1 111 Eastern NC Installation Facilities and Environment Overview March 2013 CAPT Craig Fulton, USN, PE

2 222 Sequestration ? 2013 Defense Budget ? Continuing Resolution Until …? 27 March ? FSRG ? Future Defense Cuts…?

3 3 Construction Summary $3.53 Billion FY 08-12 $2,000,000 – construction per day

4 4 Camp Lejeune, New River and Cherry Point MILCON History Fiscal Year Millions of Dollars Record Year

5 5 MCIEAST North Carolina Military Construction Funding * Waiting for PRESBUD to be passed. ** Submitted in budget process to Congress. FY11 ~ Largest MILCON year for Camp Lejeune, New River, and Cherry Point. FY12 shows a significant decline in MILCON. FY13 pre-award packages are nearing completion. FY14 have been authorized for design and continue through the budget approval process. *** Future projections return to “normal” funding levels.

6 Key Installations Funding 6

7 7 USMC POM14 MILCON Summary USMC Aviation HMLA Joint Strike Fighter (JSF) CH53K MV22 Osprey Operational Marine Corps Security Force Regiment Consolidation MCTOG/MCLOG/Intel Professional Military Education The Basic School WTBn Marine Corps University Pre-decisional – Pending OSD and Congressional Budget Approval

8 8 FY12 MILCON Projects (NC) Program YearStationProject NumberProject Title Cost 2012MCAF QUANTICOP611BEQ31,374 2012MCAF QUANTICOP612Enlisted Dining Facility5,034 2012MCAF BEAUFORTP442Vertical Landing Pads F-35B21,096 2012MCAS CHERRY POINTP991H-1 Y/Z Gearbox Repair & Test Facility 17,760 2012MCAS NEW RIVERP705Aircraft Maintenance Hangar and Apron69,511 2012MCAS NEW RIVERP710Ordnance Loading Area Addition9,419 2012MCB CAMP LEJEUNEP030Squad Battle Course16,821 2012MCB CAMP LEJEUNEP12532n Combat Engineer Maint/Ops Complex75,214 2012MCB CAMP LEJEUNEP138BEQ - Wallace Creek27,439 2012MCB CAMP LEJEUNEP1383Base Entry Point and Road - Phase 281,008 FY12 MCIEAST MILCON TOTAL:354,676 2012 SOCOMMCB CAMP LEJEUNEP-1285SOF Aromory Facility Expansion6,700 2012 SOCOMMCB CAMP LEJEUNEQ419SOF Battalion Aid Station Expansion6,925 Other FY12 TOTAL:13,625

9 MCB Camp Lejeune MCB Camp Lejeune FY-12 P1383 New Entry Road, PH 2 Cost: $80.3M P1256 Mess Hall Addition Cost: $1.2M CCD: Nov 12 P1319 Camp Johnson BEQ Cost: $39.9M CCD: Sep 13 P004 SOI Motor Trans./Com Maint. Cost: $10.9M CCD: Dec 12 P1286 Stone Bay BEQ & Connector Rd. Cost: $49.1M CCD: Sep 13 P1267 French Creek Mess Hall Cost: $14.8M CCD: Feb 13 P1317 French Creek BEQ Cost: $31.6M CCD: Aug 13 P1251/1254 BEQ Cost: $67.7M CCD: Oct 13 P1264/1265 HP & FC Utility Expansion Cost: $65.8M, CCD: Oct 13 FY-12 P1253 2D Combat Eng. Maint/OPS Cost: $66.8M FY-12 P030 Squad Battle Course Cost: $14.0M P1240/1034 Anglico/Intel Maint/Ops Complex Cost: $92.6M CCD: Mar 14 Under Construction Funded Awaiting Award FY11-12 MILCON PROJECTS FY-12 P138 Wallace Creek, BEQ Cost: $23.9M FY-12 P1285 SOF Armory Expansion Cost: $6.6M CCD” Sept 13 FY-11 PQ419 Battalion Aid Station Expansion Cost: $1.6M P1249/1322/1323 Wallace Creek North BEQs & Armory Cost: $78.5M CCD: Dec 13 P1400 Energy Initiative – PV Cost: $7.5M CCD: Dec 12 FY-11 P1265B French Creek WWTP Upgrades Cost: $17.4M FY-11 P1264B Elevated Water Storage Tanks Cost: $18.8M P1246 EOD Addition Cost: $5.2M, CCD: Aug 12 MILCON Program FY-13 P-003 Staff NCO Academy Facilities $30M P-1218 SOF MSOB-Company/Team Fac. $53M P-1384 New Base Entry Road, PH 3 $44M P-1393 SOF SERE Training Facilities $5M P-1425 Overhead Range Baffle System $3M FY-14 P-1346 Simulator Center and Range Dev. $50M P-1349 Special Ops Training Complex $23M P-1353 Landfill, Phase IV $24M P-1445 Steam Decentralization – Camp Johnson $2.6M P-1447 Steam Decentralization – Hadnot Point $13.4M P-1448 Steam Decentralization – BEQ Nodes $18.7M P-1362 SOF Perf Resiliency Center $11M P-1391 SOF Sustainment Training Complex $28.6M 9

