Presentation is loading. Please wait.

Presentation is loading. Please wait.

Status Report #3 Environment Monitoring System Andrew Tracy Alondra Vallejo Khoa Tang Eduardo Ramirez.

Similar presentations


Presentation on theme: "Status Report #3 Environment Monitoring System Andrew Tracy Alondra Vallejo Khoa Tang Eduardo Ramirez."— Presentation transcript:

1 Status Report #3 Environment Monitoring System Andrew Tracy Alondra Vallejo Khoa Tang Eduardo Ramirez

2 Overall Need/Milestone To find the relationship between weather conditions and the toads’ call. Milestones: – Software Design (10/05) – Power Management System (10/7) – Power System (10/15)

3 Tasks Completed Testing the audio filter Received all components – FPGA – Weather System

4 Ongoing/Pending Tasks Software Design – Getting LabView for FPGA from OIT

5 Upcoming Tasks Software Design Power Management System Assembling Hardware

6 0% 90% 0% 85% 0% 25%100% 25%

7 Project Schedule


Download ppt "Status Report #3 Environment Monitoring System Andrew Tracy Alondra Vallejo Khoa Tang Eduardo Ramirez."

Similar presentations


Ads by Google