Presentation is loading. Please wait.

Presentation is loading. Please wait.

Cold Chain Market In India India is the second largest producer of fruits and vegetables in the world. Due to lack of adequate cold storage facilities,

Similar presentations


Presentation on theme: "Cold Chain Market In India India is the second largest producer of fruits and vegetables in the world. Due to lack of adequate cold storage facilities,"— Presentation transcript:

1

2

3 Cold Chain Market In India

4 India is the second largest producer of fruits and vegetables in the world. Due to lack of adequate cold storage facilities, more than INR 100 bn worth of fresh produce is wasted every year in the country. In absence of improvements in the area of cold chain infrastructure, food wastage problem is likely to grow furthermore. More modern facilities along with planned establishment between the point of production and market can help India improve the situation, helping it lower wastage and increase profitability.

5 India needs investment of $ 2 billion for low-cost cold chain tech India needs $ 2 billion investment to set up low- cost and energy efficient cold chains in the country, Agriculture Ministry Radha Mohan Singh said,

6 Cold Chains can prevent Rs 13,600 crore worth food loss Lack of cold and frozen supply chains leads to loss of fruits and vegetables worth over Rs. 13,600 crore annually in the country, according to report. The report 'A tank of cold: Cleantech Leapfrog to a more food secure world' by UK- based Institution of Mechanical Engineers calls for urgent action to encourage roll out of sustainable cold chains in India to prevent unnecessary food loss, help alleviate hunger improve global food security. As much as 50 % of perishable food items are lost every year in India due to lack of cold storages, it said.

7 India is the world's largest producer of milk, and second only to china in fruit and vegetables. Yet agriculture, which makes up 53 % of the workforce, generates just 15 % of GDP. As of 2012, India had about 6,300 cold storages with a capacity of 30.11 million MT. But about 60% of them are located in Uttar Pradesh, Gujarat, west Bengal and Punjab. The Indian government as well as NGOs involved in development initiatives and retailers need to priorities investment into affordable, reliable and sustainable cold chain, said the report.

8 NABARD earmarks Rs. 1000 crore for Promoting Cold Chain Infrastructure National Bank for Agriculture and Rural Development (NABARD) earmarked Rs. 1000 crore for providing direct finance to cold chain infrastructure projects in the country, out of the Rs. 5000 crore Warehouse Infrastructure Fund announced in the Union Budget 2014-15. Cold Chain players in the public, private and cooperative sectors besides Farmers' Producers Organizations (FPOs) can now avail this direct credit window from NABARD at competitive interest rates.

9 Addressing various stakeholders recently, Dr. Harsh Kumar Bhanwala, Chairman NABARD said " NABARD has sanctioned warehousing projects worth Rs. 5000 crore during 2013-14 and we want to give a fillip to the much required cold storages with this specific earmarking of Rs. 1000 crores to begin with." These cold chain projects can benefit horticulture, dairy, meat and meat products, fish and fish products and other agriculture products to contain post production economic and quality losses. Shri. Dinesh Rai, Chairman, Warehousing Development and Regulatory Authority (WDRA), appreciated NABARD's decision to give boost to Cold Chain Infrastructure and called for creation of integrated clusters of cold storages with dedicated power feeders to address the issues of uninterrupted power requirements to such units.

10 Need for Greater Investment in Temperature controlled Warehouse We cannot afford to have such loss for India. Industry and Government can work out winning strategies for every Links in the chain for development of Food supply chain. Dream INDIA – A world food factory. 184 Million Hectares of Arable land. Gap of 37 million ton Cold Storages 280 Million Metric tonnes of Horticulture Produce Post Harvest Losses @ 30% ?

