Presentation is loading. Please wait.

Presentation is loading. Please wait.

The Tail-Gate Information System Team: Paul and David Wickert Sponsor: Colorado AAA Advisor: Dr. Mark Wickert.

Similar presentations


Presentation on theme: "The Tail-Gate Information System Team: Paul and David Wickert Sponsor: Colorado AAA Advisor: Dr. Mark Wickert."— Presentation transcript:

1 The Tail-Gate Information System Team: Paul and David Wickert Sponsor: Colorado AAA Advisor: Dr. Mark Wickert

2 Overview The purpose of the tail-gate information system Requirements and stretch goals System block diagram Task breakdown Project schedule Budget Summary

3 Purpose Drivers that tail-gate are a danger to all of us The proposed system will allow the driver in front (the victim) to display simple informative messages for the tail-gater to read The messages will be informative to alert the driver of dangerous actions and how to correct them

4 System Concept Message Display Tail-Gate Driver Kind Words Feedback To Driver Data Entry Console for Driver Too Close!!

5 Requirements System must operate on 12v automotive supply Rear display must not obstruct drivers view Messaging interface must be voice operated to minimize distractions to the driver … Stretch Goals Cell phone interface for State Patrol and E911 alerting via voice control

6 System Block Diagram Display Panel Operator Console Catalog of Responses Display Computer

7 Description of Major Tasks Design Task 1 will consist of … Subtask a Subtask b Design Task 2 will consist of … Subtask a Subtask b

8 Project Schedule Research Design Task 1 Design Task 2 Design Task 3 Integrate 1 & 2 Integrate 1, 2, & 3 Final Test 9/6 9/13 12/10 9/20 12/6 D. WickertP. Wickert 10/22 Presentations =

9 Budget Item 1$25.00 Item 2$15.00 Item 3$5.00 Item 4$50.00 Item 5 (donation)$5,000.00 Total$5,095.00 Total with donations$95.00

10 Summary We have proposed the Tail-Gate Information System as an innovative system for improving driving safety and peace of mind among concerned drivers The design and implementation plan has a reasonable schedule with subtasks Task 1 Task 2 Task 3


Download ppt "The Tail-Gate Information System Team: Paul and David Wickert Sponsor: Colorado AAA Advisor: Dr. Mark Wickert."

Similar presentations


Ads by Google