1 SNS Machine Protection System Final Design Review Introduction
Dave Gurd Tuesday, September 11, 2001

2 Review Committee Members
Kelly Mahoney (Jefferson Lab) Chair Mike Thuot (LANL) Ken Reece (SNS/ORNL) George Dodson (SNS/ORNL)

3 Presenters Coles Sibley Cognizant Engineer Saeed Assadi Ron Battle

4 Scope (2) – Personnel Safety Systems are not under Review Today
Target Protection System Personnel Protection System “High QA” System Machine Protection – Latched Machine Protection – Auto reset Run Permit (Software Layer)

5 Scope This is the Final Design Review for the SNS Machine Protection System Hardware. The Software System that uses this hardware will be reviewed separately, and at a later time. The “High QA System” discussion is a Preliminary Design Review” only, preparatory to a planned Project Change Request.

6 System under review is in WBS 1.9.2 (Global Systems)
ICWG 1.3 1.4 1.4 Cryo 1.5 1.6 1.7 1.8 1.9 Front End Linac (JLAB, ORNL) Ring Target Instruments Facilities Controls (LBNL) (LANL) (BNL) (ORNL) (ORNL, ANL) (ORNL, CM) 1.9.3 1.9.4 1.9.10 1.9.5 1.9.6 1.9.8 1.9.9 Front End Linac Cryo Ring Target Facilities Personnel Controls Controls Controls Controls Controls Controls Safety 1.9.2 “Global” Controls: (Network, Timing, Protection, Control Room, Labs, Applications, System Software) 1.9.1 Integration & Management

7 Charge to the Committee
Is the Scope well defined and understood? Are all the Requirements understood and well-defined? Is the hardware proposed flexible enough to do what is required? Are all of the Interfaces – internal and with other systems – appropriate and well-defined? Does the Design presented meet the requirements? Issues? Anything missing? Anything dumb? Are there any Safety or QA issues requiring attention? Is the Cost and Schedule credible with respect to the design and to the project schedule? Are there any major Unresolved Issues? Bottom Line: Can we proceed with Procurement and Fabrication?

8 Schedule 10:00 – 10:15 Intro Dave Gurd 10:15 – 12:00 MPS C. Sibley
10:15 – 10:35 MPS Overview (Latched and Auto Reset) 10:45 – 11:45 MPS Software, MPS Hardware, Altera Code 11:45 – 12:00 Cost, Schedule 12:00 – 1:00 Lunch 1:00 – 1:15 Target Protection Ron Battle 1:15 – 1:30 Diagnostics Saeed Assadi 1:30 – 2:00 HQA System C. Sibley 2:00 – 2:15 Cost Schedule C. Sibley

9 Machine Protection System Final Design Review September 11, 2001
Coles Sibley 2000-0xxxx/vlb

10 Related Documents High QA MPS Description (Sibley)
Interface Requirements Document for MPS and Front End Equipment (Sibley) SNS MPS VME/PMC Module Design (Sibley) MPS System Requirements Document (Sibley) MPS Interface Requirements Document (Sibley) SNS Beam Loss Policy (Dodson) ASD Control of Beam Power (K. Reece) Preliminary Safety Assessment Document (PSAD) Copper damage from fast Beam Loss (Shafer) Front End Cutoff Devices (Staples) Have hard copies available

11 Questions for Committee
Mode Masking is critical. Are Hardware / Software protections presented adequate? Are we Interlocking ourselves to TOTAL SAFETY- NO BEAM? Availability verses reliability? Flexibility vs. reliability? (Commissioning) Should corrector power supply ON status be an MPS Input? Presently NO. Will keep real estate available for the future. Are Redundant PLC’s and Current sensors required? Is FPS-Latched OK for redundancy? Is Voltage and current read back OK verses 2 Zero Flux? Layout of inputs indicates a better arrangement is 16/0, or 0/16 instead of 8/8. Very minimal coding change.

