Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs.

Similar presentations


Presentation on theme: "Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs."— Presentation transcript:

1 Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs and will be in charge of the readout into the PVSS system. For non-standard crates (eg. different power supplies etc.), we will be free to use spare analog channels of the rack monitoring ELMBs to read out our own power supplies or whatever we like to. We will require a Windows PC for the OPC server. Also a subdetector control station will be required. Both could be the same physical PC running Windows, if we are happy to locate our SCS where the CAN cable ends. It is not entirely excluded to use Helfrieds rack-control PCs if we have a sufficiently small- scale low-rate system. While the CERN OPC server is tailored to the needs of the ELMB, it is in fact able to handle any CANopen message. This has already been shown to work with some industry standard CANopen compliant sensors. Current hardware options for TCM: ELMB plus 2nd CAN chip CAN SAE81C91 (5-wire Interface) ELMB plus Fujitsu, emulating ADC data (I2C) ?

2 Uli Schäfer DCS meeting Feb. 18th The JCOP Framework Manuel Gonzales Demonstration of ELMB / Framework Fernando Varela DCS for ID Integration Fernando Varela Muon Testbeam H8 Joe Rothberg Integration Tests for DCS Tools Jim Cook DDC for 2003 Testbeam Slava Khomoutnikov Update OPC server Slava Filimonov ELMB SW Plans Helfried (H. Boterenbrood) A.O.B.

3 Uli Schäfer JCOP Framework Framework quite advanced by now (V1.2.1) : Shield users from details of PVSS and HW access Provide common look & feel Reduce software effort for standard users Device support: power supplies, generic A/D, ELMB, … Tools: device editor, hierarchy, storage, histogramming Current developments: mass configuration, config database access, integration w. ROOT,… ELMB / framework demonstration w. 2 ELMBs : –configuration (automatic generation of OPC config. data) –operation (set and read values) Libraries, examples, tutorials available: http://cern.ch/itcobe/Projects/Framework

4 Uli Schäfer DCS test setups 2003… Inner detector setup for subdetector commissioning and tests: plans for large system comprising control for SCT, TRT, pixel, services (to be completed by summer 2003) H8 test beam 2003 (muons) : proper DCS hierarchy (distributed PVSS system) need a conditions conditions database for offline use (structure? contents? data rates?) Systems expected to suit testbeam requirements (PVSS v2.12) Further tests required for migration towards final Atlas components (PVSS 3.0 alpha) More work required on conditions and configuration databases DAQ-DCS Communication: v.3.3.2 (configuration from database) New version of OPC server available: new ELMB supported, conversion to physical values supported

5 Uli Schäfer ELMB news ELMB firmware supports New ELMB128 ADC calibration (from flash memory) Conditional data transmission (upper/lower threshold) Firmware framework available soon for those requiring non-standard functionality CANopen package System functions (EEPROM access, bootloader etc.)

6 Uli Schäfer Finally… „Working week“ April 2-4 : Technical issues (distributed PVSS), tutorials (framework),CAN, OPC… Draft of HLT/DAQ/DCS TDR at http://atlas-proj-hltdaqdcs- tdr.web.cern.ch/atlas-proj-hltdaqdcs-tdr/ Spares policy on ELMB : 10% for modules outside the detector Final ELMB production starting April 1. Need to order ELMBs by March 28th ! We need to decide whether to use ELMBs and how many. ADCs required at all? We would wish to have no more than 1 ELMB per crate, which normally supplies 64 analog data only. (  firmware / framework)  We need to start talking to f/w and s/w people for possibility to increase ‘virtual‘ analog channel count.