Download presentation
Presentation is loading. Please wait.
Published byEduardo Redgate Modified over 9 years ago
1
1 Contracting in Cambodia Maryam Bigdeli WHO Cambodia
2
2 Cambodia at a glance Population – 14 million (2008) – 80% rural Administration 24 provinces; 77 operational health districts District hospitals and health centers, national generalist and specialized hospitals in Phnom Penh GDP/capitaUS$635 (2008) Poverty rate31% (2008) MMR472 (CDHS 2005) U5MR66 (CDHS 2005) IMR 83 (CDHS 2005) THE per capita US$40 (2008) OOPUS$24 (CDHS 2005) GovernmentUS$8 (2008) External assistanceUSD$8 (2008)
3
3 Historical view of contracting Phase 1 – Pilot: 1999-2003 - “New Deal” Phase 2 – Contracting with NGOs: 2004-2007 (2008) - BTC supported PB Incentives: 2004-2008 Phase 3 – Contracting within the Public Administration: Special Operating Agencies 2009-
4
4 Contracting Phase 1 – 1999-2003 Context Decades of conflict resulting in a destruction of the health system Reconstruction: design of a health coverage plan, funding through an ADB loan Contracting experience Opportunity to test feasibility and effectiveness of contracting with NGOs Pilot experiment (8 ODs) Results Both models of NGO contracting proven effective CO more effective but also more expensive and estimated less sustainable Ref: Loevinsohn 2005, Bhushan 2002 and 2007, Bloom 2003 ODMgt RespStaffPerformanceIncentive Contracting –out (CO) 3NGOContracted HSD indicators Basic staff performance Salaries Contracting-in (CI)2NGO within MOH system Civil servants Salary supplements Revenue from UF Controls (note: input same level of donor funds) 3DHMTCivil servants Salary supplements Revenue from UF
5
5 Contracting Phase 2 – 2004-2007 (2008) Context Health Sector Support Project 1: WB-UNFPA-DFID-ADB Design 11 ODs were contracted to 7 NGOs through competitive bids No standardized implementation arrangements: Each contractor free to design and operate scheme as suited their local context Performance could be either staff based or facility based Remuneration and incentive left at the discretion of contractor
6
6 MOH NGO PMU OD PHD MOEF Monitoring Contract Accelerated Disbursement of Government budget HSSP1 Donors Health service delivery through health centers And district referral hospitals MG Quarterly disbursements User Fees
7
7 Contracting Phase 2 – 2004-2007 (2008) Performance monitoring (1) Central and provincial level monitoring Assessing performance of the contractor Site visits HH visits in 2 villages per quarter Authorizing quarterly release Contractor monitoring Monthly visits to facilities Verification of staff performance Performance indicators (district specific targets) ANC 2 coverage Delivery by trained staff Delivery at facility Full immunization Vitamine A Use of modern birth spacing method Utilization of curative services BF within 2 hours after birth / collostrum feeding Exclusive breastfeeding Number of contacts per year 9/11 ODs increased access for the poor 7/11 ODs reached all their targets -1 OD did not reach ANC target -1 OD did not reach BS target -1 OD missed 3 targets (BS, EPI, contact) -1 OD missed 4 targets (idem+VitA) Central level monitoring stopped 2005 Only contractor monitoring Ref.1) Cambodia health services contracting review, 2007 – 2) Final evaluation of contractors’ performance, 2009
8
8 Contracting Phase 2 – 2004-2007 (2008) Performance monitoring (2) Eg. Staff performance assessment AR- Peer evaluation, average scores, feedback K- Supervisor evaluation and scoring, no feedback Eg. HC visits AR- OK K- too many HC for 1 Vice-director, other V-D post vacant, group meetings for problem solving not conducted Ref. Keller, Thome, Dekestier Contracting of Health Services AR & K OD, Takeo Province- Final Evaluation Report Apr2008 No thorough documentation from all NGOs Only 1 OD developed a comprehensive exit strategy Each contractor had their own staff performance, incentive and penalty system Contract termination in case of dual private practice: Ban on private practice has been loosely interpreted and in many cases completely ignored Sanctions according to MOH/civil service disciplinary measures: Lack of appropriate follow-up by PHD Promotion of poor performers to other positions outside contracting arrangements No provision for contractor-PHD relationship No Monitoring of PHD oversight OD management capacity developed to various degrees
9