11 POSSIBLE REASONS Poor Infrastructure Insufficient Cold Storage Capacity Unavailability of Cold Stores near to Farms Transport Refrigeration This calls for investments as the primary need for Cold Storages and cold chain to save perishable horticulture produce thus strengthening and improving the food supply chain. This can result in Reduce wastage Creation of small scale Industries and Employment

12 Do We… Does the government focus on this? Yes_ [ NCCD is putting up commendable efforts in bringing knowledge and expertise in this field] Do We… Do we have know how and technology for building efficient Cold Storage / Cold Chain ? Yes_ Do we have food processing units successfully working in our country? Yes_

13 Govt. Support for cold storage Hon'ble Finance Minister in this budget speech for 2014-15, announced the establishment of a dedicated fund with a corpus of Rs. 5000 crore in NABARD, for projects related with agriculture commodity storage infrastructure sector. This fund is known as the Warehouse Infrastructure Fund (WIF) 2014-15. Under implementation - for eg. Nabard team has already started visiting Agra area for assessment on need of such assistance. Excise duty is fully exempt for specified equipments for cold stores or transport.

14 Deduction of 150 % of capital expenditure incurred for setting up and operating a cold chain facility(for computing taxable income) Service tax exempted for storage of agri cold storage and warehouse. Service tax exempted for erection, installation, commissioning of cold storage equipments, transport, technical testing and analysis. Investment Subsidy of 35% to 50% for cold chain projects available. 100% FDI through automatic route open for cold chain. Basic Custom duty @ 5% for imports specific for cold chain projects. Basic Custom duty @ nil for import of reefer vans and containers.

15 Making Application for a Letter of Intent under the scheme“ Capital Investment Subsidy Scheme for Construction / Expansion / Modernization of Cold Storages / Storages"

16 COMPONENTS:- Credit linked projects relating to cold storages including controlled atmosphere (CA) and modified atmosphere (MA) stores, pre-cooling units, other storages for onion, etc., their modernization are eligible for assistance under this component.

17 PATTERN OR ASSISTANCE The assistance will be as credit linked back-ended subsidy:- a) @35% of the capital cost of project in general areas and. b)50% in case of :- i) North East States:- Arunachal Pradesh, Assam, Meghalaya, Tripura, Mizoram, Manipur, Nagaland ii) Hilly Areas & iii) Scheduled areas. for a maximum storage capacity of 10000 MT per project.

18 Cold Storage Units Type:- 1 Basic Mezzanine Structure with Large Chamber (of>250 MT) Type With Single Temperature Zone NHB to take up projects with Capacity above 5000MT upto 10000MT

19 Sr. No. CapacityRate Per MT In RS Project Amount Subsidy In RS 35%50% 15001MT to 6500MT 7600494 Lac (6500*7600) 172.9 Lac 247 Lac 26501 MT To 8000 7200576 Lac (8000*7200) 201.6 Lac 288 Lac 38001 To 10000 6800680 Lac (10000*6800) 238 Lac 340 Lac

20 Cold Storage Unit Type 2 –PEB Structure for multiple temperature and product use, more than 6 chambers (of<250 MT) and basic material handling equipments. NHB to take up projects with Capacity above 5000 MT upto 10000 MT

21 Sr. no. CapacityRate Per MT In RS Project Amount Subsidy In RS 35%50% 15001MT to 6500MT 9500617.5 Lac (6500*9500) 216.12 Lac 308.75 Lac 26501 MT To 8000 9000720 Lac (8000*9000) 252 Lac 360 Lac 38001 To 10000 8500850 Lac (10000*8500) 297.5 Lac 425 Lac

22 Cold Storage Units Type 2 With Add On Technology For Controlled Atmosphere NHB to take up projects with Capacity above 5000 MT upto 10000 MT

23 Sr. no. CapacityRate Per MT In RS Project Amount Subsidy In RS 35%50% 15000 MT10000500 Lac (10000*5000) 175 Lac 250 Lac

24 Technology Induction And Modernization Of Cold Chain NHB to take up projects with Capacity above 5000 MT upto 10000 MT

