1 Production Procedure for RX Manpower Arrangement Demonstration Production Schedule

2 Production Procedure for RX

3 Flow chart for RX production RX-fiber subassemblyRX subassembly unburned RX module burned RX module check point

4 RX-fiber subassembly striping and cleaving making MT connector attaching V-groove checking the cleaved ends wrapping bare fibers with blue tape removing blue tape inspecting the polished end of MT removing blue tape assembling MTP Visual inspection wrapping bare fibers with blue tape step 1 step 2 step 3 Warehouse Batch storage

5 RX subassembly attaching PDA to carrier PCB baking 25 RX subassemblies wire-bonding PDA to RX chip visual inspection labeling and placing covers step 4 Warehouse

6 unburned RX module alignment with RX subassembly and RX-fiber check DC function of RX subassembly check DC function of RX subassembly assembling both with UV-glue check DC function of RX subassembly placing the cover sealing the cover in nitrogen chamber check AC function of RX module step 5 step 6 Warehouse

7 burned RX module setup the temperature- controlled chamber with unburned RX module burn-in for 3 days check AC function of burned RX module step 7 Warehouse

8 Manpower Arrangement

9 total manpower for DOIM 1 engineer Mose 2 assistant engineer Shan, Tom 1 supporting engineer( 2 days) Arch 1 operator Peter 1 student Anda

10 Arrangement for manpower RX-fiber subassemblyRX subassembly unburned RX module burned RX module step 1,2 ( Tom,Anda) step3 (Peter)step 4 (Arch) step 5 (Shan) step 6 (Mose) step 7 (Mose)

11 Production Schedule

12 Old schedule Nov Dec Jan 99’Feb Mar Apr 100 120 120 120 120 120RX finished : unburned 175 burned 56

13 Yield for RX RX-fiber subassemblyRX subassembly unburned RX module burned RX module 94.2%92% 93% 98%

14 Production rate for RX per week RX-fiber subassemblyRX subassembly unburned RX module burned RX module >100 100

15 Throughput for RX per week RX-fiber subassemblyRX subassembly unburned RX module burned RX module 94.2% X 100 = 9492% X 100 = 92 99% X 92 = 91 98% X 91 = 89

16 Demonstration


Download ppt "Production Procedure for RX Manpower Arrangement Demonstration Production Schedule."