12 Machine Protection System (10:00 – 12:00)
Machine Protection System Overview Mode and timing info throughout MPS Talks MPS Software Overview MPS Hardware, Firmware Cost Schedule Acronyms FPS Fast Protect System FPL Fast Protect Latched FPAR Fast Protect Auto Reset BLM Beam Loss Monitor

13 Machine Protection is a Global Subsystem
ICWG include JLAB 1.3 1.4 1.5 1.6 1.7 1.8 1.4 Cryo 1.9 Front End Linac Ring Target Instruments Facilities (JLAB, ORNL) Controls (LBNL) (LANL) (BNL) (ORNL) (ORNL, ANL) (ORNL, CM) 1.9.3 1.9.4 1.9.5 1.9.6 1.9.7 1.9.8 1.9.10 1.9.9 Front End Linac Ring Target Instrument Facilities Cryo Personnel Controls Controls Controls Controls Controls Controls Controls Safety 1.9.2 “Global” Controls Machine Protection 1.9.1 Integration & Management

14 MPS Design Assumptions
Four layers of protection! High QA (Hardware) PLC Hardware / Software (Fast Protect System) Software (Run Permit System) Machine Protection System is not a “Safety Class” or “Safety Significant” System. SNS will be built and commissioned in Phases, MPS must accommodate this schedule, (Flexible and Reliable). Reliability – The Machine Protection System must inhibit the beam when required. It must fail in a SAFE state. Availability – The machine availability should be as high as possible. The MPS must be easy to configure and have a “friendly” operator interface. False trips must be minimized.

15 MPS - Layered Protection

16 SNS Accelerator Timing Sequence

17 Mode Definitions Machine Modes Beam Modes PPS /Beam Permit Ion Source
D-Plate Linac Dump Injection Dump Ring Extraction Dump Target Beam Modes Off Standby (RFQ RF gate) Diagnostics (10 usec) Diagnostics (50 usec) Diagnostics (100 usec) Full Pulse Width (1 msec) Low Power (7.5 kW) Medium Power (200 kW) Full Power (2 MW)

18 Background - SNS Events (Prioritized)
5 thru 36 - Operating Mode (same as RTDL frame data) Hardware / Software from PLC through EPICS Beam dump, power limit, Pulse length limit Injection rates limited by dump power and pulse width DTL for commissioning only

19 MPS Fast Protect System
Fast Protect Auto Reset (20 microseconds) Inhibits beam for duration of macro pulse by disabling FPS_PERMIT_LINK_B carrier to the front end. Restores Fast Protect link for next pulse if fault restored to normal. Fast Protect Latched System (20 microseconds) Latches fault conditions until fault clears and Operator resets condition. FPS_PERMIT_LINK_A carrier interrupted and inhibits beam through front end devices. Run Permit System (1 second) Coordinates machine mode changes. Scans IOC configurations for Software Configuration errors. EPS interface for masking equipment inputs. High QA MPS (2 Pulses) Latched in Hardware Redundancy through FPLS inputs Identical Systems, different reset

20 Copper Damage from Fast Beam Loss (R. Shafer)
Time to reach thermal stress at front surface – column 3 Estimated time to reach the thermal stress limit at the Bragg peak - column 5 Conclusion Based on these estimates, it is apparent that significant damage can occur in the DTL unless the MPS Fast Protect can shut down the beam in less than about 5 microseconds for beam losses at E<= 7.5 MeV. For the CCL (E>87 MeV), 20 microseconds is adequate. There is no risk of damaging the RF structures during commissioning with single 52-mA, 600-ns long minipulses.

21 MPS Response Time (Estimate)
Fiber speed = 0.65C Copper speed = 0.65C MPS Board delay = 75 nsec

22 MPS Fast Protect System Layout
Master oscillator signal to carrier links Input Links will be discussed Add estimated time range

23 MPS Master Four shutdown devices

24 Front End Shut Off Devices
MPS HQA - PPS Only if MPS detects fault HQA- 65 kV power supply OK HQA - RFQ Power supply (Interlock) OK, but 5 min. recovery FPL - 65 kV fast switch OK, 100 msec’s FPL - RFQ Power supply OK, but 5 min. recovery FPAR - RFQ RF drive OK, Off, move gate, ON FPAR - LEBT Chopper Fails unsafe* – BUT Fast MEBT Chopper Could damage chopper RF Reference line Long recovery LEBT Valve Power limit, Not a beam stop Beam Stop none +/- 40 kV lens supplies Not 100 % RF Plasma Source PS Thermal instabilities RF plasma source gate OK for short time * PAC 2001 paper, SNS Beam Chopping and its Implications for Machine Protection, L. Doolittle, C. Sibley