25 S. No.ItemDescriptionAdmissible Cost iCA Generator* Inclusive of sensors, pressure equalising equipment, controls Rs. 125.00 lakh-per unit, maximum 2 generators iiSpecialised CA DoorsAdd-on specialisation to storage doors for positive pressure chambers Rs. 2.50 lac per door, maximum 20 doors iiiCA TentsLow cost enclosure of polyethyelene PVC, mylar or other impermeable body for existing or new cold stores As per original invoice, maximum 5 enclosures ivProgrammed Logic Controller (PLC) equipment Electronic and electrical logic controls for machinery & equipment for existing or new cold stores 50% of cost as per original invoice, maximum Rs 10.00 lakh

26 S.N o. ItemDescriptionAdmissible Cost vDock LevelersIn existing or new storagesMax Rs. 7.00 lakh per unit, max 5 units viWarehouse Development & Regulatory Authority (WDRA) / Negotiable Warehouse Receipt (NWR) system, equipment Computers and printers & software for use with NWR of WDRA 100% of cost as per original invoice, maximum Rs. 2.00 lakh viiSpecialised PackagingAutomated packaging lines for fruits & vegetables with farm code labelling, with packaging material 100% of cost as per invoice, maximum Rs. 15.00 lakh per project viiiHigh Reach Material Handling Equipment(MHE) Specialised material Handling equipment Rs. 17.00 lakh per unit, for max 2 units.

27 Revised Operational Guidelines for release of subsidy in respect of projects under NHB schemes With a view to:- 1)promote horticulture and 2)creation of critical infrastructure for the sector and 3)to reduce the interest burden on the loan taken by the farming communities/entrepreneurs.  On projects considered under the credit linked back ended subsidy scheme of the Board,  Operational Guidelines have been revised for the release of subsidy.

28 Procedure for submission of documents/papers for final subsidy claim to the Board i) The concerned FI/Bank which has provided credit for the project shall submit subsidy claim in prescribed format to respective office of NHB  To respective State Office of NHB-upto the project cost of Rs.50.00 lakh.  To NHB, HQ, Gurgaon where the project cost is above Rs. 50.00 lakh, ii) Upon release of 50% instalment of term loan by bank to promoter, NHB would release 100% subsidy to the concerned bank/FI as per prevailing cost norms. iii) The subsidy would be kept frozen by bank/Fl in the Subsidy Reserve Fund Account (SRFA) of the NHB.

29 Final subsidy claim on completion of project and upon release of final withdrawal of term loan by the Bank/Fl A Joint Inspection Team (JIT) consisting: 1) Representative from bank, 2) NHB, State Hort./Agri. Department. will conduct joint inspection of the project to settle the final subsidy claim based on eligible project cost on the basis of all the relevant parameters and approval of appropriate committee of NHB.

30 (a) Financial appraisal report of the bank. (b) Term loan sanctioned letter issued by the bank with detailed terms and conditions. (c) Term loan disbursement schedule for the project (d) Extract of term loan account of promoter. (e) Affidavit in Format-IV. (f) Release of at least 50% of term loan into project Bank loan account. Documents to be submitted with the subsidy claims :

31 Final subsidy claim shall be submitted to the Branch Office of NHB or to the Head Office, NHB as the case may be, along with following documents. (i) Completion Certificate by Bank/FL (i) Term loan disbursement details date-wise. (i) Statement of Expenditure incurred certified by bank for project costing upto Rs. 50.00 lakh or by Chartered Accountant (CA), if project cost exceeds Rs. 50.00 lakh. Documents to be submitted with final subsidy claim

32 Procedure for adjustment of borrower's account 1)The subsidy released by NHB to the Bank/FI in favour of the project shall be kept in a separate account termed as Subsidy Reserved Fund Account of NHB in the name of the beneficiary. 2) The subsidy amount shall be released as soon as the 50% of the term loan is released to the beneficiary. 3)Subsidy so released shall be frozen in the Subsidy Reserve Fund until the completion of the project, and released finally after inspection.