10 P652 VMMT-204 Hangar, Phase III Cost: $24.9M CCD: Sep 13 P714 Physical Fitness Center Cost: $11.7M CCD: Aug 12 P311/683/687/688 V-22 Hangars, Parallel Taxiway & Apron Expansion Cost: $138.8M CCD: May 14 MCAS New River MCAS New River FY-12 P710 Ordnance Loading Area Addition Cost: $8.2M FY-12 P705 Maint Hangar & Apron Cost: $57.6M Under Construction Funded awaiting award FY-12 P025 Replace Delalio Elementary School Cost: $20.4M MILCON Program FY-13 P-711 Personnel Admin Center $34.0M FY14 P-674 Corrosion Control Hangar $16M P-676 CH-53K Maint. Train Fac. $14M P-726 Regional Comm. Station $22M 10

11 MCAS Cherry Point MCAS Cherry Point Facilities & Facilities Upgrades (F/A-18 E/F) Cost: $14.8M CCD: Feb 12 ** (Suspension of Work I/P) Ordnance & Missile Magazines Cost: $7.2M CCD: Jul 12 / Dec 12 BEQ Cost: $38.0M CCD: Jul 13 Station Infrastructure Upgrades Cost: $5.2M CCD: Nov 12 FY-12 P-991 H-1 Y/Z Gearbox Repair & Test Facility (FRC-E) Cost: $17.1M MILCON Program FY-13 P-163 Marine Air Support Squadron Compound $34M P-601 Armory $14M Under Construction Funded Awaiting Award 11

12 12 FY13 MILCON Projects (NC) Pre-decisional – Pending Congressional Budget Approval Program YearStationProject NumberProject Title Cost 2013MCAS BEAUFORTP465F-35B Aircraft Hangar - VMFA42,010 2013MCAS BEAUFORTP459Recycling/Hazwaste Facility3,743 2013MCAS BEAUFORTP456Simulated LHD Deck F-35B12,887 2013MCAS BEAUFORTP472Airfield Security Upgrades13,675 2013MCAS BEAUFORTP427Ground Support Equip. Shop9,465 2013MCAS CHERRY POINTP163Marine Air Support Squadron Compound34,310 2013MCAS CHERRY POINTP601Armory11,581 2013MCAS NEW RIVERP711Personnel Administration Center8,525 2013MCB CAMP LEJEUNEP1384New Base Entry Point and Road Ph340,904 2013MCB CAMP LEJEUNEP003Staff NCO Academy Facilities28,986 2013 (UMC)MCB CAMP LEJEUNEP1425Overhead Range Baffle System Construction2,900 FY13 MCIEAST TOTAL:208,986 2013 SOCOMMCB CAMP LEJEUNEQ1218SOF MSOB-Company/Team Facilities52,663 2013 SOCOMMCB CAMP LEJEUNEQ1393SOF SERE Training Facilities5,389 Other FY13 TOTAL:58,052

