Presentation is loading. Please wait.

Presentation is loading. Please wait.

Western Shipyard history  Established in 1969  1998 privatized by “Western Invest AS”  2001 privatized by “BLRT Grupp”  2003 restructured into WSY.

Similar presentations


Presentation on theme: "Western Shipyard history  Established in 1969  1998 privatized by “Western Invest AS”  2001 privatized by “BLRT Grupp”  2003 restructured into WSY."— Presentation transcript:

1

2 Western Shipyard history  Established in 1969  1998 privatized by “Western Invest AS”  2001 privatized by “BLRT Grupp”  2003 restructured into WSY company group with 22 companies within it Western Shipyard shareholders “BLRT Grupp” (65 companies) the biggest of them: “Tallin Shipyard” “Turku Shipyard” “Western Shipyard”

3 Western Shipyard strategic activity  Ship building  Ship repair and conversion  Metal construction production  Stevedoring  Metal processing  Hot galvanization  Logistic and expedition  Cargo terminals  Technical supply and etc. About Western Shipyard  50 ha area  2200 m pier line  5 floating docks  100.000 sq/m open storage facilities  Own personnel about 1400  Subcontractor’s personnel over 1000

4 Western Shipyard staff dynamics 2005 – 2009

5 Western Shipyard turnover 2005 – 2009, thousand EUR

6 Western Shipyard market 2009, thousand EUR

7 Western Shipyard investments 2006 – 2010, thousand EUR

8 YOUR PARTNER IN: YOUR PARTNER IN:  WIND OFFSHORE PROJECTS FOR NEWBUILDINGS NEWBUILDINGS SHIPS’ UPGRADES SHIPS’ UPGRADES ANY STEEL SOLUTIONS ANY STEEL SOLUTIONS  FERRIES  MULTIPURPOSE CARGO subsidiary More than 40 unique shipbuilding projects over 10 years!

9 Western Shipbuilding Yard turnover 2005 – 2009, thousand EUR

10 Western Shipbuilding Yard turnover 2005 – 2009, thousand tons

11 JACK UP VESSEL “WIND LIFT 1” Technical Data Length 103,8 m Breadth 36,0 m Draught 3,5 m Length of legs 72 m Weight 8000 t Speed 10,1 knots Main engine 4 x 1665 kW Thruster 4 x 1100 kW Heavy-lift crane, main 500 t Accommodation 50

12 JACK UP VESSEL “WIND LIFT 1”

13 JACK UP BARGE “ODIN” Technical Data Length46,10 m Breadth 30,0 m Depth4,6 m Length of legs60 m Power supply 4 x 355 kW (diesel/hydraulical) 1 x 355 kW (diesel/electrical) 1 x 150 kW (diesel/electrical) Heavy-lift crane, main300 t Accommodation40

14 BARD OFFSHORE 1 400 MW SUBSTATION Technical Data Length42,10 m Breadth42 m Depth from tank top to main deck 5,45 m Weight3000 t Main transformers2 x 200 MW Crane20 t Accomodation40 persons

15 “MUHUMAA” Technical Data Length all over97,90 m Length, car deck90,00 m Breadth 18,50 m Depht, main deck5,7 m Draught4,0 m Car unitsapprox 150 pcs. Trailers12 pcs. Passengers600 Deadweight800 t Weight 1945 t Average speed15,0 knots Engines2 x 6L20 (MCR 1200 kW) 2 x 8L20 (MCR 1600 kW) ThrusterContaz25 - 3.0 MW Crew, service and catering19

16 “SKARVEN” Technical Data Length all over65,40 m Breadth 13,00 m Draught4,1 m Car unitsapprox 60 pcs. Passengers250 Average speed13,5 knots Engines2 x 1800 kW Crew, service and catering4

17 “PATOREAL” Technical Data Length all over70,00 m Breadth 13,00 m Car unitsapprox 60 pcs. Passengers500

18

19 Business trends:  Shipbuilding for offshore business;  Special purpose shipbuilding;  Construction of car and passenger ferries;  Building of floating platforms, water devices, pontoons;  Production of oversize, technologically complex metal constructions;  Construction of ship sections;  Hydraulic engineering, production of equipment;  Technologically complex ship modernization.

20  Ship repair  Ship conversion  Ship building

21 Western Shiprepair Yard turnover 2005 – 2009, thousand EUR

22 Western Shiprepair Yard ship repair by vessel classes 2009, %

23 Western Shiprepair Yard market 2009, %

24 Floating docks

25 “THORSHOVDI” Technical Data Length 132,20 m Breadth 19,87 m Depth 9,65 m Draught 7,05 m Max speed 14,0 knots Main engine 3960 kW Auxiliary engines 2 x 1360 kW, 2 x 1825 kW Deadweight 7700 t Accomodation 55 persons

26 “DP FALCON” Technical Data Length 69,77 m Breadth 15,08 m Depth 8,05 m Max speed 14,0 knots Main engine 2 x 3200 kW Electric power 5912 kW Gross tonnage 2730 Accomodation 62 persons

27 “MIKAL WITH” Technical Data Length 55,38 m Breadth 13,03 m Draught 4,7 m Max speed 12,0 knots Main engine 1200 kW Thruster 300 kW Deadweight 1200 t Accomodation 6 persons

28 “SENTINEL” Technical Data Length 61,00 m Breadth 13,50 m Max speed 14,0 knots

29 Metal processing (metal processing complex is the biggest one in the Baltic States):  Painting 150.000 sq/m  Cutting 30.000 ton

30  Naval architecture services  Hull classification drawings  Block assembling and building strategy drawings  Services of civil construction design

31  Metal constructions production  Mechanical processing of metal  Machinery parts and devices production

32  Bio-diesel loading  Bio-fuel loading  Bulk cargo loading  General cargo loading  Reloading of oversized cargo and etc.

33 Liquid cargo terminal 4.000 cubic m. Capacity per year – 100.000 ton Bulk cargo terminal Capacity - 20.000 ton

34  Hot dip galvanizing plant in Vilnius is the biggest one in the Baltic States  Over 6,9 m. EUR investments per 2008  Productivity: 25.000 ton/year

35 Minijos str. 180, LT-93269 Klaipeda, LITHUANIA Tel.: + 370 46 483600 / 483727 /483764 Fax: + 370 46 483607 E-mail: wsy@wsy.lt; newbuilding@wsy.lt; marketing@wsy.ltwsy@wsy.ltnewbuilding@wsy.lt marketing@wsy.lt www.wsy.lt …from design to turn key… You are welcome to join our customers board!


Download ppt "Western Shipyard history  Established in 1969  1998 privatized by “Western Invest AS”  2001 privatized by “BLRT Grupp”  2003 restructured into WSY."

Similar presentations


Ads by Google