33 4) Banks shall not charge interest from the beneficiary to the extent of amount available in the Subsidy Reserve Fund for which due credit be given to the beneficiary. 5) The full project cost excluding the subsidy amount and the margin money contribution from the beneficiary would be disbursed as loan by the banks and the repayment schedule will be drawn on term loan amount. Procedure for adjustment of borrower's account

34 6) Final settlement will be made only after Joint Inspection by Bank, NHB and State Government representative, and clear written advice of NHB with regard to the eligible project cost and amount of subsidy to be released to the promoters account. 7) Only on receipt of this advice, banks will release the eligible subsidy to the beneficiaries, and refund the balance amount (if any) to NHB along with the interest of the amount to be refunded to NHB. Procedure for adjustment of borrower's account

35 The bank/FI shall submit to NHB Utilization Certificate of the subsidy amount in prescribed format. Submission of the Utilization Certificate by the Bank/Fl.

36 1) Bank branches will send the statement of account of SRFA of NHB quarterly to the state offices of NHB (and also the Head office of NHB in case the subsidy has been released directly by Head Office). 2) State Office In-charge shall review the subsidy releases every month and will monitor its utilization and refund. 3) State-wise register will be maintained by concerned Centre ln charge for centres and by the Finance & Accounts Division for Head Office. 4) Area Officers shall review the subsidy release, utilization and refund quarterly. Mechanism to keep track of amounts released to various Banks by way of subsidy, amount utilized and the amount to be collected back from banks that are not disbursed.

37 5) The bank will furnish the information regarding Account No. of SRFA, name of the project, date and amount of subsidy released by NHB in SRFA, date, amount of subsidy adjusted in term loan (with Account number), date and amount refunded by bank to NHB. 6) Internal audit will be conducted (on test basis) of the subsidy release, utilization and refund as per the provisions of the guidelines. 7) F&A Division shall overall monitor the releases, utilization and refund of subsidy regularly and to bring out cases of default and issue suitable advice to concerned Area Officers for taking corrective measures. Mechanism to keep track of amounts released to various Banks by way of subsidy, amount utilized and the amount to be collected back from banks that are not disbursed.

38 Other Provisions a)The subsidy so granted to the lending banks/Fls shall be deemed as estimated (tentative) only. b)Final amount shall be determined on the basis of the Joint Inspection Team by the Approval Committee on completion of the project. c)The subsidy will be adjusted by bank only after receiving the written advice of NHB for this purpose and balance amount would be refunded to NHB within 30 days. d)For any delay beyond it, bank will be liable to pay interest on the refundable amount. e)Requirement of application for the Letter of Intent (L01) will be voluntary for the promoter and would be issued only on the request of the promoter. This will not be required for claim of subsidy. f)It is expected that the lending bank would undertake necessary inspection(s) and technical & financial appraisal to ensure that the project is new, meets the guidelines of NHB, and the promoter has clear land title or lease hold right over the land before the release of term loan.

39 Other Provisions g)In case the project is not completed within 18 months from the date of release of estimated (tentative) subsidy, the project would not be eligible for any subsidy, unless the promoter has sought extension of time from NHB under unavoidable or exceptional circumstances. In such cases, the bank would refund the subsidy to NHB expeditiously or not later than 30 days after such period. h)The decision of NHB with regard to eligibility and interpretation of the guidelines shall be final and binding on the beneficiaries and banks.

40 NORTH EAST STATES ELIGIBLE FOR 50% SUBSIDY

41 HILLY AREAS ELIGIBLE FOR 50% SUBSIDY

42

43

44

45

46

47

48 SCHEDULED AREA ELIGIBLE FOR 50% SUBSIDY

49

50

51

52

53

54 CONTACT G.B.MODI CHARTERED ACCOUNTANT Email:- gbmodi@hotmail.comgbmodi@hotmail.com Mo. 9422285096,9923205127


Download ppt "Cold Chain Market In India India is the second largest producer of fruits and vegetables in the world. Due to lack of adequate cold storage facilities,"

Similar presentations


Ads by Google