Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Data Capturing Infrastructure Stathis Plitsos, AUEB-RC.

Similar presentations


Presentation on theme: "1 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Data Capturing Infrastructure Stathis Plitsos, AUEB-RC."— Presentation transcript:

1 1 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Data Capturing Infrastructure Stathis Plitsos, AUEB-RC

2 2 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Architecture High point of view

3 3 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Architecture drill down

4 4 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Data Acquisition / Collection ARTISAN must be able to deal with two different cases – Embody existing Energy Management Systems, e.g. Barco-Vision ‘Energy-Master’ – Use ‘open-solutions’

5 5 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Embody Existing EMSs Data Acquisition module able to – Collect energy consumption data from the installed EMS; – Send these data to Data Repositories Layer.

6 6 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Barco-Vision EMS Components

7 7 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Using ‘Open Solutions’ Embody different types of metering equipment compliant with international standards Metering devices – ABB – Schneider-Electric – ….

8 8 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ABB

9 9 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Schneider-Electric

10 10 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Next steps Focus on two topics 1.Software 1.Develop an additional tool that embodies existing EMSs and their software issues (e.g., MC’s case) 2.Lab testing of any software developed so far. 2.Hardware 1.Installation of metering devices where needed (e.g., Piacenza) 2.Testing of software with real data.

11 11 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Time-plan (indicative) Main goal: to show ARTISAN Service 1 in the 1 st review meeting; Hence: real-time energy data capturing has to be implemented until end of September; Same applies for the installation of metering devices and the interconnection with the EMS of the users. 11


Download ppt "1 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 ARTISAN 1st Plenary Meeting May 8th – 9th 2012 Data Capturing Infrastructure Stathis Plitsos, AUEB-RC."

Similar presentations


Ads by Google