M Flughafen München GmbH, Servicebereich IT, 13.03.2007 Information for ACI Workgroup IT Timeframe: Airport: Date: – November 2007 München 12.12.2007 Madrid.

Similar presentations


Presentation on theme: "M Flughafen München GmbH, Servicebereich IT, 13.03.2007 Information for ACI Workgroup IT Timeframe: Airport: Date: – November 2007 München 12.12.2007 Madrid."— Presentation transcript:

1 m Flughafen München GmbH, Servicebereich IT, 13.03.2007 Information for ACI Workgroup IT Timeframe: Airport: Date: – November 2007 München 12.12.2007 Madrid

2 m Flughafen München GmbH, Servicebereich IT, 13.03.2007 Overall Airport Figures - 11/2007 Timeframe: High Pax increasement Project 3rd Runway New Freight Forwarders Building opened 11/2007. New 3 star Hotel (Building works started 11/2007). „Best Airport in Europe“ and rank 4 worldwide (Skytrax 2007). Pax [Mio. Pax] Revenue [Mio. €] Qualitative 2007 act./act. 2006: +10,7% YTD: 31,5 Plan YE: 32,5 FC YE: 34,2 YTD: 700,9 Plan YE: 741 FC YE: >750

3 m Flughafen München GmbH, Servicebereich IT, 13.03.2007 3. Runway

4 m Flughafen München GmbH, Servicebereich IT, 13.03.2007 New Freight Forwarder Building

5 m Flughafen München GmbH, Servicebereich IT, 13.03.2007 Service Division IT Organisation change (split of service field “Operation” into “Operation & Service” and “IT Engineering”) New business unit for IT Consulting (focus on external market) 2nd ISO 20000 Audit (06/2007). Product management established. Heavy price pressure from airlines (special LH) IT-Cost / FMG-Revenue [%] YTD: 3,0% Plan YE: 3,3% FC YE: 3,2% Qualitative - 10/2007 Timeframe:

6 m Flughafen München GmbH, Servicebereich IT, 13.03.2007 APM (Airport Process Management Suite): New Application Framework for traffic related applications APM RealTime : localization and status information for 600 Apron vehicles (Ressource and process optimization); Implementation finished by year end; CDM: Collaborative Decision Making (together with ATC, Airline, Airport and Eurocontrol SAP RE/FX: Implementation finished by 01/2008 Upgrade to SAP ERP 2005: done in 06/2007 Identity Management: Pre Study finished, Product Evaluation, Implementation with single sign on and 2 factor authentication in 2008 Office 2007: Implementation and Migration concept in work; start of operation planned for Q3/2008 LH-Wartelistenanzeige am Gate flächendeckend umgesetzt Document Management System: System ELO in implementation Application and system projects - 11/2007 Timeframe: Service Division IT

7 m Flughafen München GmbH, Servicebereich IT, 13.03.2007 A irport P rocess M anagement Suite The modular solution for complete airport management and control APM

8 m Flughafen München GmbH, Servicebereich IT, 13.03.2007 APM Service Bus CORBA, XML APM Real Time APM Access APM Base Data Store APM Ground Control APM Recon APM Bag Control APM Planning APM Apron Control APM Terminal Control APM Gate Control APM Hub Control APM Airport CDM APM Service Bus CORBA, XML APM Real Time APM Access APM Base Data Store APM Access APM Base Data Store APM Ground Control APM Recon APM Bag Control APM Planning APM Apron Control APM Terminal Control APM Gate Control APM Hub Control APM Airport CDM APM Architecture Voice Video Location A irport P rocess M anagement Suite Integration of real time information

9 m Flughafen München GmbH, Servicebereich IT, 13.03.2007 UDS (Universal Display System): Migration to new platform with functional enhancements Voice-Communication: Pilot for VoIP with Alcatel implemented (~ 200 Users); Start of added value applications in 12/2007 (Web-CTI, Collaboration) Multilateration / sensor data fusion: localization of aircrafts; joined project with DFS; Status: Implementation with ERA Digital Trunk Radio: Motorola Dimetra (Tetra) is in operation; Rollout of handsets - Q2/2008 WLAN: Upgrade of WLAN Access Points to CISCO Airspace done Storage: Migration to new storage technology done in Q2/2007 (EMC 2 ) CCTV: RFP started in 12/2007 Operation & Service / IT Infrastructure Engineering - 11/2007 Timeframe: Service Division IT


Download ppt "M Flughafen München GmbH, Servicebereich IT, 13.03.2007 Information for ACI Workgroup IT Timeframe: Airport: Date: – November 2007 München 12.12.2007 Madrid."