Presentation is loading. Please wait.

Presentation is loading. Please wait.

Group 7 Equipment Replacement By: David Berdahl (Organizer) Joshua Warwick (Techie) Tony Nong (Summarizer)

Similar presentations


Presentation on theme: "Group 7 Equipment Replacement By: David Berdahl (Organizer) Joshua Warwick (Techie) Tony Nong (Summarizer)"— Presentation transcript:

1 Group 7 Equipment Replacement By: David Berdahl (Organizer) Joshua Warwick (Techie) Tony Nong (Summarizer)

2 The Project  Public Transportation Bus Replacement

3 Two Scenarios  Scenario 1 Do we replace the bus at this time or do we keep using the one we have. Do we replace the bus at this time or do we keep using the one we have.  Scenario 2 The bus needs to be replaced and do we get a 7 or a 10 year service life bus. The bus needs to be replaced and do we get a 7 or a 10 year service life bus.

4 Information Gathering  Internet  Public Transit Agencies (RTA, City of Corona, Foothill Transit)  Private Transportation Companies  Bus Manufacturers


Download ppt "Group 7 Equipment Replacement By: David Berdahl (Organizer) Joshua Warwick (Techie) Tony Nong (Summarizer)"

Similar presentations


Ads by Google