Presentation is loading. Please wait.

Presentation is loading. Please wait.

National Food Security Mission Uttarakhand 11 th Meeting of NFSM-EC Dated 15 Jan 2013,Time 3-30 P.M. Venue: Krishi Bhawan, NEW DELHI.

Similar presentations


Presentation on theme: "National Food Security Mission Uttarakhand 11 th Meeting of NFSM-EC Dated 15 Jan 2013,Time 3-30 P.M. Venue: Krishi Bhawan, NEW DELHI."— Presentation transcript:

1 National Food Security Mission Uttarakhand 11 th Meeting of NFSM-EC Dated 15 Jan 2013,Time 3-30 P.M. Venue: Krishi Bhawan, NEW DELHI

2 Land Use pattern in Uttarakhand Total Reported Area – 56.72 Lakh ha.

3 Land Use Statistics Year: 2009-10 S.No.Contents Area (in ha) HillPlainTotal 1 Total Geographical Area 46035744853483 Total Reported Area NA 5672378 2Forests NA 3484803 3Barren and Unculturable lands 2186915812224503 4Land put to non-agriculture use 13413682398216534 5Culturable waste 29855410912309466 6 Permanent pastures & other grazing lands 198278459198737 7 Land under misc. trees crops not included in area sown 3781705257383427 8Current fallows 201001390934009 9Other fallow lands 658361439980235 10Net Area Sown 422453318646741099

4 Sl;.No. Particulars Area (ha) HillPlainTotal 11Area Sown more than Once 210492214789425281 12Gross Cropped Area 6329455334351166380 (i) Kharif 390883284909675792 (ii) Rabi 241933213148455081 (iii) Zaid 1293463334762 (iv) Area prepared for Sugarcane 0745 Total Cropped Area 6592235292391188462 13Cropping Intensity (in %) 149.83167.41157.39

5 Crop wise comparative productivity….quintal/ha Crops2006-072007-082008-092009-102010-112011-122012-13 Kharif Rice19.7420.1419.1720.2418.2020.5720.89 Maize13.2015.5913.5513.6115.0214.6513.98 Mandua13.6214.0514.3812.3613.3113.9213.38 Sawan12.6012.8812.8210.5512.9413.2813.39 Ramdana2.943.384.714.564.844.985.70 Other cereals4.514.034.043.794.144.565.24 Kharif cereals16.6017.0816.6416.3715.8717.3317.30 Arhar5.457.587.187.106.887.217.99 Urd6.427.697.347.607.958.187.58 Horse gram7.086.877.786.198.178.047.94 Black Bhatt6.697.337.368.948.989.8310.14 Other pulses6.727.87 9.259.496.966.29 Kharif pulses6.657.707.507.648.348.538.35 Kharif foodgrain 15.9716.4416.0315.7715.3516.6816.56

6 Crop wise comparative productivity….quintal/ha Crops2006-072007-082008-092009-102010-112011-122012-13 Rabi Wheat21.0821.4020.3421.4223.1523.7924.66 Barley11.5010.478.5611.1512.5312.5012.80 Rabi cereals20.4820.7019.6520.8422.5223.1423.93 Gram7.696.874.776.677.85 9.38 Pea9.809.014.289.8010.469.6510.29 Lentil4.614.553.635.837.408.318.76 Rabi pulses6.155.783.847.048.808.569.04 Rabi foodgrain19.8520.1319.0620.2521.7722.5623.10 Total foodgrain kharif+rabi 17.8118.2817.5517.9218.4119.4419.61

7 Crop wise production estimates 2012-13….lakh m.t. CropsAs per crop cutting experiments As per state’s own assessments Rice (kharif)5.40 Maize0.39 Mandua1.72 Sawan0.91 Ramdana0.03 Other Kharif cereals0.01 Khrif Pulses0.37 Kharif foodgrain8.83 Wheat9.10 Barley0.31 Rabi pulses0.21 Rabi foodgrain9.62 Total foodgrain (kharif+rabi)18.92