13 FY14 MILCON Projects (NC) As identified in USMC FY14 MILCON budget proposal. Program YearStation Project Number Project Title Cost 2014MCLB AlbanyP954CERS Dispatch Facility1,010 2014MCLB AlbanyP934Weapons Storage/Inspection Facility15,600 2014MCAS BeaufortP473Townsend Bombing Range Land Acq. Ph. 163,170 2014MCAF QuanticoP1406ATC TX/RX Relocation3,630 2014MCAS New RiverP726Regional Communication Station20,098 2014MCAS New RiverP676CH-53K Maintenance Training Facility13,218 2014MCAS New RiverP674Corrosion Control Hangar12,547 2014MCB Camp LejeuneP1349Special Operations Training Complex22,515 2014MCB Camp LejeuneP1353Landfill, Phase IV20,795 2014MCB Camp LejeuneP1445Steam Decentralization - Camp Johnson2,620 2014MCB Camp LejeuneP1447Steam Decentralization - Hadnot Point13,390 2014MCB Camp LejeuneP1448Steam Decentralization - BEQ Nodes18,679 FY14 MCIEAST TOTAL:207,272 2014 SOCOMMCB Camp LejeuneP1362SOF Performance Resliency Center11,000 2014 SOCOMMCB Camp LejeuneP1391SOF Sustainment Training Complex28,600 Other FY14 TOTAL:39,600

14 14 Facilities Sustainment Restoration and Modernization (FSRM) Program Types of Work All things maintenance and repair Barracks Renovations Mechanical/HVAC Replacements Roof Repairs/Replacements Utility System Upgrades Demolition Fire Protection System Energy Improvements Paving Painting All new construction less than $750K

15 15 FY12 “Maintenance and Repair” Construction Program MCIEAST North Carolina installations –Ranges from painting to complete building renovation –$160 million awarded for more than 500 projects Projects range from a few thousand to several million dollars –Camp Lejeune $80 million awarded –New River $24 million awarded –Cherry Point $56 million awarded FY13 funding will be similar to last year (?) –Contract awards pushed to 4 th Qtr Funding projections beyond FY13 remain steady (?)

16 Planned 2013 M2/R2 Projects MCAS New River ~ $15M ESTIMATE TITLESPEC PROG < $100K DEMOLISH THE UTILITY PLANT BUILDING AS5001A, AS190A, AS191ADEMO $500 - 1000K AS518 -- ENERGY EFFICIENCY REPAIRSEIP $500 - 1000K AS215 - ENERGY EFFICIENCY REPAIRSEIP $500 - 1000K AS4020 -- ENERGY EFFICIENCY REPAIRSEIP $1M-$2M REPAIR BLDG AS518M 500 - 1000K REPAIR THE ELEVATED POTABLE WATER STORAGE TANK AS2010M $2M+ REPAIR THE FAMILY SERVICE CENTER BUILDING AS215M $1M-$2M REPAIR THE AIRFIELD PARKING APRON SURFACES 11320.M $4M+ BLDG. AS4020 INTERIOR/EXTERIOR REPAIR PROJECTM < $500K AS518 ELECTRICAL UPGRADESR < $500K AS4100 ELECTRICAL UPGRADESR $500 - 1000K AS4108 ELECTRICAL UPGRADESR $500 - 1000K AIR CONDITIONING UPGRADES AS4108R $500 - 1000K CONVERT AS215 TO FAMILY SERVICE CENTERR

