow’ k, 0.03 yr -1

17 CCe tss kt    F H G I K J  1 1  CCeCe t kt kt  F H G I K J   F H G I K J   F H G I K J  1 1 2 1 1   CCe t kt  F H G I K J  F H G I K J  2 1 1  Time-Variable Response

18 SS CMF Application to Lakes where W = Q∙Cin, i.e. the loading

19 SS CMF Application to Lakes

20 Batch Reactor in Pipe

21

22

23

24

25

26

27

28

29

30

31

32 Train of Batch Reactors

33 PF-CMF Comparison: Reactor Efficiency

34 PF-CMF Comparison: Sensitivity to Spikes

35 PF Reactor – Application to Rivers

36 Example 4.14 PCBs in Lake Superior Dr. Perlinger’s research group sampling on Lake Superior aboard the U.S. EPA research vessel Lake Guardian.


Download ppt "Dr. Martin T. Auer MTU Department of Civil & Environmental Engineering Mass Balance, Kinetics & Reactors."

Similar presentations


Ads by Google