Presentation is loading. Please wait.

Presentation is loading. Please wait.

Elementary School #33. Board approval in 2006 Funding 2002 Bond 2005 Bond Location Camino A Lago Meadows.

Similar presentations


Presentation on theme: "Elementary School #33. Board approval in 2006 Funding 2002 Bond 2005 Bond Location Camino A Lago Meadows."— Presentation transcript:

1 Elementary School #33

2 Board approval in 2006 Funding 2002 Bond 2005 Bond Location Camino A Lago Meadows

3 Opening Date – 2014 versus 2015 2014 Opening Considerations Construction costs Committee support Enrollment stabilization Challenges Alternate location Budgeting considerations New Request For Proposal (RFP) requirements for Construction Manager (CM) at Risk Compressed timeline

4 Opening Date – 2014 versus 2015 2015 Opening Considerations More time for review and development of school design More time to ready fixtures and furnishings upon completion Challenges More than one move for some students

5 Design Options Proceed with 2008 design Review prototypes from approved architects Design committee to work with architect to develop site plans and make recommendations to Board

6 Questions?


Download ppt "Elementary School #33. Board approval in 2006 Funding 2002 Bond 2005 Bond Location Camino A Lago Meadows."

Similar presentations


Ads by Google