Statewide Measure Cost Update Overview & Discussion.

Similar presentations


Presentation on theme: "Statewide Measure Cost Update Overview & Discussion."— Presentation transcript:

1 Statewide Measure Cost Update Overview & Discussion

2 August 18, 2004CALMAC Discussion2 Background & Purpose Background –Measure cost studies provide the average incremental and full costs for new and retrofit energy efficiency measures (commercial and residential). –Typically performed in concert with DEER energy savings estimates. –Last update conducted in 2001. Purpose –Create a common set of cost information and assumptions to be used as a starting point for all parties when planning and evaluating energy efficiency efforts. –Consistency with DEER measure descriptions.

3 August 18, 2004CALMAC Discussion3 Measure List Initial measure lists will follow the DEER Update Study measure lists –Residential retrofit - weather sensitive and non-weather sensitive. –Non-residential retrofit - weather sensitive and non-weather sensitive. Initial attention should be given to measures likely to represent the bulk of savings from 2006/7 program efforts –Consultant will review 2004/5 measure activity for IOU and non-IOU programs. –Consultant will suggest other measures for initial attention based upon impact of new standards upon likely program offerings. –CFLs (screw-in and modular), programmable thermostats, package and split system air conditioners, T-8 and T-5 lighting systems, clothes washers, dishwashers, pool pumps, and dual pane windows will be among the first measures examined.

4 August 18, 2004CALMAC Discussion4 Issues For Discussion Should focus/scope be broadened beyond residential and commercial retrofit measures? –Industrial? –Commercial new construction? –Residential new construction? Should installation costs be estimated for each measure or for a subset of measures? –Direct install program support. –More accurate cost comparison for individual measures with differing installation costs (e.g., condensing furnaces and water heaters). Necessity of close linkage to DEER update efforts. –Advisory group makeup/requirements.

5 August 18, 2004CALMAC Discussion5 Issues For Discussion (continued) Necessity of direct integration of measure cost information into DEER website. –Might require website redesign. –Updating issues (frequency & timing). How should information from other EM&V studies be integrated? –Existing studies? –Studies in process? –Future studies? Should/can existing studies work scopes be modified to collect measure cost data for direct inclusion into the DEER/Measure cost database?

6 August 18, 2004CALMAC Discussion6 Next Steps Select advisory group members Shahana Samiullah - SCE Andrew Sickles - Sempra Amalia Klinger - PG&E (Project Manager) _____________ - CEC _____________ - Energy Division _____________ - ? Prepare draft scope of work for advisory group review (week of 8/23) Prepare proposal based upon advisory group comments (week of 9/6) Select winning bidder (mid-October)


Download ppt "Statewide Measure Cost Update Overview & Discussion."