CEMEX REDWOOD CITY CEMENT TERMINAL EQUIPMENT UPGRADE & MODIFICATION PROJECT.

Similar presentations


Presentation on theme: "CEMEX REDWOOD CITY CEMENT TERMINAL EQUIPMENT UPGRADE & MODIFICATION PROJECT."— Presentation transcript:

1 CEMEX REDWOOD CITY CEMENT TERMINAL EQUIPMENT UPGRADE & MODIFICATION PROJECT

2  RMC Pacific Materials Purchased The Terminal From Ideal Cement  March 1, 2005 – CEMEX Officially Purchased RMC  Standard Procedure During An Acquisition Includes Formation Of A Post Merger Integration (PMI) Team Evaluation Of Facility Operations And Procedures & Recommendations To Bring Facility In Compliance With CEMEX Standards  Improve Operations, Safety, Environmental And Community Service  Improve Customer Service.

3 CEMEX REDWOOD CITY CEMENT TERMINAL UPGRADE OBJECTIVES  Convert Storage Silo Dedicated For Fly Ash To Cement  Truck Load-Out System Upgrade And Improvement Upgrade Existing Truck Loading System With Up To Date Equipment And Add An Additional Load-out Spout That Will Expedite Load Times By Half; Install A Second Two Spout Truck Loading System; & Centralize Nearly All Of The Cement Storage And Loading To One Vicinity Of The Terminal That Is Away From The Pacific Shores Complex.

4 CURRENT TERMINAL ENTERANCE & TRAFFIC PATTERN

5 Stockhouse D Current Loadout Phase 1 Loadout System Phase 2 Loadout System PROJECT OVERVIEW

6 PROPOSED TRAFFIC PATTERN & LOADING SYSTEM LOCATIONS New Traffic Pattern Phase 2 Loadout System Phase 1 Loadout System

7 Artist conception of Phase 1 Modification Modern 2 Nozzle Loadout System Replaces Single Nozzle system PROPOSED IMPROVEMENT

8 Artist conception of Phase 1 & 2 Modifications Viewed Facing The New Phase 2 Loadout System Phase 2 Phase 1

9 PROPOSED IMPROVEMENT (cont.)  Move Truck Loading From The Small Bulk Tanks To Stock House – D;  Utilize Four Storage Silos In Stock House – D As Both Storage And Load-Out;  Replacing Inventory From Adjacent Silos Reduces Time Required To Re-fill System;  Reduce Energy Consumption And Operating Cost;  Reduce Truck Loading And Waiting Time;  Installation Of Modern Equipment Minimizes Emissions;

10 PROPOSED IMPROVEMENTS (cont.)  Minimizes The Number Of Trucks Waiting On Seaport Blvd. Which Would Move Cement Trucks Inside The Terminal;  Moves A Majority Of The Truck Loading Operations Away From Property Line Adjacent To Pacific Shores;  Centralize Cement Storage – Minimize Transfer Of Cement From Stock House – D To Small Bulk Tanks  Pave Roads Minimize Fugitive Dust During The Dry Season Minimize Mud Track Out During Wet Weather Season

11 Any Questions?