9 Contracting Phase 2 – 2004-2007 (2008) Staff remuneration and incentive Sources of funding for 2 ODs in Takeo 48 % government budget 29% Project budget 13% SRC counterpart funds 10% User fees Government budget: salaries and allowances Project budget (ADB financed loan): performance incentives NGO counterpart funds User fees: 50% and later 60% of revenues from UF redistributed as incentives to staff Other incentives unrelated to contracting arrangements: GFATM GAVI Midwifery Staff income 20% 40% Ref. Keller, Thome, Dekestier Contracting of Health Services AR & K OD, Takeo Province- Final Evaluation Report Apr2008
10
10 Contracting Phase 3 – 2009- Context Health Sector support Project 2: pooled funds from 7 donors WB-DFID-AUSAID-UNFPA-UNICEF-AFB-BTC Willingness of MOH to regain ownership on contracting arrangements Special Operating Agencies: A general reform of the public service delivery: Royal Decree NS/RKT/0308/346 on “The common principles of establishing and functioning Special Operating Agency”-2008 Improve quality and delivery of public services Change attitude and behaviour of civil servants Enhance management through results Develop capacity for service delivery MOH requested to adapt the SOA concept to the Health Sector MOH SOA Manual 2009
11
11 Contracting Phase 3 – 2009- Design SOAs: Health SOAs nominated by decree Provincial Referral Hospitals, Operational Districts Eligibility Capacity assessment Readiness criteria Provincial Health Departments become Commissioners of contracts Funding for SOAs can come from various sources: Service Delivery Grants (HSSP2), government budget, user fees, other
12
12 MOH NGO PMU OD PHD MOEF Monitoring Service delivery management contracts Government Budget – no Preferential Disbursement mechanism HSSP2 Donors Health service delivery through health centers And district referral hospitals MG Performance agreement Contracts for capacity building Service Delivery Grants Other External Funds?
13
13 Contracting Phase 3 – 2009- Capacity assessment / readiness criteria Capacity assessment tool for PHDs and ODs I.Planning II.Monitoring and supervision III.HR allocation and management IV.Technical support V.ED management VI.Financial management VII.Coordination Readiness criteria: 75% 60% score would need a phased capacity building NGOs contracted for 1 year for capacity development In practice The 11 contracted districts under Phase 2 were always meant to become SOAs regardless of their capacity assessment scores PHDs in these areas only remotely involved Example PHDs Domain II: average score 34% Domain I: average score 59% Example ODs Domain I: average score 37% None reach 75% Only 3 reach 60% Domain II: average score 44% None reach 75% Only 3 reach 60% Ref. OPM Summary report and analysis, PHD and OD Capacity Development Assessment, 2008
14
14 Contracting Phase 3 – 2009- Performance monitoring Service delivery targets included in service delivery contracts I.Service outputs II.Quality of care III.Organization IV.Community participation and networking Supervision by PHD Monitoring by central monitoring group Community monitoring through a scorecard Complex monitoring tool – need to be amended? Monitoring Group not performing since 2006 They have to use public transports to go in the field How will they manage the transition? Community scorecard left out of the monitoring tool in 2009
15
15 Contracting Phase 3 – 2009- Staff performance and remuneration Staff Performance assessment No agreement yet Staff remuneration Government budget for salaries and overtime Service Delivery Grants Revenue from user fees All other incentive schemes in place, including midwifery incentive Government budget Not linked to performance SDG 80% paid on quarterly basis 15% system performance bonus 5% kept for special circumstances Staff incentive SDG can serve to pay staff incentives but cannot account for more than 80% of staff income from all sources Decided by head of SOA No link to staff performance described UF 60% for staff incentive
16
16 Concluding remarks NGO contracting has always been seen by Cambodian policy makers as a transitional arrangement for accelerated district development Bottlenecks for regaining ownership and scaling-up still needs to be addressed: Role / capacity of PMU vs MOH departments Role of central Monitoring Group Comprehensive civil service reform Control over government budget allocation and disbursement Role / capacity of PHDs Dialogue with NGOs / oversight on their work (and their remaining role) Other influences? All incentive schemes: Midwifery, GAVI PHC block grants, GFATM, NGO initiatives (eg RACHA safe motherhood), PMG and many more Dual practice
17
17 Thank you!
18
18
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.