Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 OVERVIEW Validate the Measurement Measure Conductor Temperature Time Line Budget Conclusion.

Similar presentations


Presentation on theme: "1 OVERVIEW Validate the Measurement Measure Conductor Temperature Time Line Budget Conclusion."— Presentation transcript:

1 1 OVERVIEW Validate the Measurement Measure Conductor Temperature Time Line Budget Conclusion

2 2 MAGNETIC FIELD SENSOR Three Axis Magnetic Field Sensor  MAGNETOMETER RS232 W/CASE High Accuracy, <0.5% Full Scale 10 to 154 Sample/Sec Low Power consumption Input voltage range 6 to 15 (VDC) [?]

3 3 MAGNETIC FIELD MEASURMENT

4 4 MEASURING TEMPRATURE

5 5

6 6 TIME LINE

7 7 BUDGET

8 8 CONCLUSION  Measure Sag  Build a Model  Desirable: Measure Conductor Temp Due to budget, use Temp Sensor and IR Camera  Validate Measurement Measuring Tension Magnetic Sensor

9 9 CONTACT INFORMATION Rocky Mountain Power 2011-2012 Clinic Team rmpclinic-2011-2012@lists.utah.edu REFERENCES [1] [2] [3] [4] [5] [6] [?] Digi-Key. “Smart Digital Magnetometer HMR2300.” Internet: http://www51.honeywell.com/aero/common/documents/myaerospacecatalog- documents/Missiles-Munitions/HMR2300.pdf, Sep 2006 [Sep. 30, 2011]http://www51.honeywell.com/aero/common/documents/myaerospacecatalog- documents/Missiles-Munitions/HMR2300.pdf


Download ppt "1 OVERVIEW Validate the Measurement Measure Conductor Temperature Time Line Budget Conclusion."

Similar presentations


Ads by Google