17 Planned 2013 M2/R2 Projects MCAS Cherry Point ~ $30M ESTIMATE TITLESPEC PROG $500K - $1M FACILITY ENERGY REPAIRS, BLDG 3989EIP < $100K FACILITY ENERGY IMPROVEMENTS, BLDG 3989EIP $1M - $2M FACILITY ENERGY REPAIRS BUILDING 4401EIP $500K - $1M FACILITY ENERGY REPAIRS, BLDG 163EIP < $500K FACILITY ENERGY IMPROVEMENTS, BLDG 163EIP $500K - $1M FACILITY ENERGY REPAIRS, OPTIMIZATION OF COMPRESSED AIR SYSTEIP $500K - $1M FACILITY ENERGY IMPROVEMENTS, STORMWATER DIVERSION SYSTEMEIP < $500K FACILITY ENERGY REPAIRS, BLDG 8052EIP < $3M FACILITY ENERGY REPAIRS, BLDG 4166EIP < $3M FACILITY ENERGY REPAIRS, BLDG 4167EIP < $3M FACILITY ENERGY REPAIRS, BUILDING 4335EIP $500K - $1M FACILITY ENERGY REPAIRS, BLDG 3769EIP < $100K FACILITY ENERGY IMPROVEMENTS, BLDG 3769EIP < $100K FACILITY ENERGY IMPROVEMENTS, BLDG 8052EIP

18 Planned M2/R2 Projects MCAS Cherry Point ~ $30M ESTIMATE TITLESPEC PROG < $500K CONSTRUCT CONTAMINATED SOIL CONTAINMENT AREAENV1 < $500K CP13E10R CONSTRUCT BLDG 4532 BLASTBOOTHENV3 < $3M REPAIRS TO BEQ BLDG 4166M < $3M REPAIRS TO BEQ BLDG. 4167M < $5M AIRFIELD PAVEMENT REPAIRSM $1M - $2M REPAIRS TO TRAINING CENTER BLDG. 4335M $500K - $1M REPAIRS TO WAREHOUSE BLDG. 151M $500K - $1M REPAIR WWT POND LINERS AT MCALF ATLANTICME1 $1M - $2M REPAIRS TO WWTP BLDG. 4376ME2 $500K - $1M CP13E08M REPLACE BLDG 4532 BLASTBOOTHME3 < $500K IMPROVEMENTS TO BLDG 4576OSHA $500K - $1M IMPROVEMENTS TO BEQ BLDG. 4166R $500K - $1M IMPROVEMENTS TO BEQ BLDG. 4167R $500K - $1M CONSTRUCT FUELS BUILDING AT BOGUE FIELDR < $500K INSTALL A/C SYSTEM BLDG 9012 AT BT-11RANG

19 Planned 2013 M2/R2 Projects MCB Camp Lejeune ~ $42M CWETITLE SPEC PROG $1M - $2M422 -- ENERGY EFFICIENCY REPAIRSEIP < $750K1775 -- ENERGY EFFICIENCY REPAIRSEIP < $750KFC280 -- ENERGY EFFICIENCY REPAIRSEIP < $750KFC520 -- ENERGY EFFICIENCY REPAIRSEIP < $500KFC400 - BOILER MODIFICATIONSEIP < $750KFC411 - BOILER MODIFICATIONSEIP < $750KFC412 - BOILER MODIFICATIONSEIP < $750KFC413 - BOILER MODIFICATIONSEIP < $750KFC414 - BOILER MODIFICATIONSEIP < $750KFC415 - BOILER MODIFICATIONSEIP < $750KFC416 - BOILER MODIFICATIONSEIP < $500KFC500 - BOILER MODIFICATIONSEIP < $750KFC515 - BOILER MODIFICATIONSEIP < $750KFC530 - BOILER MODIFICATIONSEIP < $750KFC550 - BOILER MODIFICATIONSEIP < $750KFC555 - BOILER MODIFICATIONSEIP < $750KFC560 - BOILER MODIFICATIONSEIP < $750KFC565 - BOILER MODIFICATIONSEIP < $500KFC571 - BOILER MODIFICATIONSEIP < $500KFC573 - BOILER MODIFICATIONSEIP < $500KFC572 -- BOILER MODIFICATIONSEIP

