Presentation is loading. Please wait.

Presentation is loading. Please wait.

Upstream PID Review at CM16 A.Bross VC September 13, 2006.

Similar presentations


Presentation on theme: "Upstream PID Review at CM16 A.Bross VC September 13, 2006."— Presentation transcript:

1 Upstream PID Review at CM16 A.Bross VC September 13, 2006

2 PID Review  We will review the upstream PID systems (TOF 0/1 and CKOV) at CM16  Dates – October 12 and 13  The agenda will be posted on the CM WEB site and an upload area for support documents for each of the systems will be available u With Marco’s help  Support documentation should be uploaded by September 29 th  Format for each of the sub-systems u Overall description of systems u Cost and Schedule u Risk Analysis s See TB page for template s See Tracker Module page for an example how one group has done it u Discussion  Plus simulation work, magnetic shielding and installation  Review Committee u Bross (Chair), Edgecock, Murray, Soler, Virostek, Drumm (ex-officio)

3 Agenda

4 Planning for Downstream PID  There are still a number of uncertainties regarding the downstream system u Transverse Size u Cal implementation (lead-fiber vs. fully active) u Funding  However, we would still like to plan for a review of this system towards the end of November or early December  The likely venue is INFN, Frascati  More to come


Download ppt "Upstream PID Review at CM16 A.Bross VC September 13, 2006."

Similar presentations


Ads by Google