8 Financial Statement (NFSM) 2012-13 Amount in Lakh Rs. As on 31.12.2012 Sl No ComponentsTarget Approved by GoI Released by GoI Revalidation for 2012-13 Total Available Amount for 2012-13 Expenditure Till 31 Dec. 2012 (%)(%) 1Rice1243.631425.00- 505.6535 2Wheat948.46200.00- 82.2541 Total2192.091625.00- 587.9036

9 Financial Statement under NFSM ------Rs in lakh Crop/ Components Expenditure as on 31-12-2012 Likely expenditure during 2012-13 Requirement of funds, if any NFSM-Rice505.65900.00 Nil NFSM-Wheat82.25948.46 Under this component Rs 200 lakh is already released. Rs 525 lakh savings of NFSM –rice are available. which is proposed to be utilized under this component. TOTAL587.901848.46

10 Progress of NFSM-Rice (2012-13) ActivityPhysicalFinancial UnitTargetAchievementAllocationExpenditure 1 Cluster Demonstrations - - (a) Direct Seeded Rice / Line Transplanting / SRI ha.2550 191.2569.95 (b) Hybrid Riceha.6008245.003.35 Sub Total 31502632 236.2573.50 2 Seed Distribution (a) Hybrid Rice Seedqtl.100--- 2.00--- (b) HYV Seedqtl.10005995.003.00 Sub Total 11005997.003.00 3 Plant and Soil Protection Management (a) Micro Nutrientsha.3800032118190.0063.89 (b) Plan Protection Chemicalsha.3000021756150.0029.02 Sub Total 6800053874340.0092.91

11 ActivityPhysicalFinancial UnitTargetAchievementAllocationExpenditure 4 Resource conservation techniques (a) Knapsack SprayerNo.240088972.006.81 (b) Zero till Seed DrillNo.750156112.5023.40 (c) Multi Crop PlantersNo.15--- 2.25--- (d) Seed DrillsNo.302 4.50--- (e) Power WeedersNo.100915.001.65 (f) Zero till Multi Crop PlantersNo.20--- 3.00--- (g) Ridge Furrow PlantersNo.10--- 1.50--- (h) RotavatorsNo.802688240.60206.40 (i) Laser Land LevelersNo.252837.5042.00 Sub total 4No.41521772488.85280.26 5 Incentive for Pump Sets No.190 88 19.00 8.74 6 Cropping System Based TrainingNo.49306.863.34 7 (a) PMT at district level031.801.90 (b) PMT at State level013.87--- 8 Local Initiative (Water Harvesting Structures) No.---60100.0042.00 Total Rice programme1243.63505.65

12 Progress of NFSM-Wheat (2012- 13) ActivityPhysicalFinancial UnitTargetAchiev.AllocationExpen. 1 Cluster Demonstrationsha.16001500200.0021.85 2 Distri. of Certified seedq200001103100.005.20 3 Plant and soil managementha680000340.000 4 Distribution of Implements (a) Knapsack SprayerNo.16000480 (b) Zero till Seed DrillNo.3505.250 (c) RotavatorsNo.2006.000 (d) Laser Land LevelersNo.101.500 (e) Pump setsNo.165016.500 5 TrainingsNo.4506.300 6 (a) PMT at district level51.040.20 (b) PMT at State level13.870 7 Water HarvestingNo.160.0055.00 Total Wheat 948.4682.25

13 Major focus given by the States This is the first year (2012-13) of initiating of the NFSM programme in the State. Kharif programmes could not be managed properly as the approval of the programme was received after sowing of rice in hilly areas, even this, the following steps have been taken to accelerate the production programme. Training and awareness campaigning from State to Nyaya Panchayat level. Cluster demonstrations. Hybrid rice demo in 82 ha. Promotion of use of Laser land levelers (distribution of 28 out of 25). Soil Health Management with area coverage of 32 thousand ha under micro nutrients. Surveillance of pest and diseases on crops with area coverage 21 thousand ha under Plant Protection measures.

