Presentation is loading. Please wait.

Presentation is loading. Please wait.

Burlington County. Initial Networks 79 Stations, 47 Interchanges, Total guideway length is 101.38 km. (63 miles)

Similar presentations


Presentation on theme: "Burlington County. Initial Networks 79 Stations, 47 Interchanges, Total guideway length is 101.38 km. (63 miles)"— Presentation transcript:

1 Burlington County

2 Initial Networks

3 79 Stations, 47 Interchanges, Total guideway length is 101.38 km. (63 miles)

4 Total Stations:27 Total Interchanges:17, Total guideway length is 39.56 km. (24.58 miles)

5 Total Stations:30 Total Interchanges:16, Total guideway length is 40.42 km. (25.12 miles)

6 Total Stations:22 Total Interchanges:14, Total guideway length is 25.42 km. (15.79 miles)

7 Networks Statistics; Burlington County StationsInterchanges Miles of Guideway Length Total Trip ends servedToal Trips Peak hour TripsFleet size Average trip Length Average Vehicle OccupancyFare Vehicle Operating Costs (#) (miles)(per day) (#)(Miles) (Trips/vehicl e) 714163 798,808 45,077 6,762 74452 $ 3.00 $ 0.20 Basic Costs, Revenue; Burlington County Capital CostsAnnual Recurring CostsAnnual RevenueP&L StationsGuidewayVehiclesTotal Cost of Capital Maintenanc e OperatingTotalFare Station lease and naming rights Total (M$) $ 142 $ 315 $ 74 $ 531 $ 43 $ 11 $ 7 $ 60 $ 41 $ 3 $ 43 $ (17)

8 Break Even point: $4.25

9 Expansion and Connection StageStationsInterchangesGuideways (mi) 1714163 2190174131.44 3298286299.63 4392388409.16 5574513601.49

10 Full Network

11 Total Stations:574 Total Interchanges:513, Total guideway length is 968 km. (601.49 miles)

12

13

14

15 Profit

16 Number Trip ends served home school work shopping transportatio n entertainment/et c dinning Total 1 6,424 942 1,254 8,360 16,980 2 27,908 1,953 9,420 39,281 3 4,248 8,172 48,840 61,260 4 2,040 936 3,270 6,246 5 1,812 9,470 11,282 6 4,336 423 2,820 7,579 7 3,484 … Total 999,124 63,392 612,018 - - 2,654,486 - 4,329,020 County Total Trip Ends 1,770,364 101,918 1,005,180 - - 4,304,098 - 7,181,560 T rips served (per day) 1,315,015

17 Networks Statistics; Burlington County StationsInterchanges Miles of Guideway Length Total Trip ends servedTotal Trips Peak hour TripsFleet size Average trip Length Average Vehicle OccupancyFare Vehicle Operating Costs (#) (miles)(per day) (#)(Miles) 574513601.49 4,346,000 1,315,015 197,252 21,69852 $3.00 $0.20 Basic Costs, Revenue; Burlington County Capital CostsAnnual Recurring CostsAnnual RevenueP&L StationsGuidewayVehiclesTotalCost of CapitalMaintenanceOperatingTotalFare Station lease and naming rightsTotal (M$) $1,148 $3,007 $2,170 $6,325 $506 $ 127 $197 $ 830 $1,184 $21 $1,204 $374

18 Break even point: $2.05

19 Conclusion Great location for connectivity to other counties Rough start, but better with more stations over time Gradual reduction in fares Size of demand greatly varies across the county


Download ppt "Burlington County. Initial Networks 79 Stations, 47 Interchanges, Total guideway length is 101.38 km. (63 miles)"

Similar presentations


Ads by Google