20 Planned 2013 M2/R2 Projects MCB Camp Lejeune ~ $42M CWETITLESPEC PROG < $750KDEMOLISH ABANDONED RAILROAD TRACK LOCATED BOARD MCB CAMP - UN430 DEMO < $500KDEMOLISH THE SMALL ARMS STORAGE FACILITY FC302.DEMO < $100KENVIRONMENTAL DESIGN FUNDS FOR LE13EMD00RENV1 < $750KFY14 REMEDIATION SYSTEM CONSTRUCTIONENV1 < $500KCONSTRUCT FRT RESPONSE EQUIPMENT BOAT HOUSESENV2 < $500KINSTALL FIRE TRAINING SIMULATOR IN TP460 2ND DECKFIRE < $750KREPLACE FIRE ALARM SYSTEMFIRE $2M - $3MMAJOR INTERIOR/EXTERIOR REPAIRS BUILDING 422 (REVALIDATED)M < $750KINT/EXT REPAIRS TO M326 (REVALIDATED)M < $1MMAJOR INTERIOR REPAIRS TO BLDG FC364M < $750KMAJOR INTERIOR REPAIRS TO BUILDING 1775M $1M - $2MINTERIOR AND EXTERIOR REPAIRS TO FC280M $2M - $3MREPAIR BLDG FC520M $2M - $3MREPAIR BLDG BB265M $1M - $2MREPAIR THE VEHICLE MAINTENANCE SHOP FACILITY 1829.M < $750KREPAIR THE ELEVATED POTABLE WATER STORAGE TANK SM623.M < $750KUST REMOVALS AND AST UPGRADESME1 < $1MREPLACEMENT DRINKING WATER WELLS - MARINES ROADME1 < $750KCONVERT RR3 TO ACADEMIC INSTRUCTION FACILITYR < $750KREPLACE TOWER LZ STARLINGR < $500KEXPAND MEDIUM GIRDER BRIDGE CHBR < $500KCONSTRUCT OBSERVATION TOWER SOUTHSIDE G10 AREARANG < $750KHOME STATION TRAINING LANE INSTRUCTORS BUILDINGRANG

21 MCCS Maintenance Repair Program MCCS Project TitleEstimate Temporary Lodging Facility Addition (Complete June 2013) $11,090,000 New Marine Mart, Onslow Beach (Complete March 2013) $ 1,172,000 Marine Mart Addition/Renovation, French Creek (Complete May 2013) $ 3,205,000 Marine Mart Addition/Renovation, Gonzales Blvd (Begin Construction May 2013) $ 2,187,000 New Marine Mart, Wallace Creek (Begin Construction June 2013 $ 6,941,000 Temporary Lodging Facility Renovation (Begin Construction June 2013) $ 7,861,000 Renovate Field House 751 ** $ 2,239,000 New Marine Mart, Knox Area (FY16) $ 4,675,000 New Marine Mart, Brewster Blvd (FY14) $ 3,183,000 ** All USACE except Renovate Field House 751

22 22 Take Aways … More than $300 million in construction opportunities in Eastern NC this year. –Project size varies widely, from a few thousand dollars to tens of millions each. FY11 was a “record setting” year FY12 was the last “larger than normal” year. FY13 and beyond returning to “normal”…or less. Energy has become a significant focus for the USMC Still more than $2 billion currently under construction –In various stages of construction Record years behind us but still significant work ahead –Approximately $300 million (?) each year over next few years

