DEPARTMENT OF CONSTRUCTION AND INFRASTRUCTURE www.nt.gov.au East Arm Port Access Road Stage 2 – Tiger Brennan Drive Extension.

Similar presentations


Presentation on theme: "DEPARTMENT OF CONSTRUCTION AND INFRASTRUCTURE www.nt.gov.au East Arm Port Access Road Stage 2 – Tiger Brennan Drive Extension."— Presentation transcript:

1 DEPARTMENT OF CONSTRUCTION AND INFRASTRUCTURE www.nt.gov.au East Arm Port Access Road Stage 2 – Tiger Brennan Drive Extension

2 www.nt.gov.au DEPARTMENT OF CONSTRUCTION AND INFRASTRUCTURE The project has three major stages: –Stage 1 - Berrimah Road Duplication – Value $10M –Stage 2 - Tiger Brennan Drive Extension -Value $89M –Stage 3 - Berrimah Road Railway Overpass –Value $11M

3 www.nt.gov.au DEPARTMENT OF CONSTRUCTION AND INFRASTRUCTURE The Tiger Brennan Drive Extension:

4 www.nt.gov.au DEPARTMENT OF CONSTRUCTION AND INFRASTRUCTURE The Overpass

5 www.nt.gov.au DEPARTMENT OF CONSTRUCTION AND INFRASTRUCTURE The Interchange This road will improve safety, reduce travelling time and ease traffic congestion for the 36,000 cars travelling between Palmerston, Darwin and the Rural Areas every day. The interchange was also designed and built for the future, so that the 92,500 cars per day predicted for 2031 can travel efficiently.

6 www.nt.gov.au DEPARTMENT OF CONSTRUCTION AND INFRASTRUCTURE Machinery DUMP TRUCKS EXCAVATOR EARTH MOVER ROLLER MULCHER

7 www.nt.gov.au DEPARTMENT OF CONSTRUCTION AND INFRASTRUCTURE The dump trucks are the biggest machinery on this project. They weigh 100tonne when fully loaded – or 75 small cars.

8 www.nt.gov.au DEPARTMENT OF CONSTRUCTION AND INFRASTRUCTURE Roadworks: The construction of the road called for the movement of 600,000 tonnes of dirt.

9 www.nt.gov.au DEPARTMENT OF CONSTRUCTION AND INFRASTRUCTURE Roadworks 600,000 t of dirt = 300,000 Elephants!

10 www.nt.gov.au DEPARTMENT OF CONSTRUCTION AND INFRASTRUCTURE Explosives Overall 73.5 tonnes of explosives were used! The police had to be notified during some of the blasting so that they did not think that it was someone trying to escape from the prison which backs onto the extension of Tiger Brennan Drive.

11 www.nt.gov.au DEPARTMENT OF CONSTRUCTION AND INFRASTRUCTURE What is actually being built? When it has all been completed there will be: Two road overpass bridges A pedestrian and cyclist bridge And also many smaller structures.

12 www.nt.gov.au DEPARTMENT OF CONSTRUCTION AND INFRASTRUCTURE Bridges It takes 1750m 3 Concrete per bridge That’s equal to 25 Swimming Pools

13 www.nt.gov.au DEPARTMENT OF CONSTRUCTION AND INFRASTRUCTURE Stage two of the project which is the Tiger Brennan Extension and the much anticipated overpass; is scheduled for completion by the end of 2010. Completion


Download ppt "DEPARTMENT OF CONSTRUCTION AND INFRASTRUCTURE www.nt.gov.au East Arm Port Access Road Stage 2 – Tiger Brennan Drive Extension."