Today’s (12.7) Report LIU Qian. East EC is ready, we are going to install the EC TOF next Monday.

Similar presentations


Presentation on theme: "Today’s (12.7) Report LIU Qian. East EC is ready, we are going to install the EC TOF next Monday."— Presentation transcript:

1 Today’s (12.7) Report LIU Qian

2 East EC is ready, we are going to install the EC TOF next Monday.

3 Move the main bundles The breakout is protected The common end is protected By TOF Tricycle

4 The upper distribution box The main bundle New position, Direction: west to east (safer, and easier to connect with fibers) Old position, Direction: North to south The extra length of fibers are over-under coiled.

5 Close look of fiber management

6 The fibers’ heads They are all hidden in the shelter.

7 The rack Moon box UH Module Height: 1.20 m The ruler starts from 1.50 m Height: 1.60 m

8 Common end The common end of east. We didn’t remove the protective tube yet.

9 Conclusion We only finished the 12 bundles installation. (since the people who helped me install the fibers are employed temporarily, for now only one IHEP employee and I are installing the bundles. But that’s OK, since we don’t want to push it in a hurry.) The bottom box has been installed. We’ll try to finish the rest bundles in this weekend. Next Monday we’ll begin to install the EC TOF of east side.