Presentation is loading. Please wait.

Presentation is loading. Please wait.

Dipl.-Ing. Klaus Scherer Fraunhofer inHaus-Center & IMS-IRG

Similar presentations


Presentation on theme: "Dipl.-Ing. Klaus Scherer Fraunhofer inHaus-Center & IMS-IRG"— Presentation transcript:

1 Dipl.-Ing. Klaus Scherer Fraunhofer inHaus-Center & IMS-IRG
Fraunhofer-inHaus-Center Intelligent Room- and Building-Systems Aims, Organisation, Facilities and Examples of Innovations Dipl.-Ing. Klaus Scherer Fraunhofer inHaus-Center & IMS-IRG

2 Fraunhofer inHaus-Center - Introduction MISSION STATEMENT
R&D for the process optimization in residential and commercial properties by new systems solutions based on an integrated, sustainably created cooperation network of commercial and research partners with the use of jointly planned and constructed innovation workshops (inHaus 1+2) for the development, test, demonstration and market test of novel, integrable product components, integrated systems solutions and services Task 1.1 Task 1.5 Duisburg, 2-September-2009 Master Presentation

3 Fraunhofer inHaus-Center - Introduction INHAUS FACILITIES
Area: 8000 sqm inHaus1-Labs: 250 sqm inHaus2-Labs: 5200 sqm SmartBuilding-Labs Task 1.1 inHaus1 inHaus2 Task 1.5 SmartHome-Lab Duisburg, 2-September-2009 Master Presentation

4 Fraunhofer inHaus-Center - Introduction ORGANISATION & MANAGEMENT
inHaus- Fraunhofer- Institute Consortia IBP-IMS inHaus-Center research labs 1 + 2 inHaus-Center Management General Management Innovation Management Operating of inHaus Facilities Fraunhofer-IMS FhG-IMS FhG-IBP Living (IMS) Construction (IBP) Operation&FM (ISE) Office (IAO) Health & Care (ISST/IMS) Hotel & Event (IAO/IMS) FhG-IAO FhG-ISST Network of business partners Medium-sized and big Businesses Task 1.1 Network of research partners e.g. Universities FhG-ISE FhG-IPA FhG-IML FhG-IDMT Task 1.5 inHaus Innovation Projects FhG-UMSICHT Duisburg, 2-September-2009 Master Presentation

5 Fraunhofer inHaus-Center - Introduction SYSTEMS INNOVATION PROCESS
Know-how, technologies and component kit of the FhG´and the business partners Ideas for new system solutions 1 2 3 Demonstration and marketing of new systems solutions 6 Establishing system of components and development of system prototypes Task 1.1 4 Technology tests in the inHaus technology laboratories 5 Task 1.5 Demostration and application tests in the inHaus application laboratories Duisburg, 2-September-2009 Master Presentation

6 Fraunhofer inHaus-Center - Introduction SYSTEMS INTEGRATION PROCESS
Optimized functions and processes (with UI-process-cockpit) Intelligent, integrated room- and building systems System-integration process and technologies (system engineering) Task 1.1 smart components with system integration capability (material, electronics, software) Task 1.5 Duisburg, 2-September-2009 Master Presentation

7 Fraunhofer inHaus-Center - Introduction INHAUS SYSTEMS LAYER MODEL
Systems-Applications, Processes Basic Services Middleware (OSGi, .NET, JAVA) Communication (EIB, LON, Ethernet/IP, BT, wLAN, GSM, UMTS) Operating System (Linux, Windows) Constraints Task 1.1 Hardware Platform Sensor-, Actuator-, Controller- Components Task 1.5 Duisburg, 2-September-2009 Master Presentation

8 Middleware-Server (embedded) Integration & Applications
Fraunhofer inHaus-Center - Introduction INHAUS SMART HOME SYSTEMS ARCHITECTURE User Tele-Interfaces to SmartHomes&Buildings and to Service Providers Internet Intranet Satellit P C S i c h e r t T m o s a l f n w ß W G ä H z u g y L A d / V k b - N D Services Platform Diverse Access Technologies Computer aided Facility Management DSL, BK, UMTS Middleware-Server (embedded) Integration & Applications M e ß g e r ä t e B e d i e n e i n h e i t e n Task 1.1 K u p f e r K o a x i a l G l a s f a s e r Tele Assistance Service Functions Task 1.5 Local Assistance Service Functions Duisburg, 2-September-2009 Master Presentation

9 Decentralized pumping system
Fraunhofer inHaus-Center - Introduction INNOV. EXAMPLE DECANTALISED PUMP SYSTEM Current practice No hydraulically balanced condition Decentralized pumping system Automatic hydraulically balanced condition Networked mini-pumps with central.-control-module too cold Task 1.1 WILO / FhG-IMS too warm Task 1.5 Duisburg, 2-September-2009 Master Presentation

10 Fraunhofer inHaus-Center - Introduction INNOV
Fraunhofer inHaus-Center - Introduction INNOV. EXAMPLE FUTURE HOTEL ROOM SYSTEM Task 1.1 Task 1.5 Duisburg, 2-September-2009 Master Presentation

11 That`s it, thank you for your attention !
Workshop Design and Operation of Smart, Energy Efficient Buildings


Download ppt "Dipl.-Ing. Klaus Scherer Fraunhofer inHaus-Center & IMS-IRG"

Similar presentations


Ads by Google