1 CITY OF HIALEAH REVERSE OSMOSIS WATER TREATMENT PLANT
United States Conference of Mayors Mayors Water Council 2008 Water Summit Palm Beach, Florida November 19-20, 2008 CITY OF HIALEAH REVERSE OSMOSIS WATER TREATMENT PLANT Honorable Julio Robaina Mayor City of Hialeah, FL Eric Petersen Partner Hawkins Delafield & Wood LLP New York, NY

2 THE HIALEAH REVERSE OSMOSIS WATER TREATMENT PROJECT
Honorable Julio Robaina City of Hialeah, Florida

3 THE PROJECT 10 MGD, Expandable to 17 MGD 14 Wells Brackish Groundwater
Floridan Aquifer

4 DRIVERS Develop Newly Annexed Area
Joint Effort With Miami – Dade County SFWMD Water Supply Policy Alternative to Biscayne Aquifer Top City Priority

5 CITY/COUNTY ROLES Joint Participation Agreement
50-50 Project Ownership City Procures and Contracts Joint Board Oversees

6 FUNDING 50-50 Capital Contribution Bond Financed 50-50 O & M Share
$6 Million State Grant

7 CITY/COUNTY TEAM Mayor – Julio Robaina
Public Works Director – Armando Vidal OMB Director – Alex Vega City Attorney – Bill Grodnick County Liaison – Ralph Terrero

8 CONSULTANT TEAM R.W. Beck – Procurement Parsons – Technical
First Southwest – Financial Hawkins – Legal (Contract) Holland & Knight – Legal (Permitting)

9 PROCUREMENT Request for Expressions of Interest (RFEI) – Issued
Request for Qualifications (RFQ) – Issued Request for Proposals – Planned “Best Value” Proposal Will Be Selected

10 BLUE RIBBON COMMITTEE Five Members from Public Varied Expertise
Evaluates RFQ, RFP Responses Ranks Firms Assists Mayoral Recommendations to Council

11 RFQ RESPONDENT Five Teams Industry Leaders
 Ambient Technologies (Israel)  American Water (US) – Pridesa (Spain)  Befesa (Spain)  Inima (Spain) – AECOM (US)  Veolia (US) – CDM (US)

12 SELECTED FIRMS Highest Ranked by Committee
Mayor Recommended, Council Approved  American – Pridesa  Inima – AECOM  Veolia – CDM

13 STATUS Preliminary Permitting Activity Test Well Drilling Imminent
Pilot Testing Planned RFP Being Developed

14 JPA TIMETABLE RFP Issuance – Spring, 2009 Proposals Due – Summer, 2009
Contractor Selected – Fall, 2009 Construction Commences – Early 2010 Operation Commences – February, 2011

15 WHY DESIGN BUILD OPERATE FOR HIALEAH?
Hawkins Delafield & Wood LLP WHY DESIGN BUILD OPERATE FOR HIALEAH? Eric S. Petersen Partner Hawkins Delafield & Wood LLP New York, NY

16 HAWKINS PERSPECTIVE Public/Private Partnership (P3) transaction attorneys Special Counsel to governmental owners National public contracts and finance firm Work actively with city and county attorneys

17 TRADITIONAL CONTRACTING
Design-Bid-Build Public operations Governmental obligation municipal bonds (revenue or tax secured) Design, construction, operation and financing all separate functions with separate contracts

18 DBO UNIFIES RESPONSIBILITY
Comprehensive asset development and management under a single contract Strong parent company guaranty One contractor deals with all subs and equipment suppliers Avoids the cost and risk of disputes between the designer, builder and operator Easier administration

19 DBO INDUSTRY TRENDLINES
Extensive use in the private sector Cooperation among participants Life-cycle cost perspective Consistent success 5-20% savings against “benchmark” “Faster, better, cheaper” Growing acceptance nationwide

20 DBO ACHIEVES Accelerated project delivery
Cost savings to the City and County Price certainty Guaranteed performance Substantial risk transfer

21 DBO SAVINGS Sources of savings: Preventative v. breakdown maintenance
 Core competency  Competition as to design  Competition as to operation  Cooperative relationship between designer, builder, and operator  Smaller contingency allowances  Bulk consumables buying power  Broader technology access Preventative v. breakdown maintenance Optimized balance between capital and operating costs

22 PERFORMANCE GUARANTEES
Water treatment (quality) Water delivery (quantity) Production efficiency Maximum electricity utilization Price and schedule guarantees Performance incentives

23 RISKS RETAINED BY OWNER
Owner’s risk under any delivery method:  Changes in law  Force majeure  Unusual raw water parameters  Pre-existing site and environmental conditions  Buried infra structure conditions  General price inflation

24 RISK TRANSER Design and construction risks:
 Design liability  Completion risk (delay and efficacy)  Construction cost overruns  Disputes between designer and builder Operation and maintenance risks:  O&M cost overruns  Regulatory compliance  Capital maintenance

25 EARLY PRICE CERTAINTY Traditional DBO
 Owner design costs 8-10% of construction cost  Costs unknown until 100% design  Bidder’s price may exceed engineer’s estimate  Project may be delayed or re-designed DBO  Owner design costs 1-3% of construction cost  Proposers design to level necessary to guarantee price  Owner obtains early price guarantee for low cost

26 CITY RETAINED RIGHTS Ownership of assets
Ownership of water system revenues Setting user rates Capital planning Bond financing (tax-exempt) Securing site and rights-of-ways Obtaining water rights Obtaining grants and subsidies

27 HIALEAH’S SELECTION OF DBO
Clear legal authority (state law, municipal code) No existing water treatment plant workforce Aggressive implementation schedule Life-cycle cost perspective Shifts performance risk Lower NPV cost than traditional contracting Viable in contractor market

28 DB/DBO SUCCESSES - WATER
Seattle, WA (120 mgd) San Diego County Water Authority (100 mgd) Phoenix, AZ (80 mgd) Tampa Bay Surface Water Project (80 mgd) San Juan Capistrano, CA (Desalination) (10 mgd) Santa Fe, NM (15 mgd)

29 INGREDIENTS FOR SUCCESS
Initial strategic planning and development Thoughtful, well developed RFQ/RFP Creative and responsive proposals Clear and comprehensive Service Contract Full proposer due diligence opportunity Fair and balanced risk allocation Outstanding leadership

30 THANK YOU Honorable Julio Robaina Mayor Hialeah, Florida and
Eric Petersen Hawkins Delafield & Wood LLP New York, NY 10005