1 ET-493 Senior Design By: Brian Toomer Advisor: Mr. Rode’

2  The purpose of this project is to show that I can complete a construction project using all aspects of the construction process.  This project will exercise the skills and abilities learned from the Construction Engineering Technology program.

3  Preliminary Drawings  Rough Estimate  Economic Feasibility Report  Site Assessment and Selection  Decision on Building Layout  Building Codes

4  Wood Framed  Concrete Foundation  Estimated 3,826 sq. ft. for each building  Estimated 957 sq. ft. for each unit.

5  Drawings will be used for a rough estimate and budget.  One story layout.  Two story layout.  Each building will have 4 units.  Three bedrooms  Two Bathrooms  Kitchen  Utility  Living and Dining Room

6

7

8

9  Cost/Benefits Analysis Do the Benefits outweigh the Costs for the owner? Will it be a profitable business ? How long will it take for the business to pay itself off?

10  Location will be in the Hammond area.  The owner would like a site big enough for future expansion, if desired.  Once the land is chosen it will be surveyed.  Building codes will be acquired.  The location, size, and cost of property will determine: The building layout that will be used. The number of buildings that can be built on the property.

11  The completion of the activities this semester will allow the full completion of the pre-construction documents for next semester.

12 The construction documents will include:  Final Drawings (using AutoCad):  Floor plan  Electrical  Plumbing  Elevations  Schedules and Details of Construction  Overall Site Drawing (parking included)

13  Building specifications  Building Permits  Project budget and financing  A complete estimation of labor, costs, and materials  Detailed materials and equipment list  Planning and scheduling of the project using Primavera Project Planner.

14 Aug-20-Aug 22Meet with advisor to discuss topic Aug 25 - Aug 29Cont. Sept1 - Sept 5Cont. Sept 8 - Sept 12Select a Project Sept 15 – Sept 19Begin Research Sept 22 – Sept 26Prepare Proposal and Presention Sept 29 – Oct 3Preliminary Drawings Oct 6 – Oct 10Cont.

15 Oct 13 – Oct 17Economic feasibility assessment of Costs and Benefits Oct 20 – Oct 24Cont. Oct 27 – Oct 31Rough Estimate and Budget Nov 3 – Nov 7Site Assessment and Selection Nov 10 – Nov 14Cont. Nov 17 – Nov 21Decide on Building Layout Nov 24 – Nov 28Building Codes Dec 2 – Dec 5Begin Final Drawings/ End of Classes

16 Jan 20 – Jan 23Construction Documents: Floor plan/ Electrical/ Plumbing/ Elevations/ Overall site plans/ Jan 26 – Jan 30Cont. Feb 2 – Feb 6Cont. Feb 9 - Feb 13Cont. Feb 16 - Feb 20Project Budget and Financing Feb 23 - Feb 27Cont. Mar 2 – Mar 6Building Specifications Mar 9 – Mar 13Cont.

17 Mar 16- Mar 20Estimation of materials, costs, and labor Mar 23 – Mar 27Cont. Mar 30 - Apr 3Building Permits Apr 6 – Apr 10Planning and scheduling using Primavera Apr 13 - Apr 17Cont. Apr 20 – Apr 24Cont. Apr 27- May 1Prepare for final presentations May 4 – May 8Present Project

18 QUESTIONS??????