14 Machinery Distribution- Distt. US Nagar

15 Cluster Demonstration- NFSM Rice, Distt. Udham Singh Nagar

16 Cluster Demonstration- NFSM Rice, Distt. Almora

17 Distribution of Laser Leveller under NFSM, Distt. Haridwar

18 Cluster Demonstration (Hybrid Rice 6444), Village- Lal Chandwala, Disrict Haridwar 18DISTRICT HARIDWAR

19 19 Cluster Demonstraion of Rice: Inspection by GoI Team at Village- Mundlana, Block- Narson, Haridwar

20 20 Cluster Demonstration of Hybrid Rice (PA-6444): Inspection by National Monitor Team, GoI at Village- Gaindikhata, Block- Bahadrabad, Haridwar

21 21 Cluster Demonstration of Narendra-359: Inspection by National Monitor Team, GoI at Village- Tatwala, Block- Bahadrabad, Haridwar

22 22 Training under NFSM: GOI Officers also Participated at Village- Alabalpur, Block- Laksar, Haridwar

23 Power Weeder Distribution: 1. Sh. Rajendra Singh, Village- Badgaon, Block- Takula, Almora 2. Sh. Narayan Singh, Village-Byalkhalsa, Block- Takula, Almora 3. Sh. Manoj Rautela, Village- Kharhisunar, Block- Takula, Almora

24 Application of Micro-Nutrients in Block Chaukhutia, Almora Cluster Demonstrations in Block Chaukhutia, Almora

25

26 A3P Programme under NFSM Programme is not approved for Uttarakhand. Physical and financial progress under 19+ million tons pulse programme. Only Rs 3. lakh are allotted for micro irrigation. This component is already under the National Mission on Micro Irrigation

27 Component Sanctioned Post In Position Remark Consul- tants TA Consul- tants TA Rice520-- Appointments could not be materialized because of non availbility of qualified persons on the prescribed honorarium. Wheat832-- Total1352-- In the meeting of State level NFSM-EC, it is decided to appoint students of Agriculture Universities as internship. Appointment of Project Management Team (PMT) in Districts

28 Concurrent Evaluation of NFSM Being the first year of the programme, concurrent evaluation work is not yet undertaken. Status of online submission of progress Report at State/District level Being the first year of the programme, online reporting is yet to start.

29  Savings of NFSM- rice is proposed for NFSM- Wheat.  Sowing of rice in hilly area of Uttarakhand starts from Mid March therefore, approval on the Work Plan is required in Feb for 2013-14 so that programme may be initiated well in time.  In case of hybrid rice clusters demonstration, the norms of the activities are same as for HYVs while the hybrid seed is much costlier than HYV seed. In this case a major portion of the investment will go to cost of seed.  Cost of Hybrid seed of rice is very high, assistance on seed subsidy is proposed @ 50% of the cost of hybrid seed.  Under the programme “Implementation of Special Plan to achieve 19+ million tones of pulse production during kharif 2012-13” only drip irrigation/sprinkler programme is approved for the State. Other activities in A3P should be considered for 2013-14. Specific Issues and suggestions

30  Uttarakhand is a hilly state and specially in hilly districts area under wheat and rice crop is less than 15000 ha as norms set under NFSM. Relaxation is required in crop coverage area norms from 15000 ha to 10000 ha.  Relaxation is required in basic qualifications and experience of technical consultants for deployment under the Project Management Team. Issues

31 Brief Overview of NFSM  SAP has already been prepared on the basis of Comprehensive District Agriculture Plan (C-DAP)  State and District level NFSM executive committees are organized for monitoring and review of the Scheme.  NFSM-Rice component : Identified district-5 (Haridwar, Pauri, USNagar, Almora & Pithoragarh) and the total cost of the NFSM – Rice is 1243.63 Lakhs.  NFSM–Wheat Component : Identified districts 8 (Haridwar, Dehradun, Pauri, Tehri, USNagar, Almora, Pithoragarh, & Nainital) and the total cost of the NFSM – Wheat is Rs. 948.46 Lakh.

32 Thanks


Download ppt "National Food Security Mission Uttarakhand 11 th Meeting of NFSM-EC Dated 15 Jan 2013,Time 3-30 P.M. Venue: Krishi Bhawan, NEW DELHI."

Similar presentations


Ads by Google