Presentation is loading. Please wait.

Presentation is loading. Please wait.

Gas Station Ruby System By Amange Muhajir Sponsor: Abdul Tammo.

Similar presentations


Presentation on theme: "Gas Station Ruby System By Amange Muhajir Sponsor: Abdul Tammo."— Presentation transcript:

1 Gas Station Ruby System By Amange Muhajir Sponsor: Abdul Tammo

2 Objective  To inventory all product of the ware house  To data base how much gas sold a day  Counting each shift that be working  To do gas report  And also counting Det and CR card

3 Software Component  Html  C#  Date base  Access

4 Component Diagram Main System Log in Generate all system Old files get check Gas Report Checking the inventory

5 Titles of Proposal Pages Cover Sheet (1 Page) Abstract/Executive Summary (1Page) Background/Introduction/Statement of Need (cont.) (Research w. References) (Research w. References) Project Description (2-3 Pages) Resources Difficulties Difficulties Sponsor Project Description Anticipated Outcomes Evaluation of Results Plan of Demonstration Plan of Demonstration Schedule (cont.) Flow Diagram of Component Dependencies Flow Diagram of Component Dependencies Scheduling of Component Execution and Resources Conclusion (1 Page)

6 Presentation #1 10/23/06

7 Gas Station Ruby System Amange Muhajir Sponsor: Abdul Tammo

8 Progress Software used.  Java  Date base  Access

9 Presentation # 3 11/13/06

10 Gas Station Ruby System Amange Muhajir Sponsor: Abdul Tammo

11 OBJECTIVES Objectives: To allow control all inventory and also Electronic Data invoice for each day for gas, lottery, sales room etc..

12 SOFTWARE COMPONENTS  Login screen  Form Data page  Design the front page of it

13 Login Screen

14 Project Sketch

15 Project Sketch (Cont’)

16 Next

17 Next

18 Project Schedule  11/6/2006Project progress complete  11/13/2006Detailed outline project complete  11/14/2006-11/23/2006Organizing the user manual or get the idea how do it  11/24/2006-11/27/2006Having user manual complete. Manual will show the user how to use the program.  11/28/2006-12/4/2006Begin to test the program.  12/5/2006- 12/8/2006Packing the program  12/9/2006-12/18/2006Program complete. Project complete

19 Difficulties  Need more time…  Learning Java..

20 Work Remaining  Code that will Process the form pages  Collection all the Reports of sale room and other.

21 Commentary no comments……. Thank You