25 Fast Protect – Auto Reset
ALARA – Pulse Width Modulation Tuning Aid, ALARA Concentrates Permit Inputs Inputs Bypassed by Mode Inhibits carrier link to disable Beam Inputs: Loss Monitors Software trip points, bypass RF Low level Controls (Maybe latched) Software maskable Auto mask sets (Wire Scanner)

26 Beam Loss Monitors (Saeed’s Talk)
Integration Time – Set in Hardware Trip point limits – Software adjustable - EPICS Dose Rate Calibration Masking Capabilities – Software Masks Wire Scanner Masks – Auto mask sets for each W.S. Placement – Near Quadrupoles, Redundant coverage HV Supply – 1 HV supply takes down every other BLM Configuration Control Commissioning vs. Run Periods

27 EDM EPICS Loss Monitor display

28 Auto Reset Inputs

29 Fast Protect - Latched System
Concentrates Permit Inputs Inhibits carrier link to disable beam Devices bypassed by Jumper or PLC and Software Configuration determined on a case by case basis Inputs Bypassed by machine mode (event link) System Configuration Control Equipment maintained in locked racks Documentation control of changes System verification after changes

30 Fast Protect - Latched Inputs
Power supply status NO-Fault signal removed when interlock chain dropped or power supply receives OFF command Valve Status No Fault signal when valve is open and NOT closed (intermediate states are faults) Linac RF Status RF Enabled Signal. Could be auto reset input Target Status Input comes from the target control system. Response should be faster than target shutdown signal. Time Stamp verifies MPS ACTED FIRST

31 Fast Protect – Latched Inputs
Dump Status Passive Dump Status from PLC Vacuum Status Poor integrated vacuum levels Timing System Status Ring RF required for IDMP, RING, EDPM, and target modes Local Oscillator allowed for LDMP, Dplate, and Ion Source modes PPS Input PPS search status will latch off beam Beam Collimator’s Water cooling LEBT Chopper Required for Ring Operation

32 Fast Protect - Latched Inputs
Loss monitors (Near BCM’s, HIGH QA) Current monitors Integrated current monitors Pulse Width violations Idmp over current monitor HARP Beam current intensity SEM With each HARP Beam Position Monitors Beam off target/dump violation Wire scanners, Faraday cups “Home” Limit switches

33 Fast Protect - Latched Inputs
Beam Loss Accounting system Software integrated loss EPICS Alarm Inputs EPICS Alarms for any PV can trigger latched input on a board level or input signal level. Injection Kickers Power supply status Waveform errors Kicker pair matching Extraction Kickers PS Status Kickers Charged Ring RF

34 Latched Inputs Includes Corrector Power Supplies

35 Number of MPS Systems

36 MPS Input Bypass Mechanisms
Mode Mask Global database contains operating mode dependant devices. Devices not required for present mode are masked through hardware. Masks changed with database reconfiguration and IOC reboot. Jumper / Key / PLC Bypass Software bypass requires set of closed contacts from a jumper, key, or PLC contacts. Software Bypass If hardware configuration allows, input bypassed through software with appropriate EPICS Access Security permissions. The installation of bypass jumpers will be determined on a case by case basis by committee. Configuration control is monitored by RPS through EPICS.

37 Wire Scanner (Layered) Protection
Application Requests W.S. Mode, receives “SW KEY” Run permit won’t allow long pulse until APP releases key Program crashes, etc. require manual intervention, verification MODE changed to 10, 50, or 100 usec as appropriate IOC Receives Request for scan Motor Record is locked by mode (Allowed by low PW MODE) MODE == SHORT_PULSE, scan starts MPS Hardware input masked by MODE (Not software) Limit switch will cut off beam if not masked by MODE MASK MODE changes while wire off stops -> Beam cut off Motor breaks -> Manual intervention required to get wire out of beam

38 MPS Conclusion Several layers of protection, Defense in Depth
System is flexible, easy to add / delete sensors as required Ability to mask through software will increase availability Easy to run during phased installation. Hardware enabling SW masks allows configuration control where required, flexibility to mask at will, with same hardware.


Download ppt "SNS Machine Protection System Final Design Review Introduction"