Manager’s “diamond” for Project Variables

Similar presentations


Presentation on theme: "Manager’s “diamond” for Project Variables"— Presentation transcript:

1 Manager’s “diamond” for Project Variables
Target: 100% cost Target : $70K scope schedule Target : 30 wks Target : 4 defects/Kloc quality Adapted from Software Engineering: An Object-Oriented Perspective by Eric J. Braude (Wiley 2001), with permission.

2 The Variables of Project Management
Can somewhat vary the following factors. 1. The total cost of the project, e.g., increase expenditures 2. The scope of the product, e.g., subtract from a list of features 3. The quality of the product, e.g., increase the mean time between failure 4. The date on which the job is completed. e.g., reduce the schedule by 20% e.g., postpone project's completion date one month The Variables of Project Management Adapted from Software Engineering: An Object-Oriented Perspective by Eric J. Braude (Wiley 2001), with permission.

3 Manager’s “diamond” for Project Variables
Target: 100% cost Target : $70K Actual: 100% Actual: $90K this project scope schedule Target : 30 wks Target : 4 defects/Kloc Actual: 20 wks Actual: 1 defect/Kloc quality Adapted from Software Engineering: An Object-Oriented Perspective by Eric J. Braude (Wiley 2001), with permission.

4 Optimal Size for Interaction (Approximate)
Effectiveness per developer Developer communicates regularly with no one. No communication time lost, but developer is too isolated and has no help. 3 Number of people with whom developer must frequently interact Key: = engineer Adapted from Software Engineering: An Object-Oriented Perspective by Eric J. Braude (Wiley 2001), with permission.

5 Optimal Size for Interaction (Approximate)
Effectiveness per developer Approximate optimal range Developer communicates regularly with eleven people. Communication time outweighs benefits of interaction Developer communicates regularly with no one. No communication time lost, but developer is too isolated and has no help. 3 7 Number of people with whom developer must frequently interact Key: = engineer Adapted from Software Engineering: An Object-Oriented Perspective by Eric J. Braude (Wiley 2001), with permission.