Presentation is loading. Please wait.

Presentation is loading. Please wait.

Timeline 200520062007200820092010 Steering Committee Working Groups Site Visits GFA Demo Local Software Recommended Software Developed Funding not approved.

Similar presentations


Presentation on theme: "Timeline 200520062007200820092010 Steering Committee Working Groups Site Visits GFA Demo Local Software Recommended Software Developed Funding not approved."— Presentation transcript:

1

2

3 Timeline 200520062007200820092010 Steering Committee Working Groups Site Visits GFA Demo Local Software Recommended Software Developed Funding not approved Flood Budget Crisis  Funding definitely approved  Funding not approved  FEMA may provide funds  FEMA will provide funds  FEMA will provide funds … IF Rumors FEMA Move Scan

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19 Shelf Barcode Item Barcodes Formatted to process one item at a time

20

21

22

23 Get Current Sublibrary/Collection and HOL using SQL Update Items: Translate to new Sublib/Location using mapping table Update Item with SQL Update HOL Output Aleph Sequential from key list (p_print_03) Translate to new Sublib/Loc using mapping table Update using Aleph Utility (p_manage_18)

24

25

26

27

28

29

30

31

32

33

34

35

36 MASTC 14 MASTC 14 MASTU 126 MASTU 126 MPSTC 1 MPSTC 1 MSRVC 97 MSRVC 97 MUSTC 1 MUSTC 1 PHSTC 78 PHSTC 78 PHSTU 119 PHSTU 119 PSSTC 38 PSSTC 38 PSSTU 385 PSSTU 385 SPECC 7 SPECC 7 SPECU 3 SPECU 3 STORC 1117 STORC 1117 STORU 15 STORU 15

37

38


Download ppt "Timeline 200520062007200820092010 Steering Committee Working Groups Site Visits GFA Demo Local Software Recommended Software Developed Funding not approved."

Similar presentations


Ads by Google