23 23 Regional Installation Facilities and Environment Overview

24 24 Overview of Contracting Tools by NAVFAC CDR Scott Cloyd

25 Midlant A/E Contracts Indefinite Delivery Indefinite Quantity (IDIQ) Active ContractsFirm Award Date Expiration Date Maximum Amount Value Engineering and Cost Estimating Downey and Scott03/200903/2014$5M/Life Architectural Design and Engineering Services HBA02/201002/2015$15M/Life Architectural Design and Engineering Services AECOM02/201002/2015$15M/Life Civil Design and Engineering ServicesRichard Catlin03/201003/2015$7.5M/Life Utilities Engineering ServicesAECOM03/201003/2015$30M/Life Civil Design and Engineering ServicesC. Allan Bamforth, Jr.06/201006/2015$7.5M/Life 25

26 Active Contracts Firm Award Date Expiration Date Maximum Amount Business Type MechanicalWiley & Wilson05/200805/2013$4MLB ArchitectureMaune Belangia Faulkenberry06/200806/2013$4MSB Architecture Walker Group Architecture Inc. 06/20086/2013$4MSDBWO PlanningHBA/VHB Joint Venture07/200807/2013$3MLB Architecture Talley & Smith Architecture Inc. 07/200807/2013$4MSB CivilAvolis Engineering03/200903/2014$4MSB CivilC. Allen Bamforth06/200906/2014$4MSB OICC Local A/E Contracts Indefinite Delivery Indefinite Quantity (IDIQ) 26

27 Cherry Point Local A/E Contracts Active ContractsFirm Award Date Expiration Date Maximum Amount Business Type Mechanical & ElectricalCEMS02/200902/2013$3.5MSDVOSB Civil/StructuralNRW Engineering02/200902/2013$2.5MSB Mechanical & ElectricalBowman, Foster, & Associates05/200905/2013$3.5MVOSB Civil/StructuralGreenhorne & O’Mara05/200905/2013$2.5MLB Architectural Maune, Belangia, & Faulkenberry 05/201005/2014$3.5MSB ArchitecturalWalker Group06/201006/2014$3.5MWOSB ArchitecturalDJG, Inc06/201006/2014$3.5MLB EnvironmentalMACTEC09/201009/2014$4.0MLB EnvironmentalEEE Inc.09/201009/2014$4.0MSDB, 8A Indefinite Delivery Indefinite Quantity (IDIQ) 27

28 Midlant D/B MACC Firm Award Date Existing Option Expiration Date Maximum Amount Remaining Capacity DCK North America, LLC 08/16/20102 nd Option08/16/2013$750M/Life $613.7 M for Life Whiting-Turner Contracting Company 08/16/20102 nd Option08/16/2013$750M/Life $613.7 M for Life Walbridge Aldinger Company 08/16/20102 nd Option08/16/2013$750M/Life $613.7 M for Life Sundt Construction, Inc.08/16/20102 nd Option08/16/2013$750M/Life $613.7 M for Life Hardin-WGI Joint Venture 08/16/20102 nd Option08/16/2013$750M/Life $613.7 M for Life 28 Design Build MACC Awarded as Base + Option Years

29 MACC Status Active MACCS Award Date Existing Option Expiration Date Maximum Amount Remaining Capacity General Mini01/13/20093 rd Option01/12/2013$20M/yr.$12.9 M (for option period) 8(a)03/07/20111 st Option03/06/2013$100M/Life$94.8 M (for life of contract) Mechanical04/28/20093 rd Option04/27/2013$300M/Life$193 M (for life of contract) Painting05/11/20102 nd Option05/10/2013$100M/Life$95.6 M (for life of contract) HubZone08/16/20111 st Option08/15/2013$100M/Life$94 M (for life of contract) Civil/Paving09/01/20093 rd Option08/31/2013$90M/Life$11 M (for life of contract) Roof09/09/20102 nd Option09/08/2013$100M/Life$90.9 M (for life of contract) General (SB)09/15/20102 nd Option09/14/2013$450M/Life$320 M (for life of contract) 29

