1 EDGE™ Concept Level Project Plan P08110 – UAV Based Digital Imaging System David Eells (Mechanical Engineering)

2 EDGE™ Concept Level Project Plan Project Name –UAV Based Digital Imaging System Project Number –P08110 Project Family –Multi-Platform Payloads - Family of Projects Track –Aerospace Systems and Technology Track Start Term –2007-2 End Term –2007-3 Faculty Guide –Currently unknown Faculty Consultant –Dr. Jeff Kozak (ME)--Confirmed Faculty Consultant –Currently unknown Primary Customer –Name, ITT Space Systems, Title – As-yet unknown representative of ITT.

3 EDGE™ Phase 0: Planning Mission Statement Product Description Key Business Goals The primary business goals of this product are to Primary Market ITT Space Systems (customer) RIT Mechanical Engineering Department Future SD Teams in this project family Secondary Market Other aerial imaging groups Stakeholders Stakeholders in the design of our product include the following: -The customer, ITT Space Systems -The RIT Aero Design Team -Future SD teams -???

4 EDGE™ Phase 0: Planning Staffing Requirements Mechanical Engineers 2-3 -The MEs will be responsible for designing and constructing the enclosure for the Imaging System. This will include making sure that the total system meets the gross physical specifications (size and weight) to be able to fit in the Aero Design Team's Heavy Lift Aircraft. -Also, the MEs will need to do analyses of the system with an eye towards durability and shocks. Electrical Engineers 1-2 -The EEs on the team will focus on control systems for the Imaging System. Industrial and Systems Engineers 1 The ISE will be responsible for systems integration. Computer Engineers 1-2 -The CEs will work with the EEs on developing the control systems for the Imaging System Business Majors 0 At this time, I do not believe that a business major is necessary for this project. Imaging Science Majors 0-1 -An IS major may be needed for theoretical work.

5 EDGE™ Phase 0: Planning Resource Requirements People -The Aero Design Team has designed, built and flown a first-generation model of the UAV we will be using to carry the imaging system. Their information will be needed for the overall design. Also, the Aero Team will be needed when the project is ready for flight testing. -ME, EE, CE Faculty. The ability to consult with experienced faculty will be invaluable. -Other needs will be identified subsequent to customer interviews Environment -The project team will need a secure storage space for project parts. -The project team will need the ability, late in the project, to flight-test the project. -Other environment needs will be identified subsequent to customer interviews Equipment -The project team will need access to simple tools, the machine shop, CAD programs, circuit design tools and other resources. -Other environment needs will be identified subsequent to customer interviews Materials At this time, I am not certain what materials may be needed for this project. This will be clearer after customer interview(s).

6 EDGE™ Phase 1: Concept Development Identify Customer Needs - Interviews Primary Customer(s) ITT Space Systems is still determining a representative to work with the Senior Design Team. Once they have done so, one or more interviews will be needed to determine customer needs. Other Stakeholder(s) An interview with the lead of the Aero Design Team will be needed to determine gross physical specifications of the system. The system must fit in the cargo bay of the Heavy Lift Aircraft and be light enough to allow the plane to get off the ground. Also, the Aero Team will be needed for flight testing of the project. Past Senior Design Team(s) I was unable to find any prior SD teams involving the Heavy Lift Aircraft in the EDGE Database. However, a recent SD team (P07521) had a project to create an imaging platform for the Micro Air Vehicle. Dr. Esterman was the Faculty Guide for that project, I will need to interview him to find out if there was anything in that project that would aid this project.

7 EDGE™ Phase 1: Concept Development Identify Customer Needs - Benchmarking Competitive or Cooperative Solutions It may be possible to adapt some of the technology from the BRDF project (P07521). Otherwise, it may be possible to use a commercial digital camera as an imaging system. We're not out to redesign the wheel here, after all. Internet Search None yet. Technical Literature Search None yet.

8 EDGE™ Phase 1: Concept Development Identify Customer Needs - Interpret Needs Statements: 1.Imaging System must meed gross physical requirements of payload bay The maximum payload bay size is approximately 6”x6”x17”. The maximum lift weight for the Heavy Lift Aircraft is approximately 15 pounds. 2.Imaging System must be vibration-damped to allow clear pictures 3.System must be able to be “locked-in” to the payload bay (things shifting in flight is BAD). Graphical Interpretation 1.Due to lack of known needs, graphical interpretation is impractical at this time. Organize the Needs into a Hierarchy Again, lack of known needs makes this impractical. Establish the Relative Importance of the Needs Customer interview is needed to establish relative importance of needs. Reflect on the Results and the Process I have some outstanding tasks including searches, interviews, and establishing a guide and consultant(s).

9 EDGE™ Future Plan Where do you go from here? Once ITT finds a representative, customer interview(s) will be needed to establish customer needs. A Faculty Guide and at least one other Faculty Consultant are needed. Thorough Internet and Literature searches are needed. An interview with the Aero Design Team is needed to establish more detailed physical parameters.