Presentation is loading. Please wait.

Presentation is loading. Please wait.

Molly, Gwyn, Sam, and Eric.  Tested and analyzed enough of our system to make sure that it will work  Finished thermal testing of one of our converters.

Similar presentations


Presentation on theme: "Molly, Gwyn, Sam, and Eric.  Tested and analyzed enough of our system to make sure that it will work  Finished thermal testing of one of our converters."— Presentation transcript:

1 Molly, Gwyn, Sam, and Eric

2  Tested and analyzed enough of our system to make sure that it will work  Finished thermal testing of one of our converters in a vacuum  Ordered $600 worth of parts from Digikey and $20 from CablesonDemand  Finalized schematic and worked on PCB as fast as possible

3  Choose a boardhouse from which to buy our PCB- compare prices for our 6”x12” board  Finish and order PCB! Ship fast.  Work on coding tasks: - Gwyn: testing DAC with PIC code, then testing adjustable voltage control from GUI - Sam: finish up all vendor requests and corresponding PIC code - Molly: GUI- saving HK to a file, implement adjustable voltage settings at a user-controlled rate - Eric: PIC code taking in HK data from MUXs

4


Download ppt "Molly, Gwyn, Sam, and Eric.  Tested and analyzed enough of our system to make sure that it will work  Finished thermal testing of one of our converters."

Similar presentations


Ads by Google