30 New MACCSAward Date Maximum Amount Status SDVOSB (Proposed New) TBD$100MAcquisition Planning Civil/PavingTBD$100MAcquisition Planning New MACCs 30

31 Services Contracts Status – OICC Active Contracts Award Date Existing Option Expiration Date Award Amount (Including Options) Current Contract Value Wood Grinding and Yard Waste Grinding and Concrete Crushing at Landfill 09/21/11 1 st Option 09/20/13$2,674,110$891,180 Boiler Controls at Building 170009/22/111 st Option09/30/13$241,992$73,729 EMCS at NH10009/22/111 st Option09/30/13$3,778,237$2,478,923 Pest Control09/30/12Base Year09/30/13$662,340$132,468 Cleaning of Breach/Shoot Houses 09/30/111 st Option09/30/13$899,880$636,619 Multiple Service Contract09/30/111 st Option09/30/13$2,793,466$1,431,826 Operation of Onslow Beach Bridge 09/26/12N/A09/30/12$97,020 Custodial, Naval Hospital & Med/Dental Clinics 09/26/083 rd Option09/30/13$14,588,809$18,429,706 31

32 Services Contracts Status – OICC Active Contracts Award Date Existing Option Expiration Date Award Amount (Including Options) Current Contract Value Bullet Trap Management01/01/093 rd Option12/03/12$445,000$289,383 Veeder Root System Repair & Maintenance 12/27/07 4 th Option 12/27/12$408,100$375,296 Grounds Maintenance, Outlying Roads 06/16/08 3 rd Option 12/31/12$3,075,907$3,222,547 Morehead City Port Refuse Service 01/01/09 3 rd Option 12/31/12$13,379$10,542 Custodial Services, Basewide02/01/102 nd Option01/31/13$5,276,284$4,775,592 Outdoor Pool Service Contract02/01/102 nd Option01/31/13$85,250$50,212 Sampling & Analysis of Wells02/01/111 st Option01/31/13$702,940$227,745 Service For Uninterrupted Power02/19/102 nd Option02/15/13$251,100$223,155 32

33 Services Contracts Status – OICC Active Contracts Award Date Existing Option Expiration Date Award Amount (Including Options) Current Contract Value Scale Hardware/Software Support for Landfill 11/04/092 nd Option02/17/13$35,325$32,032 Maintenance/Repair Railroad Trackage 03/30/12Base03/29/13$1,375,400$520,670 Facilities Maintenance Support Services 01/07/102 nd Option03/31/13$187,326,438$64,497,195 Grounds Maintenance MCAS NR, Camp Geiger and Johnson 03/20/084th Option03/31/13$4,246,081$4,484,459 Grounds Maintenance Mainside03/27/084 th Option03/31/13$9,448,548$11,034,477 Shrub/Flower Bed Maintenance05/01/12Base04/30/13$3,801,984$953,237 Maintenance & Certification of Cranes, Basewide 05/01/111 st Option04/30/13$984,620$672,776 M&R Screw Pumps, MCBCL06/01/102 nd Option05/31/13$496,843$293,636 33

34 How do I get this work? To be a Prime Contractor –Register in the Central Contractor Registration (CCR) –Obtain a Duns & Bradstreet Number (DUNS) To Subcontract –Contact any of the following (Names & POCs listed in handout) Multiple Award Construction (MAC) Contractor Base Operating Support Contract (BOSC) Housing Privatization Contractor –Meet the minimum requirements to gain access the base 34

35 Solicitation & Award Venues: –Federal Business Opportunities (FedBizOpps) address – https://www.fbo.gov –Navy Electronic Commerce Online (NECO) address – https://www.neco.navy.mil –POC: Sharon Taylor, Supervisory Contract Specialist NC IPT, (757) 322-8258 –POC: Jerry Williams, Acquisition Director, OICC MCI East, Camp Lejeune, (910) 451-2581 X5236 How do I find this work? 35

36 36 Questions