1 1 [12-Feb-2014] «BE-RF-PM» CLIC TBM Prototype T0@CLEX Status update EDMS №[Number] Dmitry Gudkov 1

2 2 [12-Feb-2014] [CMWG Meeting] «BE-RF-PM» CONTENTS 2 TBM integration in CLEX Supporting system CLEX room in LAB-169. Status of the room preparation Preliminary planning for the TBM installation in CLEX

3 3 [12-Feb-2014] [CMWG Meeting] «BE-RF-PM» TBM Integration of the in CLEX 3 The integration is under way, but.. DB optics configuration has been changed (new input received from Jakob) Jakob Esberg The new study is needed in order to check: If new positions of the components in CLEX can be applied Components supporting girder, study is needed.

4 4 [12-Feb-2014] [CMWG Meeting] «BE-RF-PM» Supporting system status 4 All 4 girders have been controlled by metrology The cradles have been controlled by metrology Results (axis straightness) MBO-2 :0.010 mm MBO-1 :0.014 mm DBO-1 :0.012 mm DBO-2 :0.012 mm ZTS visit for installation of the equipment is confirmed: 24.02 – 28.02 report is under preparation We are waiting for the detailed visit program from ZTS. CLEX room in the LAB-169 is under preparation See next slides

5 5 [12-Feb-2014] [CMWG Meeting] «BE-RF-PM» CLEX room in LAB-169. Status of the room preparation The floor drilling is finished Threaded inserts are installed The location of the racks is defined OPEN POINTS: Acquisition and control needs? Electricity Internet Temperature in the LAB (18-28 deg.) Is everything ready? (SU) RACKS

6 6 [12-Feb-2014] [CMWG Meeting] «BE-RF-PM» Lab 169/S-039: Implantation drawing 6 Espace réservé pour manutention

7 Perçage et installation des chevilles diamètre 20 et 16mm après le tracé du positionnement des supports par les géomètres 40 trous OK Le lab. CLEX est prêt pour l’installation des supports P. de Souza, S. Lebet

8 Planéité des supports métrologique ??? Rectitude environ 15mm P. de Souza, S. Lebet

9 9 [12-Feb-2014] [CMWG Meeting] «BE-RF-PM» Preliminary planning for the TBM installation in CLEX 9