Presentation is loading. Please wait.

Presentation is loading. Please wait.

Guenther Rosner DIRACmidterm, GSI Darmstadt, 8/12/06 1 Task 4  PANDA 3 Magnet design and integration of detectors Milestones Status Outlook.

Similar presentations


Presentation on theme: "Guenther Rosner DIRACmidterm, GSI Darmstadt, 8/12/06 1 Task 4  PANDA 3 Magnet design and integration of detectors Milestones Status Outlook."— Presentation transcript:

1 Guenther Rosner DIRACmidterm, GSI Darmstadt, 8/12/06 1 Task 4  PANDA 3 Magnet design and integration of detectors Milestones Status Outlook

2 Guenther Rosner DIRACmidterm, GSI Darmstadt, 8/12/06 2 Milestones & deliverables Milestones 1)10 th monthSuperconducting solenoid coil material selected.  2)16 th month Magnetic field, raytrace and finite element stress calculations finished for Solenoid and Dipole.  3)16 th month Design of superconducting parts of solenoid and dipole coils, cryostats finished.  4)30 th monthTests of coil and cryostat prototypes for solenoid and dipole finished. 5)33 rd monthConceptual design solenoid and dipole. Deliverable: Technical Design Report

3 Guenther Rosner DIRACmidterm, GSI Darmstadt, 8/12/06 3 Decoupling of Solenoid and Dipole

4 Guenther Rosner DIRACmidterm, GSI Darmstadt, 8/12/06 4 Normal conducting clam shell Dipole Rectangular racetrack coils Return yoke  Segmented  Simple geometry (still being optimised re costs) Tracking drift chambers  Design & test  Mechanical engineering Mid-plane iron plate? Budgetary prices: Ansaldo, I: €1.7M Danfysik, DK: €1.6M All requirements fulfilled! (Milestone #2)

5 Guenther Rosner DIRACmidterm, GSI Darmstadt, 8/12/06 5 Solenoid Crucial requirements  Magnetic field strength B = 2 T at interaction point & inner tracker  B field homogeneity ± 2 % in outer tracker region  Radial Br/B 0 integral ≤ 2 mm in outer tracker region  Magnetic stray field < 1 mT in DIRC readout region

6 Guenther Rosner DIRACmidterm, GSI Darmstadt, 8/12/06 6 Genoa design Choice: 3 SC coils wound inside a 5083 Al mandrel (cf. BaBar, Aleph)  Rutherford type cable compensated in Al (Milestone #1) Minimum length of iron yoke   Coil axially off-centre w/r yoke  approx. 100 t axial forces Magnetic screening of DIRC PMT‘s (< 1mT)  Thin-walled iron doughnut + 1 correction coil Price tag: €4.6M (budget price Ansaldo, I)  including iron yoke, excluding cryogenics All requirements fulfilled (Milestones #2 and #3)!  B/B ≤ 2%  Bdr/B 0 ≤ 2.2mm

7 Guenther Rosner DIRACmidterm, GSI Darmstadt, 8/12/06 7 Dubna design Choice: Inner mandrel, 2 coreless coils  NbTi/Cu SC cable takes up hoop stress (Milestone #1)  He bath cooling Longer iron yoke  Coil position more axially symmetric w/r yoke  12 t axial forces Magnetic screening of DIRC PMT‘s (< 1 mT)  Massive iron endcap + 2 correction coils All requirements fulfilled (Milestones #2 and #3)!

8 Guenther Rosner DIRACmidterm, GSI Darmstadt, 8/12/06 8 Outlook All current Task 4, PANDA 3, milestones reached. No show stoppers anticipated until end of play. International review committee to evaluate Dubna vs. Genoa solenoid design in 2007.


Download ppt "Guenther Rosner DIRACmidterm, GSI Darmstadt, 8/12/06 1 Task 4  PANDA 3 Magnet design and integration of detectors Milestones Status Outlook."

Similar